Job filings
248-250 West 30 Street, Manhattan • Block 00779 • Lot 0069
6 records
Work filed with the Department of Buildings under its legacy BIS system.
| Latest action | Job | Type | Status | Work | Cost | Owner |
|---|---|---|---|---|---|---|
| May 18, 2016 | 122099521 | Alteration Type II | SIGNED OFF | PROPOSE REMOVAL OF EXISTING STEAM BOILER, INSTALLATION OF NEW GAS FIRED BOILER, MECHANICAL DUCTWORK AND PIPING, REMOV... | $75,000 | HENEGAN CONSTRUCTION |
| Mar 21, 2016 | 122174119 | Alteration Type II | SIGNED OFF | INSTALLATION OF MECHANICAL DUCTWORK AND RELATED PIPING.INSTALLATION OF ADA BATHROOM AND RELATED PIPING. NO CHANGE TO ... | $76,000 | HENEGAN CONSTRUCTION |
| Feb 12, 2016 | 122165566 | Alteration Type II | SIGNED OFF | INSTALLATION OF A MANUAL AND AUTOMATIC SMOKE/CO DETECTION AND SPRINKLER FIRE ALARM SYSTEM. NO CHANGE IN USE, EGRESS O... | $36,000 | HENEGAN CONSTRUCTION |
| Nov 12, 2015 | 121961831 | Alteration Type II | SIGNED OFF | PROPOSE TO REMOVE EXISTING HVAC UNITS AND INSTALLATION OF NEW HVAC UNITS AND DUCTWORK AS PER PLANS FILED HEREWITH. NO... | $327,368 | HENEGAN CONSTRUCTION |
| Jul 30, 2015 | 122165058 | Alteration Type II | SIGNED OFF | INSTALLATION OF NEW SPRINKLER SYSTEM ON CELLAR LEVEL. NO CHANGE TO USE, EGRESS OR OCCUPANCY | $75,000 | HENEGAN CONSTRUCTION |
| Mar 5, 2015 | 122174100 | Alteration Type I | PERMIT ISSUED - ENTIRE JOB/WORK | FILED TO CHANGE USE ON CELLER LEVEL FROM BOILER ROOM AND STORAGE TO BOILER ROOM, STORAGE AND OFFICES. INTERIOR DEMOLI... | $167,000 | HENEGAN CONSTRUCTION |