Job filings
34 West 22 Street, Manhattan • Block 00823 • Lot 0062
20 records
Work filed with the Department of Buildings under its legacy BIS system.
| Latest action | Job | Type | Status | Work | Cost | Owner |
|---|---|---|---|---|---|---|
| May 10, 2022 | 123124626 | Alteration Type II | SIGNED OFF | FILING INSTALLATION OF TWO (2) PRIMARY BACKFLOW PREVENTERS ON EXISTING 4" SPRINKLER SERVICE AND NEW 3" DOMESTIC WATER... | $10,000 | SECOND JAM DEVELOPMENT LLC |
| Nov 25, 2019 | 123471475 | Alteration Type II | SIGNED OFF | FILING FOR INTERIOR RENOVATIONS FOR THE HONEYBRAINS CAFE CONSISTING OF REARRANGEMENT OF NON LOAD BEARING PARTITIONS, ... | $349,910 | SECOND JAM DEVELOPMENT LLC. |
| Nov 19, 2019 | 123471402 | Alteration Type II | SIGNED OFF | INSTALLATION OF MANUAL AUTOMATIC SMOKE/HEAT/CO DETECTION AND SPRINKLER FIRE ALARM SYSTEM AS SHOWN ON DRAWINGS FILED H... | $20,000 | SECOND JAM DEVELOPMENT LLC. |
| Oct 15, 2019 | 123471411 | Alteration Type II | SIGNED OFF | MODIFICATION OF SPRINKLER SYSTEM ON THE CELLAR & 1ST FLOOR AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE,... | $42,000 | SECOND JAM DEVELOPMENT LLC. |
| Sep 17, 2019 | 123664230 | Alteration Type II | SIGNED OFF | INSTALL FIRE SUPPRESSION SYSTEM ONLY AS SHOWN ON PLAN, IN CONJUNCTION WITH DOB#123471475. FIRE SUPP. SHUT OFF VALVE H... | $3,000 | SECOND JAM DEVELOPMENT LLC |
| Dec 10, 2018 | 123385354 | Alteration Type II | SIGNED OFF | PARTIAL DEMOLITION OF EXISTING NON BEARING WALLS AND FINISHES AT EXISTING RETAIL SPACE. NO CHANGE TO EGRESS, USE OR O... | $44,000 | SECOND JAM DEVELOPMENT LLC |
| Nov 13, 2017 | 120966829 | Alteration Type I | SIGNED OFF | CHANