Job filings
91-95 Attorney Street, Manhattan • Block 00348 • Lot 0064
10 records
Work filed with the Department of Buildings under its legacy BIS system.
| Latest action | Job | Type | Status | Work | Cost | Owner |
|---|---|---|---|---|---|---|
| Jul 30, 2020 | 140776328 | Alteration Type II | SIGNED OFF | PROPOSED NEW SPRINKLER AND STANDPIPE SYSTEM ON NEW 6" WATER MAIN IN CONJUNCTION WITH NB #122483455 | $3,000 | 91/93/95 HIGHGATE, LLC |
| Jul 10, 2020 | 140671039 | Alteration Type III | SIGNED OFF | FILING FOR AN 8' CONSTRUCTION FENCE, TOTAL OF 67' LINEAR FT | $0 | 91/93/95 HIGHGATE, LLC |
| Jun 23, 2020 | 123477950 | Alteration Type III | SIGNED OFF | TO ERECT A PERSONNEL/MATERIAL HOIST INCONJUNCTION WITH NB# 122483455. THIS APPLICATION INVOLVES NO CHANGE IN USE, OCC... | $0 | 91/93/95 HIGHGATE LLC |
| Jun 19, 2020 | 123445851 | Alteration Type II | SIGNED OFF | INSTALLATION OF REPEATER AUXILIARY RADIO COMMUNICATION SYSTEM WITH A PASSIVE DISTRIBUTED ANTENNA SYSTEM IN CONJUNCTIO... | $1,000 | 91/93/95 HIGHGATE, LLC |
| Nov 18, 2019 | 122946893 | Alteration Type II | SIGNED OFF | INSTALLATION OF AUTOMATIC SMOKE DETECTION & SPRINKLER FIRE ALARM SYSTEM IN CON JUCTION WITH NB #122483455. ARCS S... | $55,800 | 91/93/95 HIGHGATE, LLC |
| Nov 13, 2019 | 140643855 | Alteration Type III | SIGNED OFF | PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 PER SQUARE FEET. SIDEWALK SHED SHALL CO... | $0 | HKS CONSTRUCTION CORP |
| Nov 7, 2019 | 140671048 | Alteration Type II | SIGNED OFF | FILING FOR SUPPORT OF EXCAVATION AND UNDERPINNING DRAWING IN CONJUNCTION WITH NB #122483455 | $1,000 | 91/93/95 HIGHGATE, LLC |
| Nov 4, 2019 | 122742620 | Alteration Type II | SIGNED OFF | PROPOSED TEMPORARY DRY STANDPIPE SYSTEM WITH AIR PRESSURISED ALARM (IN COMPLIANCE WITH LL 64/2009) DURING CONSTRUCTIO... | $1,000 | 91/93/95 HIGHGATE, LLC |
| Jul 10, 2017 | 122386747 | Demolition | SIGNED OFF | — | $0 | 91/93/95 HIGHGATE LLC |
| May 8, 2017 | 122717435 | Alteration Type II | PLAN EXAM - DISAPPROVED | INSTALL NEW SPRINKLER AND STANDPIPE COMBINED SYSTEM AS PER PLANS FILED HEREWIT H. | $345,000 | 91/93/95 HIGHGATE, LLC |