Job filings
11-19 East 4 Street, Manhattan • Block 00545 • Lot 0053
59 records
Work filed with the Department of Buildings under its legacy BIS system.
| Latest action | Job | Type | Status | Work | Cost | Owner |
|---|---|---|---|---|---|---|
| Nov 29, 2022 | 120039378 | Alteration Type I | PERMIT ISSUED - ENTIRE JOB/WORK | THIS APPL. IS FILED TO CREATE A BIS RECORD AND PROGRESS THE PRE-BIS APPL #720/ 86 UNDER WHICH THE LAST TCO (#97570) W... | $1,000 | SAND ASSOCIATES |
| Jan 4, 2021 | 123521395 | Alteration Type II | SIGNED OFF | FILED TO REPLACE AN EXISTING FABRIC AWING WITH A NEW GLASS MARQUEE AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGR... | $8,000 | SANDS ASSOCIATES LP |
| Dec 16, 2020 | 123418925 | Alteration Type II | SIGNED OFF | INSTALLATION OF NEW BOILER IN 4TH FLOOR MECHANICAL ROOM FOR HEAT ONLY. (SEE COMMENTS FOR ADDITIONAL INFROMATION.) NO ... | $10,000 | SANDS ASSOCIATES LP |
| May 4, 2020 | 123748285 | Alteration Type II | SIGNED OFF | FILING HEREWITH INTERIOR ALTERATIONS TO EXISTING COMMERCIAL SPACE AS PER PLANS SUBMITTED HEREWITH. NO CHANGE TO USE, ... | $350,000 | SAND ASSOCIATES |
| May 4, 2020 | 123879044 | Alteration Type II | SIGNED OFF | FILING HEREWITH MINOR INTERIOR ALTERATIONS AS PER PLANS SUBMITTED HEREWITH. NO CHANGE TO USE, OCCUPANCY OR EGRESS UND... | $20,000 | SAND ASSOCIATES |
| Mar 24, 2020 | 123778590 | Alteration Type II | SIGNED OFF | HEREBY FILING TO CREATE TWO CONFERENCE ROOMS IN SECOND FLOOR OFFICE SPACE. NO CHANGE TO USE, OCCUPANCY OR EGRESS. | $30,000 | SAND ASSOCIATES LP |
| May 15, 2019 | 122783577 | Alteration Type II | SIGNED OFF | MODIFICATION OF EXISTING FIRE ALARM SYSTEM ON 5TH FLOOR | $9,500 | SANDS ASSOCIATES LP |
| Mar 27, 2019 | 123335462 | Alteration Type II | SIGNED OFF | INSTALL DUCT WORK AND MECHANICAL EQUIPMENT WITH LOUVER AT WINDOW OF STORE. NO CHANGE IN USE EGRESS OR OCCUPANCY. | $25,000 | LA COLOMBE COFFEE ROASTERS |
| Mar 21, 2019 | 123530526 | Alteration Type II | SIGNED OFF | FILED FOR MECHANICAL WORK INCLUDING REPLACEMENT OF TWO ROOFTOP CONDENSER UNITS AND INSTALLATION OF 3 NEW AIR HANDLERS... | $150,000 | SANDS ASSOCIATES LP |
| Feb 28, 2019 | 123495235 | Alteration Type II | SIGNED OFF | RENOVATE EXISTING OFFICES ON 3RD FLOOR. THIS RENOVATION INCLUDES INSTALL NEW LOW PARTITIONS, FINISHES AND FURNISHING.... | $647,500 | SANDS ASSOCIATES LP |
| Oct 11, 2018 | 122065460 | Alteration Type II | SIGNED OFF | FILING TO SHOW MODIFICATION OF EXISTING FIRE ALARM SYSTEM ON FLOORS CELLAR, 1-5, ROOF. NO CHANGE TO USE, EGRESS, OR O... | $12,000 | SANDS ASSOCIATES LP |
