110 Maiden Lane
Manhattan • Block 00039 • Lot 0012
Condition
What the city currently has open against this building, counted from its own records.
Address
Land use and zoning
Building
Latest assessment
Activity
Sales, filings, permits and violations from every dataset, in one order.
2025
-
Subdivision Condominiums
SUBDIVIDE EXISTING TAX LOT INTO FOUR CONDO TAX LOTS. NO CHANGE TO ZONING UNDER THIS APPLICATION.
2024
-
DOB violation May 23, 2024
C-CONSTRUCTION OTHER OPTIONAL
STRUCTURE RENDERED NON COMPLAINT. AT TIME OF INSPECTION OBSERVED WINDOW GLASS BROKEN, AND 2 INDIVIDUAL INJURED AT 38 ...
2023
-
Alteration Type III
TEMPORARY SHORING AS PER DRAWINGS. TEMPORARY SHORING SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANG...
-
DOB violation Oct 4, 2023
AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE
FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
-
CLASS - 1
RESPONDING TO AN INCIDENT WHERE WORKER CHRISTIAN CHAVEZ SCRATCHED HIS ARM, I OBSERVED 38ST BUILDING WITH INTERIOR REN...
-
CLASS - 1
FAILED TO NOTIFY THE DEPARTMENT OF AN INCIDENT THAT RESULTED IN A FATALITY OR INJURY.NOTE:A WORKER INJURIED HIS FINGE...
-
CLASS - 1
AT TIME OF INSPECTION I OBSERVED CONSTRUCTION AND DEMOLITION ACTIVITIES ON VARIOUS FLOORS OF AN OCCUPIED BUILDING, US...
-
CLASS - 1
IN RESPONSE TO AN INCIDENT WHERE A WORKER TIM MCALEESE PINCHED HIS FINGER WHEN MOVING METAL PLATES MATERIALS WITH A F...
2022
-
DOB violation Dec 1, 2022
EGRADE-FAILURE TO POST ENERGY GRADE/SCORE NONE
FAILURE TO DISPLAY ENERGY EFFICIENCY SCORE AND ENERGY EFFICIENCY GRADE AS PER ADCODE SEC. 28-309.12.3
-
Alteration Type II
FILING FOR REPLACEMENT OF EXISTING STOREFRONT IN KIND AND RENOVATION OF EXISTING LOBBY AS SHOWN ON PLANS FILED HEREWI...
2021
-
Alteration Type III
INSTALLATION OF TEMPORARY PLYWOOD ENCLOSURE AS PER DRAWINGS. TEMPORARY PLYWOOD ENCLOSURE SHALL COMPLY WITH CHAPTER #3...
-
Alteration Type III
INSTALLATION OF TEMPORARY WORK PLATFORM AS PER DRAWINGS. TEMPORARY WORK PLATFORM SHALL COMPLY WITH CHAPTER #33 OF THE...
-
Alteration Type III
INSTALLATION OF TEMPORARY TROLLEY BEAM SYSTEM AS PER DRAWINGS. TEMPORARY TROLLEY BEAM SYSTEM SHALL COMPLY WITH CHAPTE...
-
DOB violation Jan 6, 2021
AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE
FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
2020
-
CLASS - 1
BC 3303.10 OPERATIONS IN OCCUPIED BUILDINGS. NOTE-AT THE TIME OF MY INSPECTION OF AN ACTIVE JOB SITE,CONSTRUCTION WOR...
-
CLASS - 1
BC 3303.12.4 CONVERTING ELEVATORS. NOTE=AT THE TIME OF MY INSPECTION OF AN ACTIVE JOB SITE,I OBSERVED 2 FREIGHT ELEVA...
-
DOB violation Feb 3, 2020
E-ELEVATOR ELEVATORREQUIRED
2019
-
DOB violation Sep 3, 2019
LL2604S-SPRINKLER NONE
FAILED TO FILE FINAL SPRINKLER REPORT BY JULY 1, 2019
The most recent 6 events from each dataset, so no one source takes the axis. Each tab holds the full record.
Property Contacts
Contact information aggregated from multiple government sources
Building Permits
Owner information from Department of Buildings filings
Deed Records
Parties from ACRIS deed and mortgage records
Property Records
Owner information from assessment and PLUTO records