Ny Mercantile Exchange, Manhattan
Manhattan • Block 00016 • Lot 0225 • Zip: 10281
Condition
What the city currently has open against this building, counted from its own records.
Address
Land use and zoning
Building
Latest assessment
Neighborhood
The area this lot falls inside, and the commute Hoodkit measures from it.
Getting around
Estimated 3 days ago- Fulton Street 19 min 6 walking, 13 riding
- Penn Station 22 min 6 walking, 16 riding
- Times Square 23 min 6 walking, 17 riding
- Downtown Brooklyn 25 min 6 walking, 19 riding
- Union Square 26 min 6 walking, 20 riding
- Grand Central 30 min 6 walking, 24 riding
Around this address
Transit and places within 0.5 miles of the lot.
Getting out
Subway
Railroad
Ferry
Bus
Citi Bike
Places nearby
Metropolis
No description yet
Huso
No description yet
Restaurant Marc Forgione
No description yet
Epicerie Boulud
No description yet
Golden Hour at One40
No description yet
Chambers
No description yet
Epic.Now X Icca VR Experience
No description yet
Chambers
No description yet
Activity
Sales, filings, permits and violations from every dataset, in one order.
2026
2024
-
Alteration Type III
INSTALL OF TEMP PLATFORMS, TRUSSES, SCENIC ELEMENTS, NO ALTERATIONS TO EXIST STRUCTURES, FOR HERMES OPENING EVENT. TP...
-
CLASS - 2
OBSVD 3 SUSPENDED SCAFFOLDS AT EXP# 2 & 3 WITH TIE-BACKS AND LIFELINES INSTALLED CONTRARY TO APRVD PLANS- BEAMS TIED ...
2023
-
Alteration Type II
MODIFICATIONS TO AN EXISTING SPRINKLER SYSTEM AS SHOWN ON PLANS FILED.
-
Alteration Type II
MODIFICATION TO EXISTING SPRINKLER SYSTEM AS PER PLANS. NO CHANGE IN USE EGRESS OR OCCUPANCY.
-
Alteration Type II
REMOVAL AND INSTALLATION OF INTERIOR NON BEARING PARTITIONS AND RELATED FINISHES AS PER PLANS FILED HEREWITH. NO CHAN...
2022
-
Alteration Type II
INSTALLATION OF INTERIOR NON BEARING PARTITIONS AND RELATED FINISHES AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, E...
-
Alteration Type II
REMOVAL OF INTERIOR NON BEARING PARTITIONS AND RELATED FINISHES AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS...
2021
-
DOB violation Jan 19, 2021
E-ELEVATOR ELEVATORREQUIRED
2020
-
DOB violation Jan 8, 2020
E-ELEVATOR ELEVATORREQUIRED
2019
-
DOB violation Jan 16, 2019
E-ELEVATOR ELEVATORREQUIRED
2018
-
DOB violation May 31, 2018
FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED
FAILED TO FILE FISP CYCLE 8A TECHNICAL REPORT BY 02/21/2017
2014
-
CLASS - 1
97B07 97B-IMPROPERLY RIGGED DEVICE TO SAFELY,DISMANTLED/REMOVE RESULTING IN WORKER BEING INJURED-SAFEGUARD
-
CLASS - 2
PARTIAL SWO ISSUED FOR 4 POLE WORK PLATFORM PUSUANT 28-207.2 WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCUMENTS...
2013
-
DOB violation Jan 31, 2013
FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED
FAILED TO FILE FISP CYCLE 7A TECHNICAL REPORT BY 02/21/2012
2012
-
DOB violation Jan 1, 2012
BENCH-FAILURE TO BENCHMARK NONE
FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
The most recent 6 events from each dataset, so no one source takes the axis. Each tab holds the full record.
Property Contacts
Contact information aggregated from multiple government sources
Building Permits
Owner information from Department of Buildings filings
Recent Building Permits
Owner information from recent DOB NOW filings
Deed Records
Parties from ACRIS deed and mortgage records
Property Records
Owner information from assessment and PLUTO records