| May 21, 2018 | 121995662 | Alteration Type III | PLAN EXAM - APPROVED | FILING OF FIRE PROTECTION PLAN (NO WORK APPLICATION) FILING FOR COMMERCIAL BUILDING IN CONJUNCTION WITH APPROVED AND ... | $1 | SANDS S. ASSOCIATES, LP |
| Apr 9, 2018 | 123290740 | Alteration Type II | SIGNED OFF | I AM THE SUBSEQUENT APPLICANT FILING FOR STRUCTURAL AND FRAMING PLANS RELATED TO THE REMOVAL AND CLOSURE OF THE EXIST... | $10,150 | SANDS ASSOCIATES LP |
| Apr 9, 2018 | 123290731 | Alteration Type II | SIGNED OFF | APPLICATION BEING FILED TO RENOVATE 3RD FLOOR OFFICE SPACE. WORK TO INCLUDE DEMOLITION OF INTERIOR NON-LOAD BEARING P... | $151,500 | SANDS ASSOCIATES LP |
| Mar 5, 2018 | 122095491 | Alteration Type II | SIGNED OFF | SUBSEQUENT FILING TO PLUMBING AND MECHANICAL WORK ON CELLAR, 1 THRU 5, AND ROOF. PLUMBING INCLUDES NEW FIXTURES. MECH... | $20,000 | SANDS ASSOCIATES LP |
| Feb 13, 2018 | 123351906 | Alteration Type II | SIGNED OFF | INTERIOR RENOVATION WORK IN THE EXISTING RETAIL SPACE ON FIRST FLOOR SUCH AS INSTALL WALLS, COUNTERS, AND REPLACE PLU... | $35,000 | SANDS ASSOCIATES, LP |
| Feb 13, 2018 | 122238104 | Alteration Type II | SIGNED OFF | INSTALL REPLACEMENT GAS FIRED BOILER AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. | $10,000 | SAND ASSOCIATES, A NEW YORK GENE |
| Jan 24, 2018 | 121765508 | Alteration Type II | SIGNED OFF | FILING TO SHOW LOBBY RENOVATION ON THE 1ST FLOOR. WORK INCLUDES REMOVAL AND INSTALLATION OF INTERIOR NON LOAD BEARING... | $107,200 | SANDS ASSOCIATES LP |
| Jan 10, 2018 | 123062737 | Alteration Type II | SIGNED OFF | RENOVATION OF EXISTING OFFICES - REMOVAL OF NON BEARING PARTITIONS, INSTALL NEW NON BEARING PARTITIONS, NEW DOORS, FI... | $333,700 | SANDS ASSOCIATES LP |
| Sep 21, 2017 | 122656740 | Alteration Type II | SIGNED OFF | FILING FOR CONSTRUCTION OF TENANT BIKE STORAGE AT FIRST FLOOR. NO CHANGE TO USE, EGRESS OR OCCUPANCY. | $24,000 | SANDS ASSOCIATES LP |
| Aug 23, 2017 | 123049771 | Alteration Type II | SIGNED OFF | APPLICATION BEING FILED TO REPLACE THE EXISTING HVAC SYSTEM FOR THE LAFAYETTE SIDE ENTRY LOBBY AS INDICATED ON PLANS.... | $17,000 | SANDS ASSOCIATES LP |
| Jun 15, 2017 | 122544318 | Alteration Type II | SIGNED OFF | THIS APPLICATION IS FILED TO INTERIOR RENOVATION AT EXISTING OFFICE AT 4TH FLOOR. INSTALL MINOR PARTITION AND INSTALL... | $954,450 | SANDS ASSOCIATES LP |
| Apr 11, 2017 | 122516081 | Alteration Type II | SIGNED OFF | FILING FOR MODIFICATION TO EXISTING SPRINKLER SYSTEM ON THE 5TH FLOOR. WORK INCLUDES REMOVAL, REPLACEMENT, AND NEW SP... | $12,000 | SANDS ASSOCIATES LP |
| Apr 11, 2017 | 122487255 | Alteration Type II | SIGNED OFF | FILING FOR INTERIOR RENOVATION OF AN EXISTING COMMERCIAL SPACE ON THE FIFTH FLR. WORK INCLUDES REMOVAL AND INSTALLATI... | $262,000 | SANDS ASSOCIATES LP |
| Mar 13, 2017 | 140240718 | Alteration Type II | SIGNED OFF | FILING TO REPLACE EXISTING GAS BOILER ON THE 5TH FLOOR.NEW BOILER AND BOILER VENT TO BE LOCATED ON 5TH FLOOR AND ROOF... | $10,000 | SANDS ASSOCIATES LP |
| Mar 10, 2017 | 122152758 | Alteration Type II | SIGNED OFF | PARTIAL DEMOLITION. NO CHANGE IN USE, EGRESS OR OCCUPANCY. | $30,000 | SANDS ASSOCIATES LP |
| Oct 21, 2015 | 140240282 | Alteration Type II | PLAN EXAM - APPROVED | FILING TO SHOW MODIFICATION OF EXISTING SPRINKLER SYSTEM. WORK INCLUDES REMOVAL AND RELOCATION OF SPRINKLER HEADS ON ... | $7,500 | SANDS ASSOCIATES LP |
| Jun 25, 2015 | 121827158 | Alteration Type II | SIGNED OFF | FILING TO SHOW REPAIR OF EXISTING CONCRETE SLAB IN THE CELLAR. WORK TO INCLUDE REMOVAL AND INSTALLATION OF NEW SLAB U... | $10,000 | SANDS ASSOCIATES LP |
| Feb 4, 2015 | 122103767 | Alteration Type II | SIGNED OFF | REPLACEMENT OF AIR CONDOTIONING UNIT. THERE WILL BE NO CHANGE IN USE EGRESS OR OCCUPANCY. | $67,500 | SANDS ASSOCIATES |
| Feb 4, 2015 | 122103785 | Alteration Type II | SIGNED OFF | REPLACEMENT OF AIR CONDOTIONING UNIT. THERE WILL BE NO CHANGE IN USE EGRESS OR OCCUPANCY. | $135,000 | SANDS ASSOCIATES |
| Jan 30, 2015 | 120311812 | Alteration Type II | SIGNED OFF | INSTALLATION OF A MANUAL AND AUTOMATIC SMOKE/HEAT DETECTION/SPRINKLER ALARM SYSTEM WITH CENTRAL OFFICE CONNECTION. TH... | $225,000 | SAND ASSOCIATES LP |
| Oct 10, 2014 | 120981704 | Alteration Type II | SIGNED OFF | WORK IS TO LEGALIZE MISCELLANEOUS CONDITIONS THROUGHOUT. NO CHANGE IN USE, EGRESS, OCCUPANCY, FIRE RATING OR STRUCTUR... | $61,500 | SAND ASSOCIATES, LP |
| Sep 4, 2014 | 121659124 | Alteration Type II | SIGNED OFF | MODIFICATION TO EXISTING SPRINKLER SYSTEM AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OCCUPANCY UNDER THIS ... | $22,800 | SANDS ASSOCIATES LP |
| Jul 2, 2014 | 121918345 | Alteration Type II | SIGNED OFF | INTERIOR DEMO ON THE 5TH FLOOR. NO CHANGE IN OCCUPANCY, USE OR EGRESS | $25,000 | SANDS ASSOCIATES LP |
| Mar 17, 2014 | 120792464 | Alteration Type II | SIGNED OFF | RENOVATE THE EXISTING 6F OFFICE SPACE AND FIT-OUT 4R & 5F OFFICE SPACES WORK WORK TO INCLUDE REMOVAL AND CONSTRUC... | $364,000 | SANDS ASSOCIATES LP |
| Feb 21, 2014 | 140129171 | Alteration Type III | SIGNED OFF | PROPOSED INSTALLATION OF PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. | $0 | SAND ASSOCIATES |
| Feb 21, 2014 | 121391859 | Alteration Type II | SIGNED OFF | REMOVAL AND INSTALLATION OF INTERIOR NON LOAD BEARING PARTITIONS AND RELATED FINISHES AS PER PLANS FILED HEREWITH. NO... | $125,000 | SAND ASSOCIATES |
| Feb 19, 2014 | 140122873 | Alteration Type III | SIGNED OFF | PROPOSED INSTALLATION OF SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. | $0 | SAND ASSOCIATES |
| Dec 11, 2013 | 120767205 | Alteration Type II | SIGNED OFF | DEMOLITION OF PARTITIONS IN STORE. NO CHANGE TO USE OCCUPANCY OR EGRESS | $20,000 | SANDS ASSOC |
| Jul 15, 2013 | 120843187 | Alteration Type II | SIGNED OFF | MODIFICATIONS TO EXISTING HVAC SYSTEM AND PLUMBING FIXTURES AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR... | $71,000 | SAND ASSOCIATES |
| Jul 1, 2013 | 121483572 | Alteration Type II | SIGNED OFF | INTERIOR RENOVATION TO EXISTING 1ST FLOOR COMMERCIAL SPACE, ERECT 8FT (HALF HEIGHT) DRYWALL PARTITIONS, INSTALL AND R... | $92,790 | SAND ASSOCIATES |
| Jun 11, 2013 | 121100227 | Alteration Type II | SIGNED OFF | MODIFICATION TO EXISTING SPRINKLER SYSTEM AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER TH... | $3,700 | SANDS ASSOCIATES, LP |
| Dec 14, 2012 | 120976827 | Alteration Type II | SIGNED OFF | FILING TO RENOVATE EXISTING 4TH FLOOR OFFICE SPACE. WORK TO INCLUDE REMOVAL AND INSTALLATION OF INTERIOR NON LOAD BEA... | $45,246 | SANDS ASSOCIATES LP |
| Nov 29, 2012 | 120720728 | Alteration Type II | SIGNED OFF | RENOVATE CAFE WITH REMOVAL AND INSTALLATION OF NON-LOAD BEARING OF GWB PARTITIONS. MODIFICATIONS TO SPRINKLERS, ADD P... | $55,000 | SAND S. ASSOCIATES LP |
| Feb 16, 2010 | 104923040 | Alteration Type II | SIGNED OFF | Interior partition and plumbing work as indicated on plans at 5th floor. No change in use, occupancy or egress. | $53,000 | Sand Associates |
| Sep 9, 2009 | 102691188 | Alteration Type II | SIGNED OFF | REMOVAL AND INSTALLATION OF HVAC DUCT WORK, INSTALLATION OF PLUMBING FIXTURES, AS PER PLANS HEREWITH. NO CHANGE IN US... | $204,000 | SAND ASSOCIATES |
| Sep 9, 2009 | 102859514 | Alteration Type II | SIGNED OFF | Minor interior construction and plumbing work as per attached plans. NO CHANGE IN USE, EGRESS OR OCCUPANCY. | $5,000 | Sands Asso |
| Sep 1, 2009 | 102736817 | Alteration Type II | SIGNED OFF | Construction of convenience opening between adjoining buildings. Installation o f 1 1/2 HR. F.P.S.C. shutter on eithe... | $12,500 | Sands Associates |
| Sep 1, 2009 | 102736826 | Alteration Type II | SIGNED OFF | Construction of convenience opening between adjoining buildings. Installation o f 1 1/2 HR. F.P.S.C. shutter on eithe... | $12,500 | Sands Associates |
| Jul 14, 2009 | 103677996 | Alteration Type II | SIGNED OFF | Installation of sprinkler heads as shown on plans filed herewith. no change in use, egress or occupancy | $8,000 | SAND ASSOCIATES, PARTNERSHIP |