Job filings
117-119 Allen Street, Manhattan • Block 00415 • Lot 0003
7 records
Work filed with the Department of Buildings under its legacy BIS system.
| Latest action | Job | Type | Status | Work | Cost | Owner |
|---|---|---|---|---|---|---|
| Jun 14, 2018 | 103283652 | Alteration Type I | SIGNED OFF | SEE ITEM #16 | $500,000 | NEW YORK CHINESE ALLIANCE CHURCH |
| Oct 11, 2017 | 104308036 | Place of Assembly | COMPLETED | — | $0 | NEW YORK CHINESE ALLIANCE CHURCH |
| Oct 10, 2017 | 104308045 | Place of Assembly | COMPLETED | — | $0 | NEW YORK CHINESE ALLIANCE CHURCH |
| Jan 13, 2016 | 121468072 | Alteration Type III | SIGNED OFF | APPLICATION TO REPAIR THE SOUHTHERLY SIDE OF THE BUILDING FACADE FOR CRACKED BRICKS AND LOOSE JOINTS(EXTERIOR WORK ON... | $4,000 | NY CHINESE ALLIANCE CHURCH |
| Apr 11, 2008 | 104458533 | Alteration Type II | SIGNED OFF | PROPOSE TO INSTALL INDIVIDUALLY CODEDFIRE ALARM SYSTEM WITH CENTRAL OFFICE CONNECTION.THERE IS NO CHANGE IN USE, EGRE... | $95,000 | NY CHINESE ALLIANCE CHURCH |
| Dec 22, 2006 | 103433759 | Alteration Type II | SIGNED OFF | EXPANSION OF EXISTING SPRINKLER SYSTEM FROM SECOND FLOOR TO SIXTH FLOOR FOR A NEW ADDITION CHURCH BUILDING. THE EXTEN... | $40,000 | NEW YORK CHINESE ALLIANCE CHURCH |
| Nov 15, 2006 | 103793762 | Alteration Type III | SIGNED OFF | Install 53 lf of sidewalk shed for exterior work. HEAVY DUTY SHED = 300 PSF LIVE LOAD.No storage on shed. No change i... | $0 | COLGATE SCAFFOLDING |