ECB violations
73 Thompson Street, Manhattan • Block 00489 • Lot 0030
9 records
Environmental Control Board violations, which carry a hearing and a penalty.
| Issued | Violation | Status | Severity | Description | Penalty | Balance due | Hearing |
|---|---|---|---|---|---|---|---|
| Jan 23, 2013 | 35004323K | RESOLVE | CLASS - 1 | FAILURE TO MAINTAIN BLDG EXTERIOR.DEFECTS NOTED:AT EXPOSURE #4 EXHAUSTPIPE APPROX 30"X30"SQUARE PIPE RUNNING FROM BAS... | $0 | $0 | Apr 25, 2013 |
| Nov 27, 2006 | 34545503N | RESOLVE | Non-Hazardous | VIOL WRITTEN BASED UPON NO RECORDS OF CORRECTION FOR VIOL #34400017K ISSUED ON 7/30/04 FOR WORK W/O A PERMIT. JOB #10... | $3,000 | $0 | Feb 15, 2007 |
| Nov 27, 2006 | 34545502L | RESOLVE | Hazardous | FAILURE TO MAINTAIN EXTERIOR WOODEN CORNICE RIGHT ABOVE THE 1ST FL IN FRONT OF THE BLDG. WHICH IS ROTTEN & FALLING AP... | $2,000 | $0 | Jan 11, 2007 |
| Jul 15, 2006 | 34528675P | RESOLVE | Hazardous | NOTED:FAILURE TO MAINTAIN EXTERIOR WOODEN CORNICE ABOVE 1ST FL-HAS DETERIORATED SIGNIFICANTLY CREATING A HAZARDOUS CO... | $800 | $0 | Jan 11, 2007 |
| Jul 15, 2006 | 34528674N | RESOLVE | Non-Hazardous | NOTED:FAILURE TO COMPLY W/ORDER BY THE DEPT FOR VIOLATION #34400017K ISSUED07/30/04FOR WORK W/O PERMIT-STORE FRONT CH... | $1,500 | $0 | Feb 15, 2007 |
| Aug 10, 2004 | 34441290M | RESOLVE | Hazardous | FAILURE TO PROVIDE ADEQAUTE PROTECTION FOR SIDEWALKS AND WALKWAYS DURING CONSTRUCTION OPERATION.NOTED:AT FRONT FACADE... | $2,000 | $0 | Apr 21, 2005 |
| Jul 30, 2004 | 34400017K | RESOLVE | Hazardous | WORK W/O A PERMIT. WORK NOTED AT STORE FRONT CHANGED TO DESIGN WHICH ALLOWS SUSBSTANTIAL PART OF FRONTAGE TO BE OPENE... | $2,500 | $0 | Jun 9, 2005 |
| Aug 13, 2003 | 34409282M | RESOLVE | Non-Hazardous | FAILURE TO COMPLY WITH STOP WORK ORDER ECB 34409124R FOR FAILURE TO PROTECT ROOF OF ADJOINING PROPERTY AT 71 TOMPSON ... | $500 | $0 | Apr 8, 2004 |
| Aug 7, 2003 | 34409124R | RESOLVE | Non-Hazardous | FAILURE TO PROTECT ROOF OF ADJJOINING PROPERTY 71 THOMPSON COURTYARD DURING CONSTRUCTION OPERATION NOTED CONSTRUCTION... | $500 | $0 | Apr 8, 2004 |