ECB violations
108-110 West 24 Street, Manhattan • Block 00799 • Lot 0046
64 records
Environmental Control Board violations, which carry a hearing and a penalty.
| Issued | Violation | Status | Severity | Description | Penalty | Balance due | Hearing |
|---|---|---|---|---|---|---|---|
| Jan 22, 2002 | 34306749P | RESOLVE | Hazardous | HORIZONTAL NETTING NOT PROVIDED AT TIME OF INSPECTION STRIPPING ON 15 FL WAS IN PROGRESS AND THERE WERE NO HORIZONTAL... | $500 | $0 | Apr 18, 2002 |
| Jan 22, 2002 | 34314201J | RESOLVE | Hazardous | FAILURE TO SAFEGUARD PUBLIC AND PROPERTY ON JAN 18,2002 @4:30PM A STRINGER BEAM FELL OFF BUILDING AT 14 FL INTO HORIZ... | $1,500 | $0 | Apr 18, 2002 |
| Jan 22, 2002 | 34314202L | RESOLVE | Hazardous | NO ELEVATOR IN READINESS AT TIME OF INSPECTION FORMING WAS IN PROGRESSAT 17 FL HOWEVER ELEVATOR IN READINESS WAS ONLY... | $1,000 | $0 | Apr 18, 2002 |
| Jan 12, 2002 | 34263261Y | RESOLVE | Non-Hazardous | FAILURE TO CARRY OUT PERMITTED WORK IN ACCORDANCE WITH APPLICABLE LAWS AND REGUALTIONS IN THAT CONSTRUCTION ACTIVITIE... | $0 | $0 | Mar 14, 2002 |
| Jan 8, 2002 | 34306734M | RESOLVE | Hazardous | NO HANDRAILS ON STAIRWELL AT TIME OF INSPECTION, CONCRETE POURING IS IN PROGRESS @ 13FLR. STILL, NO HANDRAILS PROVIDE... | $3,150 | $0 | Apr 18, 2002 |
| Jan 8, 2002 | 34306735Y | RESOLVE | Non-Hazardous | NO D.O.T. PERMIT UPON INSPECTION OBSTRUCTIONS WERE IN SIDEWALK ( PORTABLE TOILETS ) & NO D.O.T. PERMIT HAS BEEN ISSUE... | $400 | $0 | Apr 18, 2002 |
| Jan 8, 2002 | 34306732Z | RESOLVE | Hazardous | NO ESCAPE HATCH PROVIDED AT TIME OF INSPECTION. PORING CONCRETE IS IN PROGRESS @ 13FLR. AND SALAMANDERS WERE USED FOR... | $500 | $0 | Apr 18, 2002 |
| Jan 8, 2002 | 34306733K | RESOLVE | Hazardous | VERTICAL NETTING NOT PROVIDED AT TIME OF INSPECTION NO VERTICAL NETS WERE AT FLOORS 10 & 9 STRIPPING FLOORS ARE AT 12... | $0 | $0 | Apr 18, 2002 |
| Jan 2, 2002 | 34306726M | RESOLVE | Hazardous | NO HANDRAILS AT TIME OF INSPECTION STAIRS ARE AT 8 FLOORAND NO HANDRAILS AT 8,7,6,5,4 FLOORS HAD BEEN INSTALLED FORMI... | $1,250 | $0 | Apr 5, 2002 |
| Jan 2, 2002 | 34306727Y | RESOLVE | Hazardous | NO TOEBOARDS: AT TIME OF INSPECTION TOEBOARDS WAS NOT PROVIDED ON ELEV SHAFT FROM 2 FLOOR TO 8 FLOOR ALSO VERTICAL NE... | $0 | $0 | Apr 4, 2002 |
| Dec 24, 2001 | 34288216X | RESOLVE | Hazardous | DISOBEY STOP WORK ORDER.AT TIME OF INSPECTION, STOP WORK ORDER WAS IN EFFECT AND THEY WERE FORMING 11TH FLR.WHICH IS ... | $0 | $0 | Feb 7, 2002 |
| Dec 21, 2001 | 34288215Y | RESOLVE | Hazardous | INSUFFIENT CONTAINERS.AT TIME OF INSPECTION DEBRIS HAS ACCUMALTED AT FLOORS 1=3 CU YDS,5=2 CU YDS, 6=3CU YDS.REMEDY:P... | $1,250 | $0 | Mar 28, 2002 |
| Dec 21, 2001 | 34288214M | RESOLVE | Hazardous | NO ELEVATOR IN READINESS.AT TIME OF INSPECTION, THE ELEVATOR WAS STILL IN THE PROCESS IN READINESS,HOWEVER WORK BEING... | $1,000 | $0 | Mar 28, 2002 |
| Dec 18, 2001 | 34298623M | RESOLVE | Non-Hazardous | WORK W/O PERMIT AT TIME OF INSPECTION STANDPIPE WAS BEING INSTALLED @ 6TH FLOOR AND D.O.B. RECORDS SHOW THAT NO PERMI... | $250 | $0 | Feb 7, 2002 |