632-634 East 11 Street, Manhattan
Manhattan • Block 00393 • Lot 0023 • Zip: 10009
Condition
What the city currently has open against this building, counted from its own records.
Address
Land use and zoning
Building
Latest assessment
Neighborhood
The area this lot falls inside, and the commute Hoodkit measures from it.
Getting around
Estimated 3 days ago- Union Square 13 min 8 walking, 5 riding
- Grand Central 23 min 8 walking, 15 riding
- Times Square 24 min 8 walking, 16 riding
- Penn Station 26 min 8 walking, 18 riding
- Fulton Street 26 min 8 walking, 18 riding
- Downtown Brooklyn 33 min 8 walking, 25 riding
Around this address
Transit and places within 0.5 miles of the lot.
Getting out
Railroad
Ferry
Bus
Citi Bike
Places nearby
Pizza Studio Tamaki
No description yet
Superiority Burger
Superiority Burger is a small, trendy vegetarian restaurant in the East Village offering creative plant-based burgers...
Baohaus
No description yet
Veselka
Lively Ukrainian restaurant known for its borscht and pierogi, featuring a rustic atmosphere and colorful wall murals.
Carnitas Ramirez
Carnitas Ramirez offers authentic Mexican cuisine in the heart of New York City. Specializing in tender, flavorful ca...
Adda
No description yet
Smithereens
Smithereens is a cozy nook in the heart of the East Village, offering a unique blend of vintage knick-knacks, eclecti...
Odo East Village
No description yet
Activity
Sales, filings, permits and violations from every dataset, in one order.
2023
-
DOB violation Jun 20, 2023
LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION
2022
-
Alteration Type II
RENOVATION OF UNITS 1, 2, 3, 1A AND 1C ON THE FIRST FLOOR AND ACCESSORY SPACE IN THE CELLAR AND MECHANICAL WORK AT TH...
-
Alteration Type II
RENOVATE 5 UNITS ON THE 3RD FLOOR AND 5 UNITS ON THE 4TH FLOOR. WORK TO INCLUDE REMOVING AND INSTALLING NEW INTERIOR ...
-
Alteration Type II
RENOVATE UNITS 4, 6, 7, 8 AND 9 ON THE 2ND FLOOR. WORK TO INCLUDE REMOVING AND INSTALLING NEW INTERIOR NON-LOAD BEARI...
-
Alteration Type II
RENOVATE PUBLIC HALLS IN BUILDING, REPLACEMENT OF DOORS, STAIR TREADS, REMOVAL NONLOADBEARING PARTITIONS. THIS APPLIC...
-
Alteration Type II
RENOVATE UNITS 22, 23, 24, 25 AND 26 ON THE 5TH FLOOR AND UNITS 31, 32 AND 33 ON THE 6TH FLOOR. WORK TO INCLUDE REMOV...
2021
2020
-
Alteration Type II
NEW STAIR OPENING AND SUPPORT BEING FILED IN CONJUNCTION WITH ALTERATION 2 APPLICATION NUMBER 123535558. NO CHANGE TO...
2019
-
CLASS - 2
NO STAMPED , APPROVED PLANS ON SITE, I ASKED THE WORKERS THEY TOLD ME DON'T HAVE THEM, PROVIDE APPROVED /ACCEPTED CON...
-
CLASS - 2
NO SCBOFR POSTED OR DISTRIBUTED IN THE BUILDING, POST OR DISTRIBUTE SAFE CONSTRUCTION BILL OF RIGHTS; COMPLY WITH NOT...
-
CLASS - 2
NO TPP POSTED OR DISTRIBUTED IN THE BUILDING,THERE IS A TPP BUT NOT FOR JOB # 123535558, POST OR DISTRIBUTE NOTICE OF...
-
HPD violation Jun 21, 2019
Class A
§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING AND ALL WALLS AT ...
-
HPD violation Jun 21, 2019
Class B
§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT MATERIAL AT CEILING A...
-
HPD violation Jun 21, 2019
Class B
§ 27-2005, 2006, 2037 HMC: PROPERLY REPAIR AND ABATE UNSAFE ELECTRIC WIRING CONDITION CONSISTING OF EXPOSE ELECTRICAL...
-
CLASS - 2
OBSERVED INTERIOR RENOVATION WORK IN PROGRESS INCLUDING PUBLIC HALLWAY UNDER JOB # 123418186. HALLWAY AND STAIRWELL D...
-
HPD violation May 6, 2019
Class B
§ 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF LATCH AND HOOK INSTALLED ON INTERIOR SIDE OF BUILDI...
-
HPD violation May 3, 2019
Class B
§ 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE RETURN BUZZER INTERCOM SYSTEM AT BUILDING ENTRANCE DOOR TO...
-
CLASS - 2
BC3303.10. TENANT PROTECTION PLAN NOT BEING COMPLIED WITH NOTED: CON TRACTOR IS ACTIVELY WORKING ON ALT2 APP #1235212...
-
CLASS - 1
FAILURE TO SAFEGUARD ALL PERSONS AND PROPERTY AFFECTED BY CONSTRUCTION OPERATION.NOTED:PREMISES 6 -STORY ATTACHED NFP...
-
HPD violation Jan 25, 2019
Class A
§ 27-2005 HMC: POST, IN A FORM APPROVED BY THE COMMISSIONER, AND MAINTAIN A NOTICE IN A COMMON AREA OF THE BUILDING R...
2018
2016
-
DOB violation Apr 6, 2016
AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE
FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
-
DOB violation Apr 6, 2016
AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE
FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
-
DOB violation Mar 23, 2016
AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE
FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
-
DOB violation Mar 23, 2016
AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE
FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
2015
-
DOB violation Mar 3, 2015
LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2013 INSPECTION REPORT
The most recent 6 events from each dataset, so no one source takes the axis. Each tab holds the full record.
Property Contacts
Contact information aggregated from multiple government sources
Registration Contracts
Contact information from multiple dwelling registrations
Building Permits
Owner information from Department of Buildings filings
Recent Building Permits
Owner information from recent DOB NOW filings
Deed Records
Parties from ACRIS deed and mortgage records
Property Records
Owner information from assessment and PLUTO records