142-144 Mulberry Street, Manhattan
Manhattan • Block 00237 • Lot 0007 • Zip: 10013
Condition
What the city currently has open against this building, counted from its own records.
Address
Land use and zoning
Building
Latest assessment
Neighborhood
The area this lot falls inside, and the commute Hoodkit measures from it.
Getting around
Estimated 3 days ago- Fulton Street 11 min 3 walking, 8 riding
- Union Square 15 min 3 walking, 12 riding
- Times Square 19 min 3 walking, 16 riding
- Grand Central 21 min 3 walking, 18 riding
- Downtown Brooklyn 23 min 3 walking, 20 riding
- Penn Station 26 min 3 walking, 23 riding
Around this address
Transit and places within 0.5 miles of the lot.
Getting out
Subway
Railroad
Ferry
Bus
Citi Bike
Places nearby
Bistrot Ha
No description yet
Emilio’s Ballato
Emilio's Ballato is a charming Italian restaurant in NYC known for its authentic cuisine and cozy atmosphere. With a ...
Torrisi
Torrisi is a cozy Italian eatery on Mulberry St, serving up traditional dishes with a modern twist. The intimate atmo...
Wildair
Wildair is a trendy wine bar in the Lower East Side offering a rotating selection of natural wines and inventive smal...
Bar Chucho
No description yet
Raf’s
No description yet
Santo Taco
No description yet
Balthazar
No description yet
Activity
Sales, filings, permits and violations from every dataset, in one order.
2025
-
DOB violation Nov 14, 2025
HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED
VIOLATION ISSUED-FAILURE TO FILE 2024 INTERNAL HGH PRESSURE INSPECTION
-
DOB violation Nov 14, 2025
HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED
VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL HGH PRESSURE INSPECTION
2024
-
DOB violation Sep 23, 2024
HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED
VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL HGH PRESSURE INSPECTION
-
DOB violation Sep 23, 2024
HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED
VIOLATION ISSUED-FAILURE TO FILE 2023 INTERNAL HGH PRESSURE INSPECTION
2023
-
DOB violation Jun 30, 2023
HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED
VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL HGH PRESSURE INSPECTION
-
DOB violation Jun 30, 2023
HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED
VIOLATION ISSUED-FAILURE TO FILE 2020 INTERNAL HGH PRESSURE INSPECTION
2018
-
Alteration Type II
INTERIOR DEMOLITION OF CEL, 001, 002 IN AN EXISTING COMMERCIAL BUILDING. NO CHANGE IN EGRESS, USE, OR OCCUPANCY UNDER...
-
Alteration Type I
CONVERT EXISTING USE GROUP 11 WHOLESALE ESTABLISHMENT TO COMMERCIAL USE GROUP 6, INTERIOR RENOVATION THROUGHOUT, PART...
2017
-
Alteration Type I
CONVERT EXISTING USE GROUP 11 WHOLESALE ESTABLISHMENT TO COMMERCIAL USE GROUP 6, INTERIOR RENOVATION THROUGHOUT, PART...
1996
-
Non-Hazardous
WORK WITHOUT A PERMIT WORK NOTED: CONST OF MEZZANINE AT 2ND FLR SOUTH OVER RAMP ERECTING INTERIOR PARTITIONS FOR BATH...
1993
-
Non-Hazardous
WORK WITHOUT A PERMIT. NOTE BUILT MEZZANNIE AT SECOND FL SOUTH OVER RAMP. ERECTING INTERIOR PARTITIONS FOR BATH ROOMS...
The most recent 6 events from each dataset, so no one source takes the axis. Each tab holds the full record.
Property Contacts
Contact information aggregated from multiple government sources
Building Permits
Owner information from Department of Buildings filings
Deed Records
Parties from ACRIS deed and mortgage records
Property Records
Owner information from assessment and PLUTO records