101-103 East 9 Street, Manhattan
Manhattan • Block 00555 • Lot 0010 • Zip: 10003
Condition
What the city currently has open against this building, counted from its own records.
Address
Land use and zoning
Building
Latest assessment
Neighborhood
The area this lot falls inside, and the commute Hoodkit measures from it.
Getting around
Estimated 3 days ago- Union Square 13 min 8 walking, 5 riding
- Grand Central 23 min 8 walking, 15 riding
- Times Square 24 min 8 walking, 16 riding
- Penn Station 26 min 8 walking, 18 riding
- Fulton Street 26 min 8 walking, 18 riding
- Downtown Brooklyn 33 min 8 walking, 25 riding
Around this address
Transit and places within 0.5 miles of the lot.
Getting out
Subway
Railroad
Ferry
Bus
Citi Bike
Places nearby
Pizza Studio Tamaki
No description yet
Claud
No description yet
Emilio’s Ballato
Emilio's Ballato is a charming Italian restaurant in NYC known for its authentic cuisine and cozy atmosphere. With a ...
Superiority Burger
Superiority Burger is a small, trendy vegetarian restaurant in the East Village offering creative plant-based burgers...
Penny
Penny is a hidden gem in the heart of East Village, offering a cozy and inviting atmosphere. They specialize in eclec...
Baohaus
No description yet
Veselka
Lively Ukrainian restaurant known for its borscht and pierogi, featuring a rustic atmosphere and colorful wall murals.
Raf’s
No description yet
Activity
Sales, filings, permits and violations from every dataset, in one order.
2026
-
Alteration Type III
2025
2023
-
DOB violation Jun 30, 2023
HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED
VIOLATION ISSUED-FAILURE TO FILE 2020 INTERNAL HGH PRESSURE INSPECTION
-
DOB violation Jun 30, 2023
HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED
VIOLATION ISSUED-FAILURE TO FILE 2020 INTERNAL HGH PRESSURE INSPECTION
-
DOB violation Jun 30, 2023
HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED
VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL HGH PRESSURE INSPECTION
-
DOB violation Jun 30, 2023
HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED
VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL HGH PRESSURE INSPECTION
-
DOB violation Jun 30, 2023
HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED
VIOLATION ISSUED-FAILURE TO FILE 2021 INTERNAL HGH PRESSURE INSPECTION
-
DOB violation Jun 30, 2023
HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED
VIOLATION ISSUED-FAILURE TO FILE 2021 INTERNAL HGH PRESSURE INSPECTION
2015
2007
-
Alteration Type II
Replace 2 existing dry cleaning machines with 1 new dry cleaning machine in existing dry clean establishment(UG-6), a...
-
Alteration Type II
2004
-
Alteration Type II
THIS APPLICATION IS FILED TO REPLACE 2 EXIST'G DRY CLEANING MACHINES. EACH NEW DRY CLEANING MACHINES WILL HAVE 2 SPRI...
2003
-
Alteration Type I
Structural work, new steel beems & columns, metal decking, & concrete work to be done as per plans filed here...
-
Alteration Type II
REMOVAL OF TELECOMMUNICATIONS CABINETS ON ROOF, ANTENNAS ON FACADE AND ALL RELATED EQUIPMENT. PATCH ROOF AS NECESSARY...
1989
-
Non-Hazardous
NEW BUILDING OCCUPIED WITHOUT A VALID C OF O REMEDY OBTAIN A VALID C OF O
-
Non-Hazardous
NEW BUILDING OCCUPIED WITHOUT A VALID C OF O AS REQUIRED BY OPEN APPLICATION NB # 4084 REMEDY DISCONTINUE ILLEGAL OCC...
-
Non-Hazardous
NEW BUILDING OCCUPIED WITHOU A VALID CERTIFICATE OF OCCUPANCY AS REQUIRED BY OPEN AS REQUIRED BY OPEN APPLICATION NB#...
-
Hazardous
FAILURE TO FILE 10E CONTROLLED INSPECTION REPORTS AFTER COMPLETION OF CONTROLLED WORK BORING SOIL SUBGRADE FOUNDATION...
The most recent 6 events from each dataset, so no one source takes the axis. Each tab holds the full record.
Property Contacts
Contact information aggregated from multiple government sources
Building Permits
Owner information from Department of Buildings filings
Recent Building Permits
Owner information from recent DOB NOW filings
Deed Records
Parties from ACRIS deed and mortgage records
Property Records
Owner information from assessment and PLUTO records