30-36 Cortlandt Alley, Manhattan
Manhattan • Block 00196 • Lot 0031 • Zip: 10013
Condition
What the city currently has open against this building, counted from its own records.
Address
Land use and zoning
Building
Latest assessment
Neighborhood
The area this lot falls inside, and the commute Hoodkit measures from it.
Getting around
Estimated 4 days ago- Union Square 20 min 4 walking, 16 riding
- Downtown Brooklyn 23 min 4 walking, 19 riding
- Grand Central 24 min 4 walking, 20 riding
- Times Square 25 min 4 walking, 21 riding
- Penn Station 25 min 4 walking, 21 riding
- Fulton Street 26 min 4 walking, 22 riding
Around this address
Transit and places within 0.5 miles of the lot.
Getting out
Subway
Railroad
Ferry
Bus
Citi Bike
Places nearby
Bubby's
No description yet
Santo Taco
No description yet
Balthazar
No description yet
Thai Diner
Thai Diner is a cozy and vibrant spot in the heart of NYC's Chinatown serving up traditional Thai comfort food with a...
Lei
No description yet
Jungsik
No description yet
Oriana
No description yet
Maxi's Noodle 3
Maxi's Noodle 3 is a cozy eatery in Chinatown serving up delicious and authentic noodle dishes. With a casual and wel...
Activity
Sales, filings, permits and violations from every dataset, in one order.
2026
2025
-
DOB violation Nov 14, 2025
HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED
VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL HGH PRESSURE INSPECTION
-
DOB violation Nov 14, 2025
HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED
VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL HGH PRESSURE INSPECTION
-
DOB violation Nov 14, 2025
HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED
VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL HGH PRESSURE INSPECTION
-
DOB violation Nov 14, 2025
HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED
VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL HGH PRESSURE INSPECTION
-
DOB violation Nov 14, 2025
HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED
VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL HGH PRESSURE INSPECTION
-
DOB violation Nov 14, 2025
HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED
VIOLATION ISSUED-FAILURE TO FILE 2024 INTERNAL HGH PRESSURE INSPECTION
2022
-
CLASS - 2
FOUND WEIL MCLAIN BOILER MODEL LGB-11 CP#6321343 ACTIVE WITH DEFECTS. CORRECT ALL VIOLATING CONDITIONS AND SUBMIT A C...
2021
-
CLASS - 1
FAILURE TO MAINTAIN BUILDING IN CODE-COMPLAINT MANNER I OBSERVE IN THE CELLAR USING LAMP WICK ON GAS LINES. ALSO IN C...
2019
2017
-
Alteration Type II
REPLACE GAS-FIRED DIRECT VENT BOILER AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
2016
-
CLASS - 1
GAS BEING SUPPLIED TO BLDG W/O INSPECTION AND CERTIFICATION BY DOB.AT TIME OF INSPECTION (2:30PM) I OBSERVED GAS ON A...
-
CLASS - 1
FAILURE TO HAVE NEW OR ALTERED PLUMBING SYSTEM TESTED. AT TIME OF INSPECTION (2:30PM) I OBSERVED GAS ON AND BEING USE...
-
Alteration Type II
INSTALLATION OF MANUAL, AUTOMATIC SMOKE/HEAT DETECTION AND SPRINKLER FA SYSTEM. NO CHANGE IN EGRESS, OCCUPANCY OR USE.
-
CLASS - 3
50A,50B. FULTON V.T. BOILER, 15HP,NB34981,NP STEAM, GAS, 1979; 50A- EVIDENCE OF ASH ACCUMULATION IN THE COMBUSTION CH...
2015
-
Alteration Type II
FACADE REPAIR PER PLAN. NO CHANGE IN USE, EGRESS OR IN OCCUPANCY.
2014
-
Alteration Type III
INSTALLATION OF HEAVY DUTY SIDEWALK SHED OF 102 LF AS PER PLANS. SHED IS DESIGNED FOR A LIVE LOAD OF 300 PSF. ALL WOR...
2013
-
Alteration Type III
INSTALLATION OF PIPE SCAFFOLD AS PER PLANS. ALL WORK SHALL BE ACCORDING TO CHAPTER #33 OF THE 2008 NYC BUILDING CODE....
2009
The most recent 6 events from each dataset, so no one source takes the axis. Each tab holds the full record.
Property Contacts
Contact information aggregated from multiple government sources
Building Permits
Owner information from Department of Buildings filings
Recent Building Permits
Owner information from recent DOB NOW filings
Deed Records
Parties from ACRIS deed and mortgage records
Property Records
Owner information from assessment and PLUTO records