Skip to content

10-14 Cooper Square, Manhattan

Manhattan • Block 00544 • Lot 0065 • Zip: 10003

Condition

What the city currently has open against this building, counted from its own records.

Address

Primary address: 10-14 Cooper Square, Manhattan
Borough: Manhattan
Zip code: 10003
Block: 00544
Lot: 0065
BBL: 1005440065
Unified address ID: 1005440065

Land use and zoning

Land use: Mixed Residential & Commercial Buildings
Zoning: M1-6/R10 (Mixed Manufacturing & Residential)
Lot type: Corner
Lot area: 13,542 sq ft
Lot dimensions: 71 ft x 90 ft
Built FAR: 9.47
Max residential FAR: 10
Max commercial FAR: 10
Max facility FAR: 10
School district: 2

Building

Building class: Elevator Apartments - Fireproof with Stores (D6)
Year built: 2009
Last altered: 2009
Floors: 16
Total units: 134
Residential units: 133
Building area: 128,300 sq ft
Basement: None/No Basement
Owner: 10-12 COOPER SQUARE INC

Latest assessment

Assessment year: 2018/19
Tax class: Apartments
Market value: $67,686,000
Total assessment: $30,458,700
Land assessment: $1,687,500
Exempt total: $11,145,979
Assessment owner: 10-12 COOPER SQUARE I

Neighborhood

The area this lot falls inside, and the commute Hoodkit measures from it.

Neighborhood NoHo
District Manhattan

Getting around

Estimated 3 days ago
Nearest station
Bleecker St 4 6 6X

About 2 minutes on foot · 108 m

  • Union Square 8 min 2 walking, 6 riding
  • Grand Central 14 min 2 walking, 12 riding
  • Fulton Street 15 min 2 walking, 13 riding
  • Downtown Brooklyn 17 min 2 walking, 15 riding
  • Times Square 20 min 2 walking, 18 riding
  • Penn Station 23 min 2 walking, 21 riding

Around this address

Transit and places within 0.5 miles of the lot.

Activity

Sales, filings, permits and violations from every dataset, in one order.

2026

  1. DOB NOW filing Jul 30, 2026 $0

    Alteration

    Permit Entire

2024

  1. HPD violation Nov 22, 2024

    Class I

    §27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27...

2022

  1. ECB violation Dec 9, 2022 $1,250

    CLASS - 2

    FAILURE TO SUBMIT ACCEPTABLE REQUIRED CYCLE 9A REPORT OF CRITICAL EXAMINATION DOCUMENTING CONDITION OF EXTERIOR WALL ...

  2. HPD violation Nov 2, 2022

    Class I

    §27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27...

  3. DOB violation Feb 22, 2022

    FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED

    FAILED TO FILE FISP CYCLE 9A TECHNICAL REPORT BY 02/21/2022

2021

  1. DOB violation Dec 1, 2021

    EGRADE-FAILURE TO POST ENERGY GRADE/SCORE NONE

    FAILURE TO DISPLAY ENERGY EFFICIENCY SCORE AND ENERGY EFFICIENCY GRADE AS PER ADCODE SEC. 28-309.12.3

  2. DOB violation Nov 2, 2021

    BENCH-FAILURE TO BENCHMARK NONE

    FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4

  3. DOB violation Aug 2, 2021

    BENCH-FAILURE TO BENCHMARK NONE

    FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4

  4. DOB violation Jun 2, 2021

    BENCH-FAILURE TO BENCHMARK NONE

    FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4

  5. DOB violation Apr 29, 2021

    EGRADE-FAILURE TO POST ENERGY GRADE/SCORE NONE

    FAILURE TO DISPLAY ENERGY EFFICIENCY SCORE AND ENERGY EFFICIENCY GRADE AS PER ADCODE SEC. 28-309.12.3

  6. HPD violation Apr 20, 2021

    Class A

    (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION ...

  7. HPD violation Apr 12, 2021

    Class C

    § 27-2024 ADM CODE PROVIDE ADEQUATE SUPPLY OF COLD WATER FOR THE FIXTURES IN KITCHEN AND BATHROOM IN THE ENTIRE APART...

  8. HPD violation Apr 12, 2021

    Class C

    § 27-2024 ADM CODE PROVIDE ADEQUATE SUPPLY OF HOT WATER FOR THE FIXTURES .. IN THE ENTIRE APARTMENT LOCATED AT APT 8,...

2020

  1. HPD violation Apr 6, 2020

    Class C

    § 27-2024 ADM CODE PROVIDE ADEQUATE SUPPLY OF HOT WATER FOR THE FIXTURES AT KITCHEN AND BATHROOM LOCATED AT APT 2B, 2...

2015

  1. DOB filing Oct 14, 2015 $10,000

    Alteration Type I

    REMOVAL AND INSTALLATION OF NEW PARTITIONS TO CREATE A FOURTH APARTMENT AT THE 13TH FLOOR. INSTALLATION OF GAS STOVE ...

  2. Permit issued Feb 3, 2015

    PL / PL

    APEC CORP

  3. Permit issued Jan 13, 2015

    AL

    ALL CITY REMODELING, INC

2014

  1. DOB filing Oct 2, 2014 $300,000

    Alteration Type I

  2. DOB filing Sep 22, 2014 $0

    Place of Assembly

  3. DOB filing Sep 16, 2014 $540,395

    Alteration Type II

  4. DOB filing Sep 12, 2014 $131,450

    Alteration Type II

  5. DOB filing Sep 12, 2014 $1,000

    Alteration Type II

    INSTALLATION OF MANUAL/AUTOMATIC SMOKE/HEAT/CO DETECTION & SPRINKLER FIRE ALARM SYSTEM FOR PHYSICAL CULTURE ESTAB...

  6. Permit issued May 9, 2014

    PL / PL

    COLBREN PLBG & HTG INC

  7. Permit issued Mar 17, 2014

    EW / BL

    COLBREN PLBG & HTG INC

  8. Permit issued Feb 25, 2014

    AL

    QUEDAN CONSTRUCTION SERVI

  9. Permit issued Jan 29, 2014

    EW / SP

    COLBREN PLBG & HTG INC

2013

  1. ECB violation Jul 16, 2013 $0

    CLASS - 2

    ACCESSORY USE:FOUND THE ACTIVE CONSTRUCTION OF A PHYSICAL CULTURE ESTABLISHMENT AT 1ST FLR AND CELALR. PLEASE BE ADVI...

2010

  1. ECB violation Jul 1, 2010 $1,200

    CLASS - 2

    FAILURE TO COMPLY W/ NYC FIRE & BLDG CODE SMOKING REFUSE OBSERVED IN CONSTRUCTION SITE REFUSE OBSERVED ON 1ST FL NEAR...

  2. ECB violation May 26, 2010 $1,600

    CLASS - 1

    SEC. 3301.2. FAILURE TO PROVIDE OVERHEAD PROTECTION. OBSERVED WORKERS ARE WORKING ON 7TH FLR SETBACK WHILE PARAPET CO...

  3. ECB violation Apr 13, 2010 $4,000

    CLASS - 2

    SEC. 3301.7. FAILURE TO PROVIDE DESIGN DRAWING. NOTED: AT TIME OF INSPECTION AT ABOVE ACTIVE SITE, OBSERVED MATERIAL ...

  4. ECB violation Apr 13, 2010 $4,000

    CLASS - 2

    SEC. 3301.2. FAILURE TO SAFEGUARD ALL PERSONS AFFECTED BY CONSTRUCTIONOPERATIONS. NOTED AT TIME OF INSPECTION OF ABOV...

The most recent 6 events from each dataset, so no one source takes the axis. Each tab holds the full record.

Property Contacts

Contact information aggregated from multiple government sources

1

Registration Contracts

Contact information from multiple dwelling registrations

CorporateOwner
2 COOPER HOLDINGS LP
1 Battery Park Plaza 31
New York, NY, 10004
Agent
2 COOPER HOLDINGS LP
2 Cooper Square
New York, NY, 10003
HeadOfficer
Isaac Kassirer
2 Cooper Square
New York, NY, 10003
SiteManager
ANTON ALIAJ
2

Building Permits

Owner information from Department of Buildings filings

Owner
2 COOPER SQUARE LLC
EDWARD RYAN
Owner
2 COOPER SQUARE LLC C/O WAFRA IN
SAMUEL MARCHESE
Owner
2 COOPER SQUARE LLC S//O WAFA
SAMUEL MARCHESE
Owner
2 COOPER SQUARE LLC C/O WAFRA
SAMUEL MARCHESE
Owner
2 COOPER SQUARE C/O ROSE ASSOC
JANETTE LAMBERT
Owner
SPRING SCAFFOLDING LLC
JOEL ARGUELLES
Owner
TO BETTER DAYS, LLC
BARBARA PERKEL
Owner
ATLANTIC DEVELOPMENT GROUP
MARC ALTHEIM
Owner
NYC CONSTRUCTION SVC INC.
KADIR BARKOL
Owner
NYC CONSTRUCTION SVC. INC
KADIR BARKOL

Show all job filings

3

Recent Building Permits

Owner information from recent DOB NOW filings

Owner
PR
SYOSSET, NY, 11791
4

Deed Records

Parties from ACRIS deed and mortgage records

GRANTEE/BUYER
622 THIRD AVENUE
28TH FLOOR
NEW YORK, NY, 10017
GRANTOR/SELLER
622 THIRD AVENUE
28TH FLOOR
NEW YORK, NY, 10017
ASSIGNOR/OLD LENDER
200 WEST STREET
NEW YORK, NY, 10282
ASSIGNOR/OLD LENDER
200 WEST STREET
NEW YORK, NY, 10282
ASSIGNEE/NEW LENDER
200 WEST STREET
NEW YORK, NY, 10282
ASSIGNEE/NEW LENDER
9062 OLD ANNAPOLIS ROAD
COLUMBIA, MD, 21045
PARTY TWO
345 PARK AVENUE, 41ST FLOOR
NEW YORK, NY, 10154
PARTY 1
C/O WAFRA INC.
345 PARK AVENUE, 41ST FLOOR
NEW YORK, NY, 10154
PARTY 2
C/O DAVID WERNER REAL ESTATE INVESTMENTS
780 THIRD AVENUE, 25TH FLOOR
NEW YORK, NY, 10017
PARTY 1
1 BATTERY PARK PLAZA, 31 ST FLOOR
NEW YORK, NY, 10004

Show all recorded documents

5

Property Records

Owner information from assessment and PLUTO records

Assessment Owner
PLUTO Owner