Job filings
173-175 Waverly Place, Manhattan • Block 00610 • Lot 0075
24 records
Work filed with the Department of Buildings under its legacy BIS system.
| Latest action | Job | Type | Status | Work | Cost | Owner |
|---|---|---|---|---|---|---|
| Oct 3, 2019 | 103452256 | Alteration Type I | SIGNED OFF | FILING HEREWITH TO CHANGE THE USE ON THE CELLAR - 4TH FLOOR. ALT II RELATED JOPB #FILED UNDER APPLICATION N UMBER 103... | $1,000 | THE V. J. F.CNTR FOR CHILD PROTE |
| Oct 3, 2019 | 122515215 | Alteration Type I | SIGNED OFF | APPLICATION IS FILED FOR STRUCTURAL WORK ASSOCIATED WITH INTERIOR RENOVATION AS SHOWN ON PLANS FILED HEREWITH. | $0 | H.S.JESSUP ARCHITECTURE |
| Oct 9, 2018 | 122697260 | Alteration Type II | SIGNED OFF | MECHANICAL WORK ASSOCIATED WITH THE BUILDING RENOVATION. NO CHANGE TO USE, EGRESS OR OCCUPANCY. | $1,460,000 | H. S. JESSUP ARCHITECTURE |
| Sep 18, 2018 | 122877422 | Alteration Type III | SIGNED OFF | ERECT A TOTAL OF 160 LINEAR FEET BY 8-16 FEET APPROXIMATE HIGH HEAVY DUTY SIDEWALK SHED, PER DRAWINGS, RATED FOR 300 ... | $0 | NEW FORCE CONSTRUCTION CORP. |
| Sep 18, 2018 | 122877431 | Alteration Type III | SIGNED OFF | ERECT A TOTAL OF 140 LINEAR FEET BY 48 FEET APPROXIMATE HEIGHT OF TUBULAR SCAFFOLD STRUCTURE, PER DRAWINGS. INSTALLAT... | $0 | NEW FORCE CONSTRUCTION CORP. |
| Sep 13, 2018 | 122812484 | Alteration Type II | SIGNED OFF | INSTALLATION OF PERMANENT SPRINKLER SYSTEM AS SHOWN ON PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY. | $183,000 | H. S. JESSUP ARCHITECTURE |
| Jun 27, 2018 | 122976869 | Alteration Type III | SIGNED OFF | INSTALLATION OF TEMPORARY FIRE-RETARDANT TARP PROTECTION ALONG EXISTING SUPPORTED SCAFFOLD, AS SHOWN ON DRAWINGS. NO ... | $0 | NEW FORCE CONSTRUCTION CORP. |
| Jun 27, 2018 | 123338245 | Alteration Type III | SIGNED OFF | ERECT A TOTAL 140 LINEAR FEET LONG BY AT LEAST 8 FEET HEIGHT TEMPORARY PLYWOOD CONSTRUCTION FENCE. INSTALLATION COMPL... | $0 | NEW FORCE CONSTRUCTION CORP. |
| Jun 20, 2018 | 122713377 | Alteration Type II | SIGNED OFF | INSTALL TEMPORARY FIRE SPRINKLER LOOPS AND REMOVE EXISTING. PERMANENT FIRE SPRINKLER SYSTEM WILL BE FILED UNDER SEPER... | $32,500 | H. S. JESSUP ARCHITECTURE |
| May 1, 2018 | 122801931 | Alteration Type II | SIGNED OFF | SUPPORT OF EXCAVATION ASSOCIATED WITH RENOVATION OF THE BUILDING. NO CHANGE TO USE, EGRESS OR OCCUPANCY. | $800,000 | H. S. JESSUP ARCHITECTURE |
| Jul 21, 2017 | 122636558 | Alteration Type II | SIGNED OFF | INTERIOR REMOVAL OF EXISTING PLUMBING FIXTURES, MECHANICAL EQUIPMENT AS SHOWN ON PLANS HEREWITH. NO CHANGE TO USE, EG... | $70,000 | H. S. JESSUP ARCHITECTURE |
| Jul 21, 2017 | 122726096 | Alteration Type II | SIGNED OFF | APPLICATION IS FILED FOR STRUCTURAL WORK ASSOCIATED WITH PARTIAL DEMOLITION AS SHOWN ON PLANS FILED HEREWITH. NO CHAN... | $350,000 | H. S. JESSUP ARCHITECTURE |
| Jul 21, 2017 | 122509650 | Alteration Type II | SIGNED OFF | APPLICATION IS FILED FOR TEST PIT IN THE CELLAR AS SHOWN ON PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY. | $3,150 | H. S. JESSUP ARCHITECTURE |
| Jun 26, 2017 | 140526866 | Alteration Type III | SIGNED OFF | PIPE SCAFFOLD PROPOSED INSTALLATION OF PIPE SCAFFOLD AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY. | $0 | SPRING SCAFFOLDING LLC |
| May 24, 2017 | 122523849 | Alteration Type II | SIGNED OFF | INTERIOR REMOVAL OF EXISTING PLUMBING FIXTURES, MECHANICAL EQUIPMENT, PARTITIONS, STAIR AS SHOWN ON PLANS HEREWITH. N... | $200,000 | H. S. JESSUP ARCHITECTURE |
| Dec 20, 2010 | 103426776 | Alteration Type II | SIGNED OFF | MODIFICATION TO STRUCTURAL FRAME AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY. | $50,000 | THE VINCENT J. FONTANA CENTER FO |
| Oct 22, 2010 | 110146770 | Alteration Type III | SIGNED OFF | INSTALLATION OF 143 LINEAR FEET OF HEAVY DUTY SIDEWALK SHED FOR REMEDIAL REPAIRS. SIDEWALK SHED SHALL COMPLY WITH LL3... | $0 | SKYLINE SCAFFOLDING LLC |
| Sep 16, 2010 | 103353666 | Alteration Type III | SIGNED OFF | Erect 130 ' of Temporary Heavy Duty Sidewalk Shed 300 psf during repairs on brick on facade of building. Shed shall c... | $0 | St. Vincents Fontana Center |
| Jun 18, 2008 | 103352505 | Alteration Type II | SIGNED OFF | MODIFICATION TO FIRE ALARM SYSTEM AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY. NEEW INSTALLATI... | $20,000 | THE V. J. F. CNTR.FOR CHILD PROT |
| Jun 5, 2008 | 110119121 | Alteration Type II | SIGNED OFF | FILING HEREWITH FOR WINDOW REPLACEMENT AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. | $600,000 | THE VINCENT J FONTANA CENTER |
| Oct 13, 2006 | 104443700 | Alteration Type II | PLAN EXAM - APPROVED | Filing herewith for window replacement as per plans. No change in use, egress or occupancy. | $600,000 | New York Founding Hospital |
| Aug 4, 2004 | 103350794 | Alteration Type II | SIGNED OFF | REMOVAL OF EXISTING NON LOAD BEARING PAR TITION AS PER PLANS FILED HEREW TH. NO CHANGE IN USE, EGRESS OR OCCUPANC Y. | $25,000 | THE VINCENT J. FONTANA CENTER |
| Feb 27, 2004 | 103369221 | Alteration Type II | SIGNED OFF | MODIFICATION TO SPRINKLER SYSTEM AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY. | $62,000 | THE V. J. F. CNTR.FOR CHILD PROT |
| Feb 4, 2004 | 103594576 | Alteration Type II | SIGNED OFF | Filing herewith the installation of a Weil McLaine boiler. All associated plumbing work filed under job application 1... | $10,000 | THE V. J. F.CNTR FOR CHILD PROTE |