194 West 10 Street, Manhattan
Manhattan • Block 00619 • Lot 0065 • Zip: 10014
Condition
What the city currently has open against this building, counted from its own records.
Address
Land use and zoning
Building
Latest assessment
Neighborhood
The area this lot falls inside, and the commute Hoodkit measures from it.
Getting around
Estimated 3 days ago- Penn Station 13 min 4 walking, 9 riding
- Times Square 15 min 4 walking, 11 riding
- Union Square 16 min 4 walking, 12 riding
- Fulton Street 20 min 4 walking, 16 riding
- Grand Central 21 min 4 walking, 17 riding
- Downtown Brooklyn 27 min 4 walking, 23 riding
Around this address
Transit and places within 0.5 miles of the lot.
Getting out
Subway
Railroad
Ferry
Bus
Citi Bike
Places nearby
Dean's
No description yet
Capitaine
No description yet
Somssi
No description yet
Cove
No description yet
Salt Hank’s
No description yet
King
No description yet
Hamburger America
No description yet
Via Carota
Via Carota is a cozy, rustic Italian restaurant in the heart of Greenwich Village. With its charming ambiance and del...
Activity
Sales, filings, permits and violations from every dataset, in one order.
2026
-
HPD violation Apr 29, 2026
Class A
(A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION ...
2025
-
Alteration Type II
FACADE REPAIRS AS PER PLANS SUBMITTED HEREWITH. SIDEWALK PROTECTION FILED SEPARATELY. NO CHANGE IN USE, EGRESS OR OCC...
-
Alteration Type III
INSTALLATION OF A HEAVY DUTY SIDEWALK SHED 25' DURING FACADE REPAIR. NO CHANGE IN US, EGRESS OR OCCUPANCY. SHED TO CO...
2024
2023
-
HPD violation Oct 12, 2023
Class B
§ 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT NORTH WALL IN THE 1st ROOM ...
-
HPD violation Oct 12, 2023
Class B
§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING AND NOR...
-
HPD violation Oct 12, 2023
Class B
§ 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK OVER THE CEILING IN THE 1st ROOM FROM NORTH LOCATED AT AP...
2022
-
HPD violation Feb 16, 2022
Class A
(A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION ...
2021
-
HPD violation Apr 1, 2021
Class A
(A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION ...
2020
-
Alteration Type II
FILING TO COMBINE APTS D1,D3,&D4,D5&D6,D7&D8,D9&D10,D13&14,D15&D16&D17&D18,D19 -D20,A...
2018
-
DOB violation Apr 6, 2018
LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2016 INSPECTION REPORT
-
DOB violation Apr 6, 2018
LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2016 INSPECTION REPORT
2017
-
DOB violation Nov 29, 2017
AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE
FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
-
CLASS - 1
ELECTRICAL WORK WITHOUT A PERMIT.THE ENTIRE APTS#D1,4A,HALLWAYS:SUB FEEDER SUB PANELS,BRANCH CIRCUITS WIRING,RECEPTAC...
2016
-
Alteration Type II
FACADE REPAIRS AS PER PLANS SUBMITTED HEREWITH. SIDEWALK PROTECTION FILED SEPARATELY. NO CHANGE IN USE, EGRESS OR OCC...
-
Alteration Type II
FACADE REPAIRS AS PER PLANS SUBMITTED HEREWITH. SIDEWALK PROTECTION FILED SEPARATELY. NO CHANGE IN USE, EGRESS OR OCC...
2015
2013
-
DOB violation Mar 1, 2013
LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2011 INSPECTION REPORT
2011
-
DOB violation Dec 13, 2011
LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2010 INSPECTION REPORT
2009
-
DOB violation Dec 31, 2009
LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
2006
-
Alteration Type II
REFURBISH EXISTING APT D4 AS PER PLANSTO COMPLY WITH VIOL #34484013Y NO CHANGE IN USE,EGRESS OR OCCUPANCY.
2005
-
Non-Hazardous
FAILURE TO PROVIDE APPROVED PLANS AT PREMISES AT TIME OF INSPECTION NOTED: GUT RENOVATION OF APT #4 FAILED TO PROVIDE...
2004
-
Non-Hazardous
WORK WITHOUT A PERMIT NOTED APT D8(2ND FL) RENOVATION APT GUTTED (ALL PALSTER & LATH REMOVED NEW BATT & FIBERBOARD IN...
The most recent 6 events from each dataset, so no one source takes the axis. Each tab holds the full record.
Property Contacts
Contact information aggregated from multiple government sources
Registration Contracts
Contact information from multiple dwelling registrations
Building Permits
Owner information from Department of Buildings filings
Recent Building Permits
Owner information from recent DOB NOW filings
Deed Records
Parties from ACRIS deed and mortgage records
Property Records
Owner information from assessment and PLUTO records