Skip to content

ECB violations

176 Waverly Place, Manhattan • Block 00610 • Lot 0025

26 records

Environmental Control Board violations, which carry a hearing and a penalty.

Issued Violation Status Severity Description Penalty Balance due Hearing
Jan 9, 2026 39173219N RESOLVE CLASS - 1 OBSERVED MAKE SHIFT SHORING THROUGH ENTIRE FLOORS WITH NO SUPPORT EXISTING STRUCTURE WITH NO APPROVED PLANS, PE SHOP ... $6,250 $6,250 Oct 22, 2026
Jan 9, 2026 39173218L RESOLVE CLASS - 1 OBSERVED PREMISE LOCATION ACTIVE WORK CONTINUED WHILE ON PSWO INSTALLED ADDITIONAL MAKE SHIFT SHORING THROUGH 1ST& 4T... $10,000 $10,000 Oct 22, 2026
Jan 9, 2026 39173220K RESOLVE CLASS - 1 OBSERVED ON A ACTIVE CONSTRUCTION SITE REBAR EXPOSED/UNSECURED WITH NO CAPPING, ALSO 4TH FL. NO FRAME AND/OR SECURE O... $2,500 $2,500 Oct 22, 2026
Nov 10, 2025 35717859Z RESOLVE CLASS - 2 FAILURE TO MAINTAIN/DISPLAY ONSITE DOCUMENTS REQUIRED BY BC CHAPTER 33. AS NOTED AT TIME OF INSPECTION ON AN ACTIVE C... $3,125 $3,125 Oct 30, 2026
Oct 22, 2025 39164400N RESOLVE CLASS - 2 FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER TO FILE A CERTIFICATE OF CORRECTION WITH THE DEPARTMENT OF BUILDINGS.... $1,250 $1,250 Jan 5, 2027
Jul 23, 2025 39154626R RESOLVE CLASS - 1 OBSERVED MAKE SHIFT SHORING THROUGH ENTIRE FLOORS WITH NO SUPPORT EXISTING STRUCTURE WITH NO APPROVED PLANS, PE SHOP ... $6,250 $6,250 Jan 5, 2027
Jul 23, 2025 39154627Z RESOLVE CLASS - 1 NOTED VIOLATION # 39135512P ISSUED 01/14/2025 FOR CONDITIONS STATING MAKE SHIFT SHORING COMPLIANCE FOR ON 03/03/2025,... $10,000 $10,000 Jan 5, 2027
Jun 2, 2025 39540951X RESOLVE CLASS - 1 OBSERVED SOE AREA WITH MAKESHIFT PLATFORM & CATWALK @ EXPOSURE 3 , NO GUARDRAILS SYSTEM/ CAZ NOR A FALL PROTECTION SY... $5,000 $5,000 Oct 8, 2026
Jun 2, 2025 39540969Y RESOLVE CLASS - 2 JOBSITE WITH PERMIT M08036503 EXPIRED ON 04-06-2025, COMBINE 2 BLDGS 176 & 178 WAVERLY PLACE W/ SUBSEQUENT PERMITS IN... $5,000 $5,000 Oct 8, 2026
Jun 2, 2025 39540962L RESOLVE CLASS - 2 OBSERVED EXCAVATION/ FOUNDATION/ UNDERPINNING AT EXPOSURE 3 AND EXCAVATION TO ADJACENT PROPERTY FOUNDATION OF EXPOSUR... $0 $0 Aug 7, 2025
Jun 2, 2025 39540950Y RESOLVE CLASS - 2 3301.6 MANUFACTURER SPECIFICATIONS, DESIGN, AND CAPACITY- OBSERVED MAKE-SHIFT PLATFORM INSTALLED @ EXPO 3 REAR YARD, ... $2,500 $2,500 Oct 8, 2026
Jun 2, 2025 39540949R RESOLVE CLASS - 2 3320.5 -OBSERVED CONVEYOR BELT INSTALLED AT SUBCELLAR LVL RESTING ON CINDERBLOCKS THRU A MAKE-SHIFT PLATFORM BETWEEN ... $2,500 $2,500 Oct 8, 2026
Jun 2, 2025 39540948P RESOLVE CLASS - 2 OBSERVED SUPPORTED PIPE SCAFFOLD INSTALLED @ EXPO 3 REAR YARD OF JOBSITE. THE SCAFFOLDING IS SEATED ON DISTURBED SOIL... $1,250 $1,250 Oct 8, 2026
Jun 2, 2025 39540917M RESOLVE CLASS - 2 OBSERVED STRUCTURAL WORK ON COMBINING TWO BUILDINGS TO ONE TO A SINGLE-FAMILY RESIDENCE WITH EXPIRED PERMIT M08036503... $0 -$1,250 Aug 7, 2025
Jan 14, 2025 39135512P RESOLVE CLASS - 1 OBSERVED MAKE-SHIFT SHORING THROUGHOUT ENTIRE FLOORS TO SECURE EXISTING STRUCTURAL UNDER PARTIAL DEMOLITION WITHOUT A... $2,500 $2,500 Jun 15, 2026
Jan 14, 2025 39135516M RESOLVE CLASS - 1 IT WAS NOTED THAT NO PLANS FOR THE SUPPORTIVE SCAFFOLD WERE AVAILABLE, DESPITE REQUESTS FOR DOCUMENTATION. THIS LACK ... $0 $0 Nov 25, 2025
Jan 14, 2025 39135525Y RESOLVE CLASS - 1 OBSERVED LARGE OPENINGS BETWEEN PARTITIONS W/OUT SHORING, COLD FORM STEEL & STRUCTURAL STEEL THROUGHOUT THE ENTIRE PL... $2,500 $2,500 Jun 15, 2026
Jan 14, 2025 39135530Z RESOLVE CLASS - 1 OBSERVED PARTIAL DEMOLITION W/ MAKE-SHIFT SHORING, LARGE OPENINGS & CONTRARY TO APPROVED PLANS, NO SPECIAL INSPECTION... $0 $0 Jun 15, 2026
Aug 23, 2023 39520897X RESOLVE CLASS - 2 AT TIME OF INSPECTION I OBSERVED UNDERPINNING AND EXCAVATION GOING ON IN THE CELLER WITH USE OF MINI EXCAVATOR TO MOV... $0 $0 Nov 2, 2023
Aug 23, 2023 39520896Y RESOLVE CLASS - 1 AT TIME OF INSPECTION I OBSERVED CLOSED SIDEWALK WITH CONSTRUCTION FENCE BUILT TO COVERED AND BARRICADE THE ENTIRE SI... $625 $0 Apr 4, 2024
Aug 23, 2023 39520895M RESOLVE CLASS - 1 4 STORY BUILDING APPROX 46 FEET IN HEIGHT AT COMPLETION AT 4TH FLOOR LEVEL AND 10 FEET SETBACK FROM WALKWAY, PATHWAY ... $2,400 $0 Apr 4, 2024
May 17, 2023 39516731Y RESOLVE CLASS - 1 DEMO OUT OF SEQUENCE TO APPROVED DRAWINGS, GC FAILED TO PROVIDE MONITORING, SOE DRAWINGS WERE CONTRARY TO APPROVED DR... $2,500 $0 Jan 25, 2024
May 17, 2023 39516725H RESOLVE CLASS - 1 OBSERVED CONDITIONS WERE CONTRARY TO APPROVED SITE SAFETY PLAN. STAGING AREA DID NOT MATCH APPROVED DRAWINGS, NO FLAG... $625 $0 Aug 24, 2023
May 17, 2023 39516729P RESOLVE CLASS - 1 UPON REQUEST, GC UNABLE TO PROVIDE: ORIENTATIONS, PRE-SHIFT SAFETY MEETINGS, TOOL-BOX TALKS, NO THIRD-PARTY SPECIAL I... $625 $0 Aug 24, 2023
May 17, 2023 39516730M RESOLVE CLASS - 1 GC FAILED TO CONFORM WITH NEW YORK CITY FIRE CODE. FIRE EXTINGUISHERS WERE FOUND TO BE OBSTRUCTED, PINS WERE PULLED, ... $2,500 $0 Aug 24, 2023
May 17, 2023 39516727L RESOLVE CLASS - 1 OBSERVED BRACING CONTRARY TO APPROVED DM DRAWINGS.STOP ALL WORK UNDER PERMIT #M08036503-I1 AND CALL CSE FOR REINSPECT... $2,500 $0 Aug 24, 2023