ECB violations
70 Bayard Street, Manhattan • Block 00201 • Lot 0034
29 records
Environmental Control Board violations, which carry a hearing and a penalty.
| Issued | Violation | Status | Severity | Description | Penalty | Balance due | Hearing |
|---|---|---|---|---|---|---|---|
| Jul 30, 2025 | 35691045R | RESOLVE | CLASS - 1 | BC 1208.2. FAILURE TO COMPLY WITH MINIMUM CEILING HEIGHTS. NOTED: AT CELLAR LEVEL HAS BEEN CONVERTED/OCCUPIED AS MASS... | $2,500 | $2,500 | Nov 20, 2026 |
| Jul 30, 2025 | 35691044P | RESOLVE | CLASS - 1 | FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER: LACK OF REQUIRED NUMBER OF MEANS OF EGRESS FOR EVERY FLOOR PER... | $2,500 | $2,500 | Nov 20, 2026 |
| Jul 30, 2025 | 35691042L | RESOLVE | CLASS - 2 | ILLEGAL USE IN A COMMERCIAL DISTRICT. UNLICENSED PHYSICAL TREATMENT ESTABLISHMENT A PROHIBITED USE PER ZR 12-10, OPER... | $0 | $0 | Oct 9, 2025 |
| Jul 30, 2025 | 35691043N | RESOLVE | CLASS - 1 | OCCUPANCY CONTRARY TO THAT ALLOWED BY THE DEPT. OF BUILDING RECORDS. ILLEGAL OCCUPANCY NOTED: AT CELLAR LEVEL HAS BEE... | $6,250 | $6,250 | Nov 20, 2026 |
| Dec 16, 2024 | 37032000R | RESOLVE | CLASS - 2 | FAILURE TO FILE REQUIRED ANNUAL BOILER INSPECTION REPORTS FOR LOW-PRESSURE BOILER 10000023329Y0001 IN ACCORDANCE WITH... | $0 | $0 | Apr 3, 2025 |
| Apr 18, 2024 | 39111971H | ACTIVE | CLASS - 2 | AS PER ONE AO SMITH BOILER, MODEL NO. HW-420. ANS Z21.13-2013. BUILT 2016. BOILER NOT REGISTERED. CORRECT VIOLATING C... | $625 | $0 | Jun 27, 2024 |
| Aug 2, 2023 | 35673272H | RESOLVE | CLASS - 2 | OCCUPANCY CONTRARY TO THAT ALLOWED BY DOB RECORDS. ILLEGAL OCCUPANCY NOTED AT CELLAR LEVEL HAVING BEEN CONVERTED/OCCU... | $1,280 | $0 | Oct 12, 2023 |
| Aug 2, 2023 | 35673271X | RESOLVE | CLASS - 2 | ILLEGAL USE IN A COMMERCIAL DISTRICT. UNLICENSED PHYSICAL TREATMENT ESTABLISHMENT, A PROHIBITED USE AS PER ZR 12-10 I... | $1,280 | $0 | Oct 12, 2023 |
| Apr 3, 2019 | 35408028Z | RESOLVE | CLASS - 1 | FAILURE TO PROVIDE UNOBSTRUCTED PASSAGEWAY AT TIME OF INSPECTION IN ANOCCUPIED COMMERCIAL/MIXED BLDG W/ACTIVE MESSAGE... | $3,125 | $0 | Jun 6, 2019 |
| Apr 3, 2019 | 35407820H | RESOLVE | CLASS - 1 | USE OF PROHIBITED HARDWARE. AT THE TIME OF INSPECTION NOTED AT CELLARLEVEL 1 DOOR WITH KEYLOCKS AND ONE WITH KEY LOCK... | $6,250 | $0 | Jun 6, 2019 |
| Mar 26, 2019 | 35407803X | RESOLVE | CLASS - 1 | FAILURE TO PROVIDE UNOBSTRUCTED EXIT PASSAGEWAY. NOTED: PREMISES 7 STORY ATTACHED MASONRY FRAME NFP BUILDING IN COMME... | $1,250 | $0 | Jun 6, 2019 |
| Mar 26, 2019 | 35407802Y | RESOLVE | CLASS - 1 | FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER.USE OF PROHIBITED DOOR AND OR HARDWARE PER BC 1008.1.8;27-371(J... | $1,250 | $0 | Jun 6, 2019 |
| May 16, 2016 | 32076493R | RESOLVE | CLASS - 2 | B265; 50. AS PER CLASS 2 (B265) 28-303.7 FAILURE TO FILE A COMPLETE BOILER INSPECTION REPORT AS PER DOB RECORDS.SUBMI... | $1,250 | -$1,250 | Jun 30, 2016 |
| Apr 3, 2016 | 35180135X | RESOLVE | CLASS - 1 | FAILURE TO MAINTAIN BLDG WALLS. NOTED: AT ROOF LEVEL STUCCO MATERIAL FASTEN TO FACADE HAS COME LOOSE & IS NOW IN DANG... | $1,000 | $0 | May 19, 2016 |
| May 27, 2011 | 34752194K | RESOLVE | CLASS - 2 | FAILURE TO COMPLY W/THE COMMISSIONER'S ORDER TO FILE A C/O W/DOB. RESPONDENT FAILED TO CORRECT THE VIO CONDITIONS & F... | $4,000 | -$1,816 | Jul 14, 2011 |
| Mar 14, 2011 | 34902925X | RESOLVE | CLASS - 1 | FAILURE TO MAINTAIN EXTERIOR BLDG NOTED:SOUTH ELEVATION(EXP#1) IMPROPERLY INSTALLED A/C'S W/BRICK'S ON SILLS.WEST ELE... | $1,000 | -$346 | Apr 28, 2011 |
| Feb 9, 2011 | 34879539P | RESOLVE | CLASS - 1 | FAILURE TO PROVIDE UNOBSTRUCTED EXIT PASSAGEWAY.DEFECT NOTED:@ TIME OF INSPECTION FIRE ESCAPE IS OBSTRUCTED BY AWNING... | $6,000 | -$2,680 | Aug 18, 2011 |
| Jan 25, 2011 | 36015733N | RESOLVE | CLASS - 2 | FAILURE TO FILE AN ACCEPTABLE 6TH ROUND TECHNICAL REPORT IN COMPLIANCEWITH CODE PROVISIONS: PERIODIC INSPECTION OF EX... | $8,000 | -$3,694 | Jun 2, 2011 |
| Dec 8, 2010 | 34872157H | RESOLVE | CLASS - 2 | FAILURE TO MAINTAIN BLDG SOUTH ELEVATION:OBSERVE PLANK OF WOOD (LUMBER)AND IRON BED FRAME STORED IN THE PATHWAY OF FI... | $500 | -$177 | Mar 24, 2011 |
| Mar 29, 2010 | 36012686X | RESOLVE | CLASS - 2 | FAILURE TO FILE AN ACCEPTABLE SIXTH ROUND TECHNICAL REPORT IN COMPLIANCE W/ CODE PROVISIONS: PERIODIC INSP. OF EXTERI... | $8,000 | -$4,172 | Sep 30, 2010 |
| Nov 21, 2008 | 36001072H | RESOLVE | CLASS - 2 | FAILURE TO SUBMIT AN ACCEPTABLE SIXTH ROUND TECHNICAL REPORT IN COMPLIANCE W/CODE PROVISIONS:PERIODIC INSPECTION OF E... | $800 | -$421 | Apr 16, 2009 |
| Oct 26, 2006 | 34418267Z | RESOLVE | Hazardous | FAILURE TO MAINTAIN EXTERIOR OF BLDG SOUTH ELEVATION SHOWS STEEL BED FRAMES,PLANKS OF WOOD BLOCKING THE PATHWAY OF FI... | $800 | $0 | Mar 15, 2007 |
| Mar 8, 2006 | 34418182J | RESOLVE | Non-Hazardous | FAILURE TO MAINTAIN EXTERIOR BUILDING SOUTH ELEVATION SHOW PLANKS OF WOOD BLOCKING FIRE ESCAPE, BLOCKS OF WOOD UNDER ... | $400 | $0 | May 4, 2006 |
| Oct 19, 2005 | 34416823L | RESOLVE | Non-Hazardous | FAILURE TO MAINTAIN EXTERIOR OF BUILDING. SOUTH ELEVATION SHOWS BLARKSOF WOOD AND METAL BED FRAMES ON FIRE ESCAPE LAN... | $0 | -$480 | Dec 8, 2005 |
| Jun 29, 2005 | 34416725H | RESOLVE | Hazardous | FAILURE TO MAINTAIN EXTERIOR OF BUILDING. SOUTH ELEVATION SHOWS LOOSE BLANK OF WOOD 2"X 8", SIX TO EIGHT FEET LONG AN... | $0 | $0 | Aug 18, 2005 |
| Jan 27, 2005 | 34418079L | RESOLVE | Hazardous | FAILURE TO MAINTAIN EXTERIOR BUILDING. SOUTH ELEVATION FIRE ESCAPE SHOWS LOOSE METAL. BED FRAMES AND FLOWER POT ON FI... | $400 | $0 | Mar 17, 2005 |
| Jul 9, 2004 | 34459623R | RESOLVE | Non-Hazardous | FAILURE TO SUBMIT A FIFTH ROUND TECHNICAL REPORT:PERIODIC INSPECTION OF EXTERIOR WALLS AND APPURTENANCES AS REQUIRED ... | $1,750 | $0 | Sep 2, 2004 |
| Apr 8, 2004 | 34408411P | RESOLVE | Hazardous | FAILURE TO MAINTAIN EXTERIOR OF BUILDING FACADE ISSUES : - I SOUTH ELEVATION, EXTENSIVE STEP CRACKS, OPEN JOINTS AND ... | $800 | $0 | May 27, 2004 |
| Nov 21, 2003 | 34416663L | RESOLVE | Non-Hazardous | FAILURE TO SUBMIT A FIFTH ROUND TECHNICAL REPORT: PERIODIC INSPECTION OF EXTERIOR WALLS AND APPURTENANCES AS REQUIRED... | $700 | $0 | Feb 26, 2004 |