Issued Violation Status Severity Description Penalty Balance due Hearing
Apr 1, 2026 39182780N ACTIVE CLASS - 2 ON EXPOSURE #2 FROM 1ST FLOOR TO 7TH FLOOR AND EXPOSURE #4 FROM 2ND FLOOR TO 7TH FLOOR EXTERIOR WALLS OUTBOARD INSULA... $6,250 $6,250 Jun 11, 2026
Jan 6, 2026 39548835P ACTIVE CLASS - 2 RESPONDED TO AN INCIDENT IN WHICH A WORKER WAS STRUCK ON THE WRIST BY A RESHORE POST WHILE RECEIVING IT FROM ANOTHER ... $5,000 $5,000 Oct 15, 2026
Dec 21, 2025 39548326R ACTIVE CLASS - 2 OBSERVED TEMPORARY CONSTRUCTION SIDEWALK NOT ADEQUATELY ILLUMINATED DURING NIGHTTIME HOURS, RESULTING IN POOR VISIBIL... $10,000 $10,000 Feb 26, 2026
Oct 1, 2025 39162034N ACTIVE CLASS - 2 AT TIME OF INSPECTION,BUILDING HAS BEEN DEMOLISHED UNDER PERMIT M01163529-I1-FD EXPIRING 11/11/2025 ,HOWEVER NO CERTI... $6,250 $6,250 Dec 11, 2025
Jul 1, 2025 37036052R ACTIVE CLASS - 2 FAILURE TO FILE REQUIRED ANNUAL BOILER INSPECTION REPORTS FOR LOW-PRESSURE BOILER 10000025771Y0001 IN ACCORDANCE WITH... $3,125 $3,125 Oct 16, 2025
Aug 25, 2023 39093419H ACTIVE CLASS - 1 FAILURE TO MAINTAIN BUILDING IN A CODE-COMPLIANT MANNER. AT THE TIME OF INSPECTION, I OBSERVED THE FRONT ENTRANCE OF ... $1,250 $1,250 Apr 2, 2024
Jan 3, 2015 32074891N RESOLVE CLASS - 1 B154,1,51,15,32A,50A,38,50B,50C,50D,50E. 50A-REMOVE DRAFT INDUCER FROM FLUEPIPE IN BOILER; 50B-FLUE PIPE NOT PROPERLY... $1,000 $0 Feb 19, 2015
Dec 26, 2014 32074751L RESOLVE CLASS - 1 B154,1,51. 51-OPERATING SEALED BOILER; DO NOT OPERATE BOILER UNTIL ALLHAZARDOUS CONDITIONS ARE IMMEDIATLEY CORRECTD A... $1,000 $0 Feb 12, 2015
Dec 16, 2014 32074750J RESOLVE CLASS - 1 51,32A,34A/B,38,50,50A. 51-DRAFRT INDUCER ON FLUE PIPE NO GOOD 51A-NOCOMBSTION AIR, 50 NO LIGHTS IN BOILER ROOM; 60A-... $1,000 $0 Mar 19, 2015
Oct 6, 2014 32074549H ACTIVE CLASS - 2 15,32A,34A,34B,36,38,50.36-WEIL MCLAIN BOILER MODEL 67819 NOT REGISTERED-RESGISTER THE BOILER & ALL VIOLATING CONDITI... $500 $0 Feb 26, 2015
Dec 3, 2009 34799399M RESOLVE CLASS - 2 WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCUMENTS AND/OR APPROVED PLANS.WORK BEING DONE UNDER JOB #120200852.N... $2,500 $0 Nov 4, 2010
Nov 18, 2009 32067470J RESOLVE CLASS - 1 51 50ABC 50A-FLUE PIPE NOT PROPERLY SEALED TO CHIMNEY BASE 50B-FLUE PIPE IMPROPER INSTILLATION FUMES 50C-FLUE PIPE MU... $0 $0 Jul 28, 2011
Nov 18, 2009 32067469M RESOLVE CLASS - 1 54 3B 32A 34A 50ABC 50A-FLUE PIPE NOT PROPERLY SEALED TO CHIMNEY 50B-FLUE PIPE NEED TO BE INSTALL THREE FEET ABOVE TH... $5,000 $0 Oct 7, 2010
Nov 2, 2009 34816742M RESOLVE CLASS - 2 FAIL TO PROVIDE APPROVED/ACCEPTED PLANS AT TIME OF INSPECTION. NOTED: AT JOB SITE ON 1ST FL AND CELLAR, THE INSPECTOR... $0 $0 Dec 31, 2009
Apr 30, 2009 34775242H RESOLVE CLASS - 3 WORK W/O A PERMIT WORK NOTED AT 1ST FL IN COMMERCIAL STORE HAVING REMOVE FIRE RATED MATERIAL FROM CELLAR TO EXPOSE JO... $100 $0 Jun 25, 2009
Feb 4, 2003 32041359X RESOLVE Hazardous B4B-BQ9-6B-16-32A-34A-34B-36-40-45A-50A-50B-50C-50D-50E-45B-48A. BQ9 - WEIL MCLAIN BOILER MUST BE LEGALIZED. 32A - MI... $0 $0 Jul 31, 2003