ECB violations
2-6 King Street, Manhattan • Block 00519 • Lot 0036
10 records
Environmental Control Board violations, which carry a hearing and a penalty.
| Issued | Violation | Status | Severity | Description | Penalty | Balance due | Hearing |
|---|---|---|---|---|---|---|---|
| Feb 13, 2018 | 35285840M | RESOLVE | CLASS - 2 | APPROVED DRAWING NOT ON SITE,APPROVED DRAWING ARE REQUIRED TO BE ON SITE AVAILABLE AT INSPECTRO/COMMISSIONERS REQUEST... | $0 | $0 | Aug 23, 2018 |
| Jan 25, 2008 | 32052927Z | RESOLVE | Non-Hazardous | 50A,B,44C,50C.50A-INSTALL BACK FLOW PREVENTOR ON HAND FEED LINE.50B-REPAIR LEAK ON PRESSURE CONTROL LINE NEAR STEAM G... | $180 | $0 | Mar 13, 2008 |
| Jun 13, 2006 | 32050118J | RESOLVE | Non-Hazardous | 6A,50A,50C,40,50B.FUCTON V.T. BOILER,10HP,NB49129,OIL,1982.6A-SAFETY VALVE CORRODED & LEAKING.REPLACE SAFETY VALVE.40... | $0 | $0 | Aug 3, 2006 |
| Nov 23, 2005 | 34499876L | RESOLVE | Non-Hazardous | SIDEWALK SHED DOES NOT MEET BUILDING CODE SPECIFICATIONS (H) OTHER. NOTE: AT CORNERS OF 6TH AVE E KING ST. TRAFFIC DE... | $0 | $0 | Mar 2, 2006 |
| Dec 17, 2003 | 38143321X | RESOLVE | Non-Hazardous | 08V01,29P07,30P07,40I10,45B09,51M11,52L11,58B09,64X10,71X10. 08V01- PROPERLY ADJUST LEVELING ON ALL FLOOR IN BO-DIREC... | $180 | $0 | Feb 5, 2004 |
| Aug 29, 2001 | 34300021P | RESOLVE | Non-Hazardous | WORK WITHOUT PERMIT.WORK COMPLETED.NOTED:INSTALLED NEW STORE FRONT OF COMMERCIAL SPACE OF SAID ADDRESS WITHOUT PERMIT... | $250 | $0 | Jan 3, 2002 |
| Nov 16, 1999 | 34227723L | RESOLVE | Hazardous | FAILURE TO MAINTAIN BUILDING. NOTED: AT CELLAR LEVEL 1- NOTED: DOOR PANEL FROM GARAGE REPLACED W/ NON-WIRE MESH GLASS... | $800 | $0 | Jan 6, 2000 |
| Jun 10, 1998 | 38075585H | RESOLVE | Non-Hazardous | 75U,53B,74M, 75-NO 5YEAR TEST DONE 1992 53-PROVIDE PROPER LIGHTING BEHIND CONTROLLER 74-PROVIDE FIRE EXTINGUISHER. | $350 | $0 | Oct 8, 1998 |
| Jan 30, 1992 | 38019995Y | RESOLVE | Non-Hazardous | REMOVE MIRROR FROM CAB INTERIOR OR PROVIDE LETTER STATING MIRROR IS SAFETY GLASS. | $0 | $0 | Apr 9, 1992 |
| Oct 4, 1989 | 32003723X | RESOLVE | Unknown | FEED LIEN STOP VALVE LEAKING TO REPLACE B) 2ND SLOW OPENING VALVE TO FIL IN BLOW DOWN LINE C) GAGE GLASS TO BE FITTED... | $75 | $0 | Nov 16, 1989 |