Skip to content

Job filings

544 East 13 Street, Manhattan • Block 00406 • Lot 0027

11 records

Work filed with the Department of Buildings under its legacy BIS system.

Latest action Job Type Status Work Cost Owner
Feb 8, 2018 122531242 Alteration Type I SIGNED OFF HEREWITH FILED IN ORDER TO RENOVATE EXISTING BASEMENT-PLUS-6-STORY BUILDING AND COMBINE APARTMENTS. GENERAL PARTITION... $991,875 UHAB HDFC
Jan 12, 2018 122689493 Alteration Type II SIGNED OFF INSTALLATION OF AUTOMATIC SMOKE/HEAT/CO DETECTION///SPRINKLER_ALARM SYSTEM $15,000 UHAB HDFC
Nov 16, 2017 140442055 Alteration Type II SIGNED OFF (MH)FILING FOR HYDRONIC HEATING AND ENERGY RECOVERY VENTILATION SYSTEMS. ROOFTOP BOILER ROOM AND ROOFTOP ERV ROOM. (P... $303,500 UHAB HDFC
Oct 18, 2017 140442000 Alteration Type II SIGNED OFF FILING FOR NEW SPRINKLER SYSTEM IN 6 STORY BLDG. $40,000 UHAB HDFC
Sep 25, 2017 121680877 Alteration Type III SIGNED OFF PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED FILED FOR REMEDIAL REPAIRS AS PER PLANS. NO CHANGE IN USE OCCUPANCY... $0 N/A
Sep 19, 2017 140519847 Alteration Type III SIGNED OFF PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING... $0 J & G GNRL CONTRACT INC
Jun 15, 2017 140441966 Alteration Type II SIGNED OFF FILING FOR STUCTURAL WORK IN RENOVATION OF 6 STORY MASONRY BUILDING. NEW STEEL BEAMS AND DECKING AT ELEVATOR, AND WHE... $126,900 UHAB HDFC
May 31, 2017 140422914 Alteration Type III SIGNED OFF PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. $0 TRIBOROUGH SCAFFOLDING & HOISTIN
Jun 15, 2016 140509288 Alteration Type III PLAN EXAM - IN PROCESS PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING... $0 J & G GNRL CONTRACT INC
Feb 16, 2016 122684050 Alteration Type II APPLICATION PROCESSED-PART-NO PAYMENT FILING FOR FIRE ALARM SYSTEM FOR ALT 1 RENOVATION OF 6 STORY BLDG. $15,000 UHAB HDFC
Jan 23, 2015 122164406 Alteration Type II PLAN EXAM - APPROVED REPLACEMENT OF DETERIORATED PUBLIC HALLWAY STAIR BULKHEAD AND ELEVATOR MACHINE ROOM WALLS AND ROOFS. NO CHANGE IN USE... $21,000 UHAB-HDFC