DOB violations
36 West 15 Street, Manhattan • Block 00816 • Lot 0062
81 records
Violations issued by the Department of Buildings.
| Issued | Violation | Type | Category | Description | Disposed |
|---|---|---|---|---|---|
| Nov 14, 2025 | 00917 | HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED | V-DOB VIOLATION - ACTIVE | VIOLATION ISSUED-FAILURE TO FILE 2024 INTERNAL HGH PRESSURE INSPECTION | — |
| Nov 14, 2025 | 00122 | HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED | V-DOB VIOLATION - ACTIVE | VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL HGH PRESSURE INSPECTION | — |
| Sep 23, 2024 | 00128 | HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED | V-DOB VIOLATION - ACTIVE | VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL HGH PRESSURE INSPECTION | — |
| Sep 23, 2024 | 00969 | HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED | V-DOB VIOLATION - ACTIVE | VIOLATION ISSUED-FAILURE TO FILE 2023 INTERNAL HGH PRESSURE INSPECTION | — |
| Jun 30, 2023 | 01709 | HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED | V-DOB VIOLATION - ACTIVE | VIOLATION ISSUED-FAILURE TO FILE 2020 INTERNAL HGH PRESSURE INSPECTION | — |
| Jun 30, 2023 | 02926 | HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED | V-DOB VIOLATION - ACTIVE | VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL HGH PRESSURE INSPECTION | — |
| Jun 30, 2023 | 00556 | HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED | V-DOB VIOLATION - ACTIVE | VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL HGH PRESSURE INSPECTION | — |
| Jun 30, 2023 | 04058 | HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED | V-DOB VIOLATION - ACTIVE | VIOLATION ISSUED-FAILURE TO FILE 2021 INTERNAL HGH PRESSURE INSPECTION | — |
| Jun 20, 2023 | 15188 | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | V*-DOB VIOLATION - DISMISSED | VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION | May 12, 2026 |
| Jun 20, 2023 | 04172 | HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED | V-DOB VIOLATION - ACTIVE | VIOLATION ISSUED-FAILURE TO FILE 2019 INTERNAL HGH PRESSURE INSPECTION | — |
| Jun 20, 2023 | 03029 | HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED | V-DOB VIOLATION - ACTIVE | VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL HGH PRESSURE INSPECTION | — |
| Jun 20, 2023 | 01807 | HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED | V-DOB VIOLATION - ACTIVE | VIOLATION ISSUED-FAILURE TO FILE 2018 INTERNAL HGH PRESSURE INSPECTION | — |
| Jun 20, 2023 | 00597 | HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED | V-DOB VIOLATION - ACTIVE | VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL HGH PRESSURE INSPECTION | — |
| Jun 20, 2023 | 35980 | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | V*-DOB VIOLATION - DISMISSED | VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION | May 12, 2026 |
| Apr 25, 2023 | 01246 | HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED | V-DOB VIOLATION - ACTIVE | VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL HIGH PRESSURE INSPECTION | — |
| Apr 25, 2023 | 00096 | HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED | V-DOB VIOLATION - ACTIVE | VIOLATION ISSUED-FAILURE TO FILE 2022 INTERNAL HIGH PRESSURE INSPECTION | — |
| Jul 30, 2021 | 9027/703322 | E-ELEVATOR ELEVATORREQUIRED | V-DOB VIOLATION - ACTIVE | — | — |
| Jul 16, 2020 | 9027/685832 | E-ELEVATOR ELEVATORREQUIRED | V-DOB VIOLATION - ACTIVE | — | — |
| Jul 16, 2020 | 9027/685831 | E-ELEVATOR ELEVATORREQUIRED | V-DOB VIOLATION - ACTIVE | — | — |
| Mar 16, 2020 | 00114 | HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED | V-DOB VIOLATION - ACTIVE | VIOLATION ISSUED - FAILURE TO FILE 2017 INTERNAL HIGH PRESSURE BOILER INSPECTION | — |
| Mar 16, 2020 | 00098 | HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED | V-DOB VIOLATION - ACTIVE | VIOLATION ISSUED - FAILURE TO FILE 2017 EXTERNAL HIGH PRESSURE BOILER INSPECTION | — |
| Sep 6, 2019 | 01081 | ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED | V*-DOB VIOLATION - DISMISSED | VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2017 CAT 1 INSP/TST TST | May 26, 2026 |
| Jun 22, 2018 | 00036 | HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED | V*-DOB VIOLATION - DISMISSED | VIOLATION ISSUED FOR FAILURE TO FILE 2016 ANNUAL HIGH PRESSURE BOILER INSPECTION | May 12, 2026 |
| May 31, 2018 | 01297 | FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED | V*-DOB VIOLATION - DISMISSED | FAILED TO FILE FISP CYCLE 8A TECHNICAL REPORT BY 02/21/2017 | May 26, 2026 |
| Jan 26, 2018 | 01368 | ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED | V*-DOB VIOLATION - DISMISSED | VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2016 CAT 1 INSP/TST | Oct 2, 2018 |
| Jul 7, 2017 | 9027/605876 | E-ELEVATOR ELEVATORREQUIRED | V*-DOB VIOLATION - Resolved | — | Mar 20, 2018 |
| Jul 7, 2017 | 9027/605875 | E-ELEVATOR ELEVATORREQUIRED | V*-DOB VIOLATION - Resolved | — | Apr 23, 2019 |
| Jun 23, 2017 | 00041 | HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED | V*-DOB VIOLATION - DISMISSED | VIOLATION ISSUED FOR FAILURE TO FILE 2015 ANNUAL HIGH PRESSURE BOILER INSPECTION | May 12, 2026 |
| Dec 16, 2016 | 00036 | HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED | V*-DOB VIOLATION - DISMISSED | VIOLATION ISSUED FOR FAILURE TO FILE 2014 ANNUAL HIGH PRESSURE BOILER INSPECTION | May 12, 2026 |
| Nov 14, 2016 | 01454 | ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED | V*-DOB VIOLATION - DISMISSED | VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2014 CAT 1 INSP/TST | Jan 10, 2017 |
| Jun 14, 2016 | 9027/578810 | E-ELEVATOR ELEVATORREQUIRED | V*-DOB VIOLATION - Resolved | — | Apr 23, 2019 |
| Jun 14, 2016 | 9027/578808 | E-ELEVATOR ELEVATORREQUIRED | V*-DOB VIOLATION - Resolved | — | Apr 7, 2017 |
| Jul 16, 2015 | 9028/541865 | E-ELEVATOR ELEVATORREQUIRED | V*-DOB VIOLATION - Resolved | — | Oct 21, 2015 |
| Jul 16, 2015 | 9028/541867 | E-ELEVATOR ELEVATORREQUIRED | V*-DOB VIOLATION - Resolved | — | Oct 21, 2015 |
| Oct 31, 2014 | 00571 | EVCAT1-ELEVATOR ANNUAL INSPECTION / TEST ELEVATORREQUIRED | V*-DOB VIOLATION - DISMISSED | VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2013 INSPECTION/TEST | Mar 25, 2015 |
| Oct 31, 2014 | 00572 | EVCAT1-ELEVATOR ANNUAL INSPECTION / TEST ELEVATORREQUIRED | V*-DOB VIOLATION - DISMISSED | VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2013 INSPECTION/TEST | Mar 25, 2015 |
| Jul 16, 2014 | 9028/514687 | E-ELEVATOR ELEVATORREQUIRED | V*-DOB VIOLATION - Resolved | — | Jul 9, 2015 |
| Jul 16, 2014 | 9028/514686 | E-ELEVATOR ELEVATORREQUIRED | V*-DOB VIOLATION - Resolved | — | Oct 21, 2015 |
| May 15, 2014 | 00028 | HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED | V*-DOB VIOLATION - DISMISSED | VIOLATION ISSUED FOR FAILURE TO FILE 2012 ANNUAL HIGH PRESSURE BOILER INSPECTION | May 12, 2026 |
| Mar 31, 2014 | 00919 | EVCAT1-ELEVATOR ANNUAL INSPECTION / TEST ELEVATORREQUIRED | V*-DOB VIOLATION - DISMISSED | VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2012 INSPECTION/TEST | May 7, 2014 |
| Mar 31, 2014 | 00918 | EVCAT1-ELEVATOR ANNUAL INSPECTION / TEST ELEVATORREQUIRED | V*-DOB VIOLATION - DISMISSED | VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2012 INSPECTION/TEST | May 7, 2014 |
| Jan 31, 2013 | 00419 | FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED | V*-DOB VIOLATION - DISMISSED | FAILED TO FILE FISP CYCLE 7A TECHNICAL REPORT BY 02/21/2012 | May 15, 2013 |
| Nov 27, 2012 | 9028/451399 | E-ELEVATOR ELEVATORREQUIRED | V*-DOB VIOLATION - Resolved | — | Jul 8, 2014 |
| Nov 27, 2012 | 9028/451350 | E-ELEVATOR ELEVATORREQUIRED | V*-DOB VIOLATION - Resolved | — | Jul 8, 2014 |
| Dec 9, 2010 | 9027/366614 | E-ELEVATOR ELEVATORREQUIRED | V*-DOB VIOLATION - Resolved | — | May 4, 2011 |
| Dec 9, 2010 | 9027/366615 | E-ELEVATOR ELEVATORREQUIRED | V*-DOB VIOLATION - Resolved | — | May 4, 2011 |
| Jul 21, 2009 | 9444/300117 | E-ELEVATOR ELEVATORREQUIRED | V*-DOB VIOLATION - Resolved | — | Mar 31, 2011 |
| Jul 21, 2009 | 9444/300116 | E-ELEVATOR ELEVATORREQUIRED | V*-DOB VIOLATION - Resolved | — | Mar 31, 2011 |
| May 29, 2008 | 9444/257019 | E-ELEVATOR ELEVATORREQUIRED | V*-DOB VIOLATION - Resolved | — | Sep 25, 2009 |
| May 29, 2008 | 9444/257000 | E-ELEVATOR ELEVATORREQUIRED | V*-DOB VIOLATION - Resolved | — | Sep 9, 2009 |