161-165 Perry Street, Manhattan
Manhattan • Block 00637 • Lot 0077 • Zip: 10014
Condition
What the city currently has open against this building, counted from its own records.
Address
Land use and zoning
Building
Latest assessment
Neighborhood
The area this lot falls inside, and the commute Hoodkit measures from it.
Getting around
Estimated 3 days ago- Penn Station 13 min 4 walking, 9 riding
- Times Square 15 min 4 walking, 11 riding
- Union Square 16 min 4 walking, 12 riding
- Fulton Street 20 min 4 walking, 16 riding
- Grand Central 21 min 4 walking, 17 riding
- Downtown Brooklyn 27 min 4 walking, 23 riding
Around this address
Transit and places within 0.5 miles of the lot.
Getting out
Subway
Railroad
Ferry
Bus
Citi Bike
Places nearby
Capitaine
No description yet
Cove
No description yet
Salt Hank’s
No description yet
Via Carota
Via Carota is a cozy, rustic Italian restaurant in the heart of Greenwich Village. With its charming ambiance and del...
Demo
No description yet
Waverly Inn
Waverly Inn is a charming restaurant housed in a historic townhouse in the West Village. Known for its cozy atmospher...
Smacking Burger
No description yet
John's of Bleecker Street
No description yet
Activity
Sales, filings, permits and violations from every dataset, in one order.
2026
-
Alteration Type II
INTERIOR RENOVATION OF EXISTING APARTMENT. RELOCATE/REPLACE PARTITIONS FIXTURES, FINISHES, APPLIANCES, AND LIGHTING. ...
2025
-
DOB violation Aug 26, 2025
C-CONSTRUCTION OTHER OPTIONAL
FAILURE TO MAINTAIN. SUBMIT PLANS/DETAILS TO CEU BY 12/01/2025 REMEDY: OWNER TO RETAIN A NYS PE TO PREPARE PERMANENT ...
-
CLASS - 1
OBSERVED ON SIXTH FLOOR MAIN ROOF STRUCTURE IS COMPROMISED AND INADEQUATE SHORING USED TO SUPPORT ROOF. ENTIRE SIXTH ...
-
CLASS - 1
OBSERVED ON SIXTH FLOOR MAIN ROOF STRUCTURE IS COMPROMISED AND INADEQUATE SHORING USED TO SUPPORT ROOF. NO DETAILS FO...
-
DOB violation Aug 22, 2025
C-CONSTRUCTION OTHER OPTIONAL
FAILURE TO MAINTAIN.@TIME OF INSPECTION,OBSRVD MAIN ROOF DRAPED MESH UNDR CNCRTE SLAB IN A STATE OF DISREPAIR W/CRACK...
-
DOB violation Aug 22, 2025
C-CONSTRUCTION OTHER OPTIONAL
EMERGENCY WORK ORDER.@TIME OF INSPECTION,OBSRVD MAIN ROOF DRAPD MESH UNDR CNCRTE SLAB IN A STATE OF DISREPAIR W/CRCKS...
2024
-
HPD violation Nov 22, 2024
Class I
§27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27...
2023
-
HPD violation Nov 15, 2023
Class I
§27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27...
-
HPD violation Mar 15, 2023
Class A
(A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION ...
2022
-
HPD violation Nov 2, 2022
Class I
§27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27...
2021
-
HPD violation Oct 14, 2021
Class B
§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... AT SOUTH WALL 2 SQ FT IN THE BAT...
-
HPD violation Oct 14, 2021
Class B
§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... 2 SQ FT AT EAST WALL IN THE 2nd ...
2020
-
Alteration Type II
APPLICATION FILED FOR INTERIOR RENOVATION OF KITCHEN AND BATHROOM WITHIN RESIDENTIAL UNIT 4C+D; INCLUDING REMOVAL AND...
-
DOB violation Sep 24, 2020
E-ELEVATOR ELEVATORREQUIRED
-
DOB violation Sep 24, 2020
E-ELEVATOR ELEVATORREQUIRED
2019
-
DOB violation Sep 6, 2019
ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED
VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2017 CAT 1 INSP/TST TST
2018
-
Alteration Type II
EXTERIOR REPAIRS TO INCLUDE: RAILING REFURBISHMENT, HOIST BEAM ANCHORING, ROOF SLAB REINFORCEMENT AT THE PENTHOUSE LE...
2017
-
Alteration Type II
FILING FOR THE INTERIOR RENOVATION OF APARTMENT 5A WITH ASSOCIATED PLUMBING WORK AS PER PLANS SUBMITTED HEREWITH. NO ...
-
Alteration Type II
MINOR REMOVAL OF NON-LOAD BEARING PARTITIONS, NEW GWB PARTITIONS, DROPPED CEILINGS, CABINETRY & FINISHES; MODIFIC...
2016
-
Alteration Type II
CONSTRUCTION OF A NEW POWDER ROOM AT 1ST FLOOR. NO CHANGE OF USE, OCCUPANCY, FIRE PROTECTION OR EGRESS. PER DIRECTICE...
2012
-
CLASS - 2
40B07,41M07,100O02.(40B07)PROVIDE SAFE ACCESS TO MACHINE ROOM(CAGE).(41M07)PROVIDE SIGNS ON BOTH MACHINE ROOM DOORS T...
2009
-
CLASS - 1
SEC. BC3314.4.2 FAILURE TO MAINTAIN SUPPORTED SCAFFOLD. NOTED: SUPPORTED SCAFFOLD AT EXPOSURE'S #1,2 UNDER PERMIT #11...
2008
-
CLASS - 2
FAILURE TO SUBMIT AN ACCEPTABLE SIXTH ROUND TECHNICAL REPORT IN COMPLAINCE WITH CODE PROVISIONS: PERIODIC INSPECTION ...
-
CLASS - 2
WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCUMENTS AND/OR APPROVED AMENDMENTS. NOTED: MATERIAL HOIST BEING USED...
The most recent 6 events from each dataset, so no one source takes the axis. Each tab holds the full record.
Property Contacts
Contact information aggregated from multiple government sources
Registration Contracts
Contact information from multiple dwelling registrations
Building Permits
Owner information from Department of Buildings filings
Recent Building Permits
Owner information from recent DOB NOW filings
Deed Records
Parties from ACRIS deed and mortgage records
Property Records
Owner information from assessment and PLUTO records