DOB violations
25 East 4 Street, Manhattan • Block 00544 • Lot 0073
22 records
Violations issued by the Department of Buildings.
| Issued | Violation | Type | Category | Description | Disposed |
|---|---|---|---|---|---|
| Dec 12, 2023 | FA0201BS | C-CONSTRUCTION OTHER OPTIONAL | V*-DOB VIOLATION - DISMISSED | EMERGENCY WORK ORDER DUE TO DETERIORATED&LOOSE FIRE ESCAPE RAIL ON.THE 8TH FLR.OF NORTH ELEV.ALSO DETERIORATED METAL ... | Jun 5, 2024 |
| Feb 18, 2022 | 910030 | FISPHAZ-HAZARDOUS CONDITION (FACADE) FACADE REQUIRED | V*-DOB VIOLATION - DISMISSED | CYCLE 9A UNSAFE REPORT FILED | Feb 8, 2024 |
| Feb 18, 2022 | 00272 | FISPFCS-FAILURE TO CORRECT SWARMP CONDITIONS (FACADE) FACADE REQUIRED | V-DOB VIOLATION - ACTIVE | CYCLE 9A FAILURE TO CORRECT SWARMP CONDITIONS | — |
| May 26, 2021 | 9027/701996 | E-ELEVATOR ELEVATORREQUIRED | V-DOB VIOLATION - ACTIVE | — | — |
| May 31, 2018 | 00902 | FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED | V-DOB VIOLATION - ACTIVE | FAILED TO FILE FISP CYCLE 8A TECHNICAL REPORT BY 02/21/2017 | — |
| Apr 26, 2017 | 9027/597907 | E-ELEVATOR ELEVATORREQUIRED | V*-DOB VIOLATION - Resolved | — | Oct 17, 2017 |
| Mar 23, 2016 | 9027/571811 | E-ELEVATOR ELEVATORREQUIRED | V*-DOB VIOLATION - Resolved | — | Apr 7, 2017 |
| Mar 3, 2015 | 00935 | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | V*-DOB VIOLATION - DISMISSED | VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2013 INSPECTION REPORT | May 12, 2015 |
| Mar 3, 2015 | 00936 | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | V*-DOB VIOLATION - DISMISSED | VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2013 INSPECTION REPORT | May 12, 2015 |
| May 15, 2014 | 00566 | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | V*-DOB VIOLATION - DISMISSED | VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2012 INSPECTION REPORT | May 12, 2015 |
| May 15, 2014 | 00565 | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | V*-DOB VIOLATION - DISMISSED | VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2012 INSPECTION REPORT | May 12, 2015 |
| Mar 31, 2014 | 9028/504163 | E-ELEVATOR ELEVATORREQUIRED | V*-DOB VIOLATION - Resolved | — | Jun 5, 2015 |
| Nov 1, 2013 | 9028/478874 | E-ELEVATOR ELEVATORREQUIRED | V*-DOB VIOLATION - Resolved | — | Apr 7, 2014 |
| Nov 30, 2007 | NRF42325 | LL1198-LOCAL LAW 11/98 - FACADE FACADE OPTIONAL | V*-DOB VIOLATION - DISMISSED | — | Feb 13, 2012 |
| Nov 14, 2007 | 9444/226883 | E-ELEVATOR ELEVATORREQUIRED | V*-DOB VIOLATION - Resolved | — | Jul 27, 2010 |
| Nov 29, 2005 | 94441149434 | E-ELEVATOR ELEVATORREQUIRED | V*-DOB VIOLATION - Resolved | — | Feb 3, 2006 |
| Feb 22, 2005 | 94441121235 | E-ELEVATOR ELEVATORREQUIRED | V*-DOB VIOLATION - Resolved | — | Sep 12, 2005 |
| Feb 19, 2002 | 00382 | LL1081-LOCAL LAW 10/81 - ELEVATOR ELEVATOROPTIONAL | V*-DOB VIOLATION - DISMISSED | — | Jul 29, 2005 |
| Mar 18, 1994 | 07638 | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | V*-DOB VIOLATION - DISMISSED | — | Jul 26, 2005 |
| Mar 18, 1993 | 07638 | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | V*-DOB VIOLATION - DISMISSED | — | Jul 26, 2005 |
| Dec 5, 1989 | 32005083Q | B-BOILER BOILER OPTIONAL | V*-DOB VIOLATION - DISMISSED | 31A/32/3 COVER PRESSURETROL-DIRTY BOILER ROOM-3 BREECHING NEEDS TO BE SEALED PROPERLY TO CHIMNEY | Feb 2, 2005 |
| Nov 15, 1988 | 132228\04 | E-ELEVATOR ELEVATORREQUIRED | V*-DOB VIOLATION - Resolved | (33)REMOVE ALL NON ELEVATOR LOCKS FROM HOISTWAY DOORS (35)BASEME- NT LANDING (47)PROVIDE ADEQUATE TIGHTING IN MOTOR R... | Mar 14, 1991 |