306-308 East 5 Street, Manhattan
Manhattan • Block 00446 • Lot 0011 • Zip: 10003
Condition
What the city currently has open against this building, counted from its own records.
Address
Land use and zoning
Building
Latest assessment
Neighborhood
The area this lot falls inside, and the commute Hoodkit measures from it.
Getting around
Estimated 3 days ago- Union Square 13 min 8 walking, 5 riding
- Grand Central 23 min 8 walking, 15 riding
- Times Square 24 min 8 walking, 16 riding
- Penn Station 26 min 8 walking, 18 riding
- Fulton Street 26 min 8 walking, 18 riding
- Downtown Brooklyn 33 min 8 walking, 25 riding
Around this address
Transit and places within 0.5 miles of the lot.
Getting out
Subway
Railroad
Ferry
Bus
Citi Bike
Places nearby
Pizza Studio Tamaki
No description yet
Claud
No description yet
Emilio’s Ballato
Emilio's Ballato is a charming Italian restaurant in NYC known for its authentic cuisine and cozy atmosphere. With a ...
Superiority Burger
Superiority Burger is a small, trendy vegetarian restaurant in the East Village offering creative plant-based burgers...
Penny
Penny is a hidden gem in the heart of East Village, offering a cozy and inviting atmosphere. They specialize in eclec...
Torrisi
Torrisi is a cozy Italian eatery on Mulberry St, serving up traditional dishes with a modern twist. The intimate atmo...
Wildair
Wildair is a trendy wine bar in the Lower East Side offering a rotating selection of natural wines and inventive smal...
Baohaus
No description yet
Activity
Sales, filings, permits and violations from every dataset, in one order.
2025
-
HPD violation Jun 4, 2025
Class A
(A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION ...
2023
-
HPD violation Mar 15, 2023
Class A
(A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION ...
2022
-
HPD violation Nov 2, 2022
Class I
§27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27...
-
HPD violation Feb 15, 2022
Class A
(A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION ...
2021
-
DOB violation Oct 8, 2021
FISPHAZ-HAZARDOUS CONDITION (FACADE) FACADE REQUIRED
CYCLE 9A UNSAFE REPORT FILED
-
CLASS - 2
FAILURE TO OBTAIN TEMPORARY CONSTRUCTION PERMIT PRIOR TO INSTALLATION OF TEMPORARY CONSTRUCTION EQUIPMENT AND NO EMER...
2018
-
Alteration Type II
REPLACE BOILER AND OIL BURNER WITH BOILER AND GAS/OIL BURNER. INSTALL (1) NEW GAS FIRED HOT WATER HEATER AND (2) HOT ...
2017
2016
-
Alteration Type III
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
2015
-
HPD violation Oct 1, 2015
Class I
SECTION27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CO...
2014
-
HPD violation Jul 21, 2014
Class B
SECTION 27-2018 ADMIN. CODE: ABATE THE NUISANCE CONSISTING OF BEDBUGS LOCATED AT APT 27, 6th STORY, 1st APARTMENT FRO...
-
Alteration Type II
RENOVATION OF EXISTING APARTMENT # 26 AS PER PLANS; MINOR PARTITION AND PLUMBING WORK, PLASTER AND PAINT TO MATCH EXI...
2013
-
Alteration Type II
REPLACE OIL BURNER ON NYC BOILER NO. MD19313-01. CHANGE OF GRADE OF FUEL OIL FROM #4 TO #2 BEING FILED UNDER SEPARATE...
2012
-
Alteration Type III
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED FILED FOR REMEDIAL REPAIRS AS PER PLANS. LIVE LOAD 300 PER SQUARE F...
-
Alteration Type III
PROPOSED INSTALLATION OF PIPE SCAFFOLD FOR REMEDIAL REPAIR AS PER PLAN. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER ...
-
CLASS - 2
FAILURE TO MAINTAIN BLDG WALLS OR APPURTENANCES. DEFECT NOTED: APPROX 6'X 12' SECTION OF LOOSE STACO PLASTER SEPERATE...
2003
-
Non-Hazardous
FAILURE TO SUBMIT A FIFTH ROUND TEHCNICAL REPORT PERIODIC INSPECTION OR EXTERIOR WALLS AND APPURTENANCES AS REQUIRED ...
2002
-
DOB violation Aug 8, 2002
L1198-LOCAL LAW 11/98 - FACADE FACADE REQUIRED
1999
-
Hazardous
WORK WITHOUT A PERMIT. ILLEGAL WORK NOTED: AT FRONT FACADE OF PREMISESREMOVED METAL CORNICE AND PARAPET. PARAPET WAS ...
-
Hazardous
NO SIDEWALK SHED. AT EAST FACADE WORK IS BEING DONE ON PARAPET AND THERE IS NO SIDEWALK SHED ERECTED ON THE EAST SIDE...
-
Hazardous
FAILURE TO CARRY OUT DEMOLITION OPERATION IN A SAFE AND PROPER MANNER:AT FRONT FACADE, METAL CORNICE AND BRICK PARAPE...
-
DOB violation Nov 5, 1999
C-CONSTRUCTION OTHER OPTIONAL
-
DOB violation Nov 5, 1999
C-CONSTRUCTION OTHER OPTIONAL
-
DOB violation Nov 5, 1999
C-CONSTRUCTION OTHER OPTIONAL
1997
-
DOB violation Sep 16, 1997
LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
The most recent 6 events from each dataset, so no one source takes the axis. Each tab holds the full record.
Property Contacts
Contact information aggregated from multiple government sources
Registration Contracts
Contact information from multiple dwelling registrations
Building Permits
Owner information from Department of Buildings filings
Recent Building Permits
Owner information from recent DOB NOW filings
Deed Records
Parties from ACRIS deed and mortgage records
Property Records
Owner information from assessment and PLUTO records