Skip to content

Job filings

261 West 19 Street, Manhattan • Block 00769 • Lot 0006

10 records

Work filed with the Department of Buildings under its legacy BIS system.

Latest action Job Type Status Work Cost Owner
Oct 9, 2018 122991414 Alteration Type II SIGNED OFF INSTALLATION OF NEW LINTEL AND REINFORCEMENT OF EXISTING JOISTS. NO CHANGE IN USE, OCCUPANCY OR EGRESS. $16,250 EIGHTH-19 COMPANY, LLC
Sep 24, 2018 140694620 Alteration Type II SIGNED OFF REMOVAL AND INSTALLATION OF INTERIOR NON-LOAD BEARING PARTITIONS, PLUMBING FIXTURES AND ASSOCIATED FINISHES AS PER DR... $51,750 EIGHTH-19 COMPANY, LLC
Jul 19, 2012 120837069 Alteration Type II SIGNED OFF MECHANICAL AND PLUMBING MODIFICATIONS AS PER DRAWINGS SUBMITTED HEREWITH. NO CHANGE IN USE, OCCUPANCY OR EGRESS. $44,500 EIGHTH-19 CORP. LLC
Jul 19, 2012 120837078 Alteration Type II SIGNED OFF REMOVAL AND INSTALLATION OF NON-LOAD BEARING PARTITIONS AND RELATED FINISHES AS PER PLANS FILED HEREWITH. NO CHANGE T... $85,000 EIGHTH-19 CORP. LLC
Aug 24, 2011 120391389 Alteration Type II SIGNED OFF REMOVAL AND INSTALLATION OF NON-LOAD BEARING PARTITIONS AND RELATED FINISHES, AS PER PLANS FILED HEREWITH. NO CHANGE ... $85,000 EIGHTH-19 COP. LLC
Jun 3, 2010 120153225 Alteration Type II SIGNED OFF STRUCTURAL MODIFICATIONS TO CREATE A CONVENIENCE OPENING BETWEEN 259 & 261 W. 19TH ST @ 1ST FL AS PER PLANS FILED... $4,000 EIGHTH-19 CO LLC
Aug 14, 2009 120094405 Alteration Type II PERMIT ISSUED - ENTIRE JOB/WORK CELLAR AND 1ST FLOOR, ERECT MINOR INTERIOR PARTITIONS, NEW FINISHES. INSTALL NEW PLUMBING FIXTURES AS PLANS FILED. NO... $75,785 EIGHTH-19 COMP LLC
Apr 13, 2009 110237468 Alteration Type II SIGNED OFF STRUCTURAL MODIFICATIONA AS PER PLANS FILED HEREWITH. APPLCATION FILED UNDER D IRECTIVE 2 $3,000 EIGHTH-19 COMP LLC
Apr 10, 2008 104499062 Alteration Type III SIGNED OFF INSTALL HEAVY DUTY SIDEWALK SHED FOR A TOTAL OF 30 FT LONG AT 261 WEST 19 STREET .-DURING REMEDIAL REPAIRS. WORK TO C... $0 BUCHBINDER&WARREN
Aug 4, 2006 103452229 Alteration Type II SIGNED OFF RENOVATION OF APT. 3W @ 3RD FL. INCLUDIN G, REMOVAL AND INSTALLATION OF NON-BEARING PARTITION, INSTALLATION OF NEW BA... $24,000 N/A