Avenue D, Manhattan
Manhattan • Block 00362 • Lot 0010 • Zip: 10009
Condition
What the city currently has open against this building, counted from its own records.
Address
Land use and zoning
Building
Latest assessment
Neighborhood
The area this lot falls inside, and the commute Hoodkit measures from it.
Getting around
Estimated 4 days ago- Union Square 13 min 8 walking, 5 riding
- Grand Central 23 min 8 walking, 15 riding
- Times Square 24 min 8 walking, 16 riding
- Penn Station 26 min 8 walking, 18 riding
- Fulton Street 26 min 8 walking, 18 riding
- Downtown Brooklyn 33 min 8 walking, 25 riding
Around this address
Transit and places within 0.5 miles of the lot.
Getting out
Railroad
Ferry
Bus
Citi Bike
Places nearby
Superiority Burger
Superiority Burger is a small, trendy vegetarian restaurant in the East Village offering creative plant-based burgers...
Salumeria Rosi
No description yet
The Wayland
The Wayland is a cozy neighborhood bar in the East Village offering craft cocktails, local beers, and a farm-to-table...
Tuome
No description yet
Bobwhite Counter
Bobwhite Counter is a cozy Southern-style restaurant offering delicious comfort food in a casual setting. Enjoy their...
Sunny & Annie's Gourmet Deli
No description yet
Empellon Al Pastor
Empellon Al Pastor is a trendy Mexican eatery serving up delicious tacos and cocktails in a vibrant and lively atmosp...
Ray's Candy Store
Ray's Candy Store is a beloved NYC institution serving up classic treats like soft serve ice cream, fried Oreos, and ...
Activity
Sales, filings, permits and violations from every dataset, in one order.
2026
2025
-
CLASS - 2
INUSE+SERVICING THIS BUILDING>MOBILE BOILER CB-200-750/TRAILER#TB-206 HAS FUMES+SMOKE@END OF RUN CYCLE+SMOKE ALARM IS...
-
Alteration Type II
BLDG #9-SUBSEQUENT FILING FOR PROPOSED INSTALLATION OF UNDERGROUND ELECTRICAL AND PLUMBING UTILITIES ASSOCIATED WITH ...
2024
-
DOB violation Jun 23, 2024
EARCX-FAILURE TO SUBMIT EER NONE
FAILURE TO SUBMIT AN EER PER AD. CODE SEC. 28-308.4 IN 2023
-
CLASS - 2
FAILURE TO SUBMIT AN ACCEPTABLE REQUIRED CYCLE 9B REPORT OF CRITICAL EXAMINATION DOCUMENTING CONDITION OF EXTERIOR WA...
-
CLASS - 2
FAILURE TO SUBMIT AN ACCEPTABLE REQUIRED CYCLE 9B REPORT OF CRITICAL EXAMINATION DOCUMENTING CONDITION OF EXTERIOR WA...
-
CLASS - 2
FAILURE TO SUBMIT AN ACCEPTABLE REQUIRED CYCLE 9B REPORT OF CRITICAL EXAMINATION DOCUMENTING CONDITION OF EXTERIOR WA...
-
CLASS - 2
FAILURE TO SUBMIT AN ACCEPTABLE REQUIRED CYCLE 9B REPORT OF CRITICAL EXAMINATION DOCUMENTING CONDITION OF EXTERIOR WA...
-
CLASS - 2
FAILURE TO SUBMIT AN ACCEPTABLE REQUIRED CYCLE 9B REPORT OF CRITICAL EXAMINATION DOCUMENTING CONDITION OF EXTERIOR WA...
2023
-
Alteration Type II
BLDG #12- PROPOSED INCORPORATION OF EMERGENCY POWER GENERATORS IN BLDG ENCLOSURES TO PROVIDE FULL BACK UP POWER, INCO...
-
Alteration Type II
BLDG #11- PROPOSED INCORPORATION OF EMERGENCY POWER GENERATORS IN BLDG ENCLOSURES TO PROVIDE FULL BACK UP POWER, INCO...
-
Alteration Type II
RIIS HOUSES - FILING HEREWITH FOR VARIOUS SUPPORT OF EXCAVATION THROUGHOUT THE NYCHA RIIS HOUSES COMPLEX.
-
Alteration Type II
BLDG #13- PROPOSED INCORPORATION OF EMERGENCY POWER GENERATORS IN BLDG ENCLOSURES TO PROVIDE FULL BACK UP POWER, INCO...
-
Alteration Type II
BLDG #10- PROPOSED INCORPORATION OF EMERGENCY POWER GENERATORS IN BLDG ENCLOSURES TO PROVIDE FULL BACK UP POWER, INCO...
-
DOB violation Feb 22, 2023
FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED
FAILED TO FILE FISP CYCLE 9B TECHNICAL REPORT BY 2/21/2023
-
DOB violation Feb 22, 2023
FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED
FAILED TO FILE FISP CYCLE 9B TECHNICAL REPORT BY 2/21/2023
-
DOB violation Feb 22, 2023
FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED
FAILED TO FILE FISP CYCLE 9B TECHNICAL REPORT BY 2/21/2023
-
DOB violation Feb 22, 2023
FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED
FAILED TO FILE FISP CYCLE 9B TECHNICAL REPORT BY 2/21/2023
-
DOB violation Feb 22, 2023
FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED
FAILED TO FILE FISP CYCLE 9B TECHNICAL REPORT BY 2/21/2023
The most recent 6 events from each dataset, so no one source takes the axis. Each tab holds the full record.
Property Contacts
Contact information aggregated from multiple government sources
Building Permits
Owner information from Department of Buildings filings
Recent Building Permits
Owner information from recent DOB NOW filings
Deed Records
Parties from ACRIS deed and mortgage records
Property Records
Owner information from assessment and PLUTO records