Job filings

1-9 West 11 Street, Manhattan • Block 00575 • Lot 0048

25 records

Work filed with the Department of Buildings under its legacy BIS system.

Latest action Job Type Status Work Cost Owner
Feb 26, 2024 110475557 Alteration Type I SIGNED OFF . $0 FIRST PRESBYTERIAN CHURCH
Feb 17, 2022 140912984 Alteration Type II SIGNED OFF INTERIOR MODIFICATIONS ON CEL-6TH FLOORS TO INCLUDE REPAIR, PATCHING AND PAINTING OF WALLS AND CEILINGS. INSTALLATION... $365,000 THE FIRST PRESBYTERIAN CHURCH
Dec 6, 2021 140930866 Alteration Type II SIGNED OFF REMOVAL AND REPLACEMENT OF ROOF PLAY STRUCTURE. PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY. $125,600 THE FIRST PRESBYTERIAN CHURCH
Oct 30, 2020 140913411 Alteration Type II SIGNED OFF INTERIOR RENOVATION AS SHOWN HEREWITH. NO CHANGES TO EGRESS, OCCUPANCY OR USE. $225,000 FIRST PRESBYTERIAN CHURCH
Jul 27, 2020 140930820 Alteration Type II PLAN EXAM - IN PROCESS REMOVAL AND REPLACEMENT OF ROOF PLAY STRUCTURE. PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY. $12,600 THE FIRST PRESBYTERIAN CHURCH
Jul 27, 2020 140930839 Alteration Type II PLAN EXAM - IN PROCESS REMOVAL AND REPLACEMENT OF ROOF PLAY STRUCTURE. PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY. $12,600 THE FIRST PRESBYTERIAN CHURCH
Jan 15, 2020 123726030 Alteration Type II SIGNED OFF INTERIOR DEMOLITION AS SHOWN HEREWITH. NO CHANGES TO EGRESS, OCCUPANCY OR USE. $15,000 FIRST PRESBYTERIAN CHURCH
Nov 26, 2019 123442907 Alteration Type II SIGNED OFF FACADE RESTORATION AND ROOF REPLACEMENT ON PRESBYTERIAN CHURCH AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS ... $1,600,000 N/A
Mar 25, 2019 123209205 Alteration Type II SIGNED OFF WINDOW REPLACEMENT AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY. $50,000 FIRST PRESBYTERIAN CHURCH
Dec 11, 2018 122807686 Alteration Type II SIGNED OFF INTERIOR PARTITION WORK, NEW DOORS, NEW CABINETRY, PAINTING, BATHROOMS AND PANTRY UPGRADE AS PER PLANS. . REMOVE AND ... $40,500 FIRST PRESBYTERIAN CHURCH
May 24, 2018 122785147 Alteration Type III SIGNED OFF INSTALLATION OF 75 LF HEAVY-DUTY SIDEWALK SHED AS PER PLANS. SHED TO COMPLY WITH 2014 NYC BUILDING CODE. NO CHANGE IN... $0 FIRST PRESBYTERIAN CHURCH
Jun 9, 2016 122785156 Alteration Type III APPLICATION PROCESSED - ENTIRE INSTALLATION OF STEEL PIPE SCAFFOLD AS PER PLANS. SCAFFOLD TO COMPLY WITH 2014 NYC BUILDING CODE. NO CHANGE IN EGRESS... $0 FIRST PRESBYTERIAN CHURCH
Dec 10, 2015 121171285 Alteration Type I PLAN EXAM - APPROVED APPLICATION FILED TO CORRECT CO FOR 9 WEST 11 STREET ISSUED ON APPLICATION 101552758. NORTH WING FILED UNDER 11047555... $1,000 FIRST PRESBYTERIAN CHURCH
Jun 18, 2015 120990534 Alteration Type II SIGNED OFF PARTIAL DEMOLITION OF PARTITIONS AND FINISHES ON CEL AND 1ST FLOOR. REMOVE EXISTING AC UNITS AND DUCTWORK. FILED IN C... $100,000 FIRST PRESBYTERIAN CHURCH
Sep 12, 2014 120779960 Alteration Type II SIGNED OFF INSTALLATION OF FIRE ALARM SYSTEM FEATURING MANUAL ALARM, SELECTIVE SMOKE DETECTION, SPRINKLER ALARM AND CENTRAL OFFI... $35,000 FIRST PRESBYTERIAN CHURCH
Jul 21, 2014 120779728 Alteration Type II SIGNED OFF INSTALLATION OF SPRINKLER SYSTEM. FILED IN CONJUNCTION WITH ALT I 110475557. NO CHANGE TO USE, EGRESS, OR OCCUPANCY U... $190,660 FIRST PRESBYTERIAN CHURCH
Nov 21, 2013 120822985 Alteration Type II SIGNED OFF REPLACE (2) BOILERS AND (2) GAS BURNERS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. $405,000 THE FIRST PRESBYTERIAN CHURCH NY
Nov 7, 2012 120384583 Alteration Type III SIGNED OFF INSTALLATION OF HEAVY DUTY SIDEWALK SHED A TOTAL OF 105 L.F. AS PER PLAN AT 12 WEST 12 STREET. DURING REMEDIAL REPAIR... $0 THE FIRST PRESBYTERIAN CHURCH
Mar 20, 2012 121013009 Alteration Type II PLAN EXAM - APPROVED DEMOLITION OF PLUMBING FIXTURES ON CEL, 1ST AND 2ND FLOORS AS PER PLANS.FILED IN CONJUNCTION WITH ALT I 110475557 AND... $29,000 FIRST PRESBYTERIAN CHURCH
Feb 23, 2012 120987726 Alteration Type II PLAN EXAM - DISAPPROVED PARTIAL DEMOLITION OF PARTITIONS AND FINISHES ON CEL AND 1ST FLOOR. REMOVE EXISTING AC UNITS AND DUCTWORK. FILED IN C... $100,000 FIRST PRESBYTERIAN CHURCH
Dec 1, 2011 120847940 Place of Assembly PLAN EXAM - DISAPPROVED $0 FIRST PRESBYTERIAN CHURCH
Apr 27, 2009 110181909 Alteration Type III SIGNED OFF INSTALLATION OF 74 LINEAR FEET OF HEAVY DUTY SIDEWALK SHED FOR REMEDIAL REPAIRS. SIDEWALK SHED SHALL COMPLY WITH LL33... $0 45-47 CROSBY ST TENANTS CORP.
Apr 10, 2009 110198438 Alteration Type III SIGNED OFF INSTALLATION OF 76 LINEAR FEET X 26 FEET HIGH PIPE SCAFFOLD TO BE INSTALLED ON TOP OF BRIDGE. NO CHANGE IN USE, OCCUP... $0 COLGATES SCAFFOLDING & EQUIPMENT
Nov 14, 2003 102822206 Place of Assembly COMPLETED $0 1 ST PRES
Sep 5, 2002 102502971 Alteration Type II SIGNED OFF RENOVEATION OF PANTRY INSTALL SINK AND S TAIRS TO EZISTING RAISED AREA O PARTITAL 4TH FLOOR AS PER PLANS FILED H EREW... $19,000 THE TRUSTEES OF THE FIRST