DOB violations
144-154 West 30 Street, Manhattan • Block 00805 • Lot 0094
212 records
Violations issued by the Department of Buildings.
| Issued | Violation | Type | Category | Description | Disposed |
|---|---|---|---|---|---|
| Jun 20, 2023 | 00243 | HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED | V-DOB VIOLATION - ACTIVE | VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL HGH PRESSURE INSPECTION | — |
| Jun 20, 2023 | 01449 | HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED | V-DOB VIOLATION - ACTIVE | VIOLATION ISSUED-FAILURE TO FILE 2018 INTERNAL HGH PRESSURE INSPECTION | — |
| Jun 20, 2023 | 02705 | HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED | V-DOB VIOLATION - ACTIVE | VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL HGH PRESSURE INSPECTION | — |
| Jun 20, 2023 | 03847 | HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED | V-DOB VIOLATION - ACTIVE | VIOLATION ISSUED-FAILURE TO FILE 2019 INTERNAL HGH PRESSURE INSPECTION | — |
| Jun 20, 2023 | 02709 | HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED | V-DOB VIOLATION - ACTIVE | VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL HGH PRESSURE INSPECTION | — |
| Jun 20, 2023 | 01450 | HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED | V-DOB VIOLATION - ACTIVE | VIOLATION ISSUED-FAILURE TO FILE 2018 INTERNAL HGH PRESSURE INSPECTION | — |
| Jun 20, 2023 | 01448 | HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED | V-DOB VIOLATION - ACTIVE | VIOLATION ISSUED-FAILURE TO FILE 2018 INTERNAL HGH PRESSURE INSPECTION | — |
| Jun 20, 2023 | 00242 | HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED | V-DOB VIOLATION - ACTIVE | VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL HGH PRESSURE INSPECTION | — |
| Jun 20, 2023 | 02706 | HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED | V-DOB VIOLATION - ACTIVE | VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL HGH PRESSURE INSPECTION | — |
| Apr 25, 2023 | 01272 | HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED | V-DOB VIOLATION - ACTIVE | VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL HIGH PRESSURE INSPECTION | — |
| Apr 25, 2023 | 01453 | HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED | V-DOB VIOLATION - ACTIVE | VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL HIGH PRESSURE INSPECTION | — |
| Apr 25, 2023 | 01214 | HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED | V-DOB VIOLATION - ACTIVE | VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL HIGH PRESSURE INSPECTION | — |
| Apr 25, 2023 | 00067 | HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED | V-DOB VIOLATION - ACTIVE | VIOLATION ISSUED-FAILURE TO FILE 2022 INTERNAL HIGH PRESSURE INSPECTION | — |
| Apr 25, 2023 | 00303 | HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED | V-DOB VIOLATION - ACTIVE | VIOLATION ISSUED-FAILURE TO FILE 2022 INTERNAL HIGH PRESSURE INSPECTION | — |
| Apr 25, 2023 | 01212 | HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED | V-DOB VIOLATION - ACTIVE | VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL HIGH PRESSURE INSPECTION | — |
| Apr 25, 2023 | 00065 | HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED | V-DOB VIOLATION - ACTIVE | VIOLATION ISSUED-FAILURE TO FILE 2022 INTERNAL HIGH PRESSURE INSPECTION | — |
| Apr 25, 2023 | 00121 | HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED | V-DOB VIOLATION - ACTIVE | VIOLATION ISSUED-FAILURE TO FILE 2022 INTERNAL HIGH PRESSURE INSPECTION | — |
| Apr 25, 2023 | 01213 | HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED | V-DOB VIOLATION - ACTIVE | VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL HIGH PRESSURE INSPECTION | — |
| Apr 25, 2023 | 00066 | HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED | V-DOB VIOLATION - ACTIVE | VIOLATION ISSUED-FAILURE TO FILE 2022 INTERNAL HIGH PRESSURE INSPECTION | — |
| Feb 22, 2022 | 00190 | FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED | V*-DOB VIOLATION - DISMISSED | FAILED TO FILE FISP CYCLE 9A TECHNICAL REPORT BY 02/21/2022 | Feb 19, 2026 |
| Jul 20, 2021 | 9027/703333 | E-ELEVATOR ELEVATORREQUIRED | V*-DOB VIOLATION - Resolved | — | Mar 16, 2023 |
| Jul 20, 2021 | 9027/703331 | E-ELEVATOR ELEVATORREQUIRED | V*-DOB VIOLATION - Resolved | — | Dec 16, 2022 |
| Jul 20, 2021 | 9027/703334 | E-ELEVATOR ELEVATORREQUIRED | V*-DOB VIOLATION - Resolved | — | Mar 16, 2023 |
| Jul 20, 2021 | 9027/703332 | E-ELEVATOR ELEVATORREQUIRED | V*-DOB VIOLATION - Resolved | — | Mar 16, 2023 |
| Mar 16, 2020 | 00074 | HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED | V-DOB VIOLATION - ACTIVE | VIOLATION ISSUED - FAILURE TO FILE 2017 EXTERNAL HIGH PRESSURE BOILER INSPECTION | — |
| Mar 16, 2020 | 00083 | HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED | V-DOB VIOLATION - ACTIVE | VIOLATION ISSUED - FAILURE TO FILE 2017 INTERNAL HIGH PRESSURE BOILER INSPECTION | — |
| Mar 16, 2020 | 00084 | HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED | V*-DOB VIOLATION - DISMISSED | VIOLATION ISSUED - FAILURE TO FILE 2017 INTERNAL HIGH PRESSURE BOILER INSPECTION | Mar 6, 2025 |
| Mar 16, 2020 | 00075 | HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED | V-DOB VIOLATION - ACTIVE | VIOLATION ISSUED - FAILURE TO FILE 2017 EXTERNAL HIGH PRESSURE BOILER INSPECTION | — |
| Mar 16, 2020 | 00123 | HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED | V-DOB VIOLATION - ACTIVE | VIOLATION ISSUED - FAILURE TO FILE 2017 EXTERNAL HIGH PRESSURE BOILER INSPECTION | — |
| Mar 16, 2020 | 00076 | HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED | V-DOB VIOLATION - ACTIVE | VIOLATION ISSUED - FAILURE TO FILE 2017 EXTERNAL HIGH PRESSURE BOILER INSPECTION | — |
| Mar 16, 2020 | 00309 | HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED | V*-DOB VIOLATION - DISMISSED | VIOLATION ISSUED - FAILURE TO FILE 2017 EXTERNAL HIGH PRESSURE BOILER INSPECTION | Jan 29, 2025 |
| Mar 16, 2020 | 00085 | HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED | V*-DOB VIOLATION - DISMISSED | VIOLATION ISSUED - FAILURE TO FILE 2017 INTERNAL HIGH PRESSURE BOILER INSPECTION | Feb 27, 2025 |
| Mar 16, 2020 | 00138 | HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED | V*-DOB VIOLATION - DISMISSED | VIOLATION ISSUED - FAILURE TO FILE 2017 INTERNAL HIGH PRESSURE BOILER INSPECTION | Mar 10, 2025 |
| Mar 16, 2020 | 00333 | HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED | V*-DOB VIOLATION - DISMISSED | VIOLATION ISSUED - FAILURE TO FILE 2017 INTERNAL HIGH PRESSURE BOILER INSPECTION | Jan 29, 2025 |
| Jan 25, 2020 | 0501DA | C-CONSTRUCTION OTHER OPTIONAL | V*-DOB VIOLATION - DISMISSED | BOROUGH COMMISSIONER HAS ORDERED A STOP WORK ORDER UNDER APPLICATION #123767021 DUE TO APPLICANTS FILLING PREVILIGES ... | Jul 2, 2020 |
| Jul 23, 2018 | 9027/631964 | E-ELEVATOR ELEVATORREQUIRED | V*-DOB VIOLATION - Resolved | — | Apr 29, 2019 |
| Jul 21, 2018 | 9027/631958 | E-ELEVATOR ELEVATORREQUIRED | V*-DOB VIOLATION - Resolved | — | Apr 29, 2019 |
| Jul 20, 2018 | 9027/631962 | E-ELEVATOR ELEVATORREQUIRED | V*-DOB VIOLATION - Resolved | — | Aug 13, 2019 |
| Jul 20, 2018 | 9027/631957 | E-ELEVATOR ELEVATORREQUIRED | V*-DOB VIOLATION - Resolved | — | Apr 29, 2019 |
| Jun 22, 2018 | 00065 | HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED | V*-DOB VIOLATION - DISMISSED | VIOLATION ISSUED FOR FAILURE TO FILE 2016 ANNUAL HIGH PRESSURE BOILER INSPECTION | Aug 29, 2018 |
| May 31, 2018 | 01628 | FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED | V*-DOB VIOLATION - DISMISSED | FAILED TO FILE FISP CYCLE 8A TECHNICAL REPORT BY 02/21/2017 | Feb 19, 2026 |
| Jun 28, 2017 | 9027/605549 | E-ELEVATOR ELEVATORREQUIRED | V*-DOB VIOLATION - Resolved | — | Nov 15, 2017 |
| Jun 28, 2017 | 9027/605548 | E-ELEVATOR ELEVATORREQUIRED | V*-DOB VIOLATION - Resolved | — | Aug 25, 2017 |
| Jun 28, 2017 | 9027/605547 | E-ELEVATOR ELEVATORREQUIRED | V*-DOB VIOLATION - Resolved | — | Aug 25, 2017 |
| Jun 27, 2017 | 0501HM | C-CONSTRUCTION OTHER OPTIONAL | V*-DOB VIOLATION - DISMISSED | BOROUGH COMMISSIONER HAS ORDERED ALL WORK STOPPED FOR APPLICATION PERM IT #121494481. STOP ALL WORK IMMEDIATELY AND M... | Jul 7, 2017 |
| Mar 6, 2017 | HAZ86854 | FISP-FACADE SAFETY PROGRAM FACADE REQUIRED | V-DOB VIOLATION - ACTIVE | — | — |
| Dec 1, 2016 | 00408 | EVCAT1-ELEVATOR ANNUAL INSPECTION / TEST ELEVATORREQUIRED | V*-DOB VIOLATION - DISMISSED | VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2015 INSPECTION/TEST | Dec 13, 2016 |
| Jun 2, 2016 | 9027/579126 | E-ELEVATOR ELEVATORREQUIRED | V*-DOB VIOLATION - Resolved | — | Sep 21, 2016 |
| Mar 3, 2015 | 00386 | HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED | V*-DOB VIOLATION - DISMISSED | VIOLATION ISSUED FOR FAILURE TO FILE 2013 ANNUAL HIGH PRESSURE BOILER INSPECTION | Oct 18, 2017 |
| Mar 3, 2015 | 00132 | HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED | V*-DOB VIOLATION - DISMISSED | VIOLATION ISSUED FOR FAILURE TO FILE 2013 ANNUAL HIGH PRESSURE BOILER INSPECTION | Oct 18, 2017 |