160-166 West 26 Street, Manhattan
Manhattan • Block 00801 • Lot 0001 • Zip: 10001
Condition
What the city currently has open against this building, counted from its own records.
Address
Land use and zoning
Building
Latest assessment
Neighborhood
The area this lot falls inside, and the commute Hoodkit measures from it.
Getting around
Estimated 3 days ago- Penn Station 9 min 3 walking, 6 riding
- Times Square 10 min 3 walking, 7 riding
- Union Square 16 min 3 walking, 13 riding
- Grand Central 18 min 3 walking, 15 riding
- Fulton Street 18 min 3 walking, 15 riding
- Downtown Brooklyn 23 min 3 walking, 20 riding
Around this address
Transit and places within 0.5 miles of the lot.
Getting out
Subway
Railroad
Ferry
Bus
Citi Bike
Places nearby
Cote
Cote is a modern Korean Steakhouse in the heart of NYC, offering a unique dining experience with premium cuts of meat...
Ambassadors Clubhouse
No description yet
Cafe Carmellini
No description yet
Eleven Madison Park
No description yet
Clemente Bar
No description yet
Nan Xiang Xiao Long Bao
No description yet
Grandma’s Home
No description yet
Markette
No description yet
Activity
Sales, filings, permits and violations from every dataset, in one order.
2026
-
CLASS - 2
AT THE TIME OF INSPECTION, I OBSERVED INADEQUATE ROOF PROTECTION AT EXPOSURE #2. THE REQUIRED FLAME-RETARDANT FOAM AN...
-
CLASS - 1
NOTE: AT TIME OF INSPECTION, I OBSERVED MULTIPLE PARAPET CLAMPS INSTALLED ALONG THE PARAPET, UPON REQUEST FOR THE REG...
-
CLASS - 1
NOTE: AT TIME OF INSPECTION ON A ACTIVE SITE, I OBSERVED SUSPENDED SCAFFOLD IN PLACE UPON REQUEST FOR THE REQUIRED IN...
-
CLASS - 2
ATOI CONSTRUCTION WORK WAS IN PROGRESS AND THE REQUIRED DOB WORK PERMIT WAS NOT POSTED IN A CONSPICUOUS LOCATION ON T...
-
CLASS - 1
ATOI CONSTRUCTION WORK WAS OBSERVED IN PROGRESS WITHOUT THE REQUIRED DAILY PRE-SHIFT SAFETY DOCUMENTATION AVAILABLE O...
2024
-
DOB violation Feb 22, 2024
FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED
FAILED TO FILE FISP CYCLE 9C TECHNICAL REPORT BY 2/21/2024
2023
-
CLASS - 2
FAILURE TO MAINTAIN BUILDING WALLS AND APPURTENANCES. AT TIME OF INSPECTION, OBSERVED TERRA-COTTA CRACKED AT THE CORN...
-
DOB violation Feb 2, 2023
BENCH-FAILURE TO BENCHMARK NONE
FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
-
Alteration Type II
INTERIOR ALTERATIONS AT 20TH FLOOR (EPAM) AS INDICATED ON DRAWINGS. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
2022
-
Alteration Type III
INSTALLATION OF A HEAVY DUTY SIDEWALK SHED DURING BUILDING ALTERATION, FILED SEPARATELY. SIDEWALK SHED SHALL COMPLY W...
-
Alteration Type II
GENERAL CONSTRUCTION ALTERATIONS FOR FULL FACADE RENOVATION; RELATED WORK AS PER PLANS SUBMITTED HEREWITH. NO CHANGE ...
-
Alteration Type II
FACADE ALTERATIONS, REMEDIAL WORK/REPAIR TO EXPOSED STEEL, INSTALLATION OF METAL FACADE AND SUPPLEMENTAL STEEL SUPPOR...
-
Alteration Type II
IT IS PROPOSED TO REMOVE NON LOAD BEARING PARTITIONS, HUNG CEILINGS AND FINISHES TO BE REPLACED WITH NEW AT SELECT LO...
-
Alteration Type II
NON-STRUCTURAL DEMO & INTERIOR RENOVATION AS SHOWN ON PLANS.
2021
-
DOB violation Oct 27, 2021
AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE
FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
2020
-
DOB violation May 22, 2020
E-ELEVATOR ELEVATORREQUIRED
-
DOB violation May 22, 2020
E-ELEVATOR ELEVATORREQUIRED
-
DOB violation May 22, 2020
E-ELEVATOR ELEVATORREQUIRED
2006
The most recent 6 events from each dataset, so no one source takes the axis. Each tab holds the full record.
Property Contacts
Contact information aggregated from multiple government sources
Building Permits
Owner information from Department of Buildings filings
Recent Building Permits
Owner information from recent DOB NOW filings
Deed Records
Parties from ACRIS deed and mortgage records
Property Records
Owner information from assessment and PLUTO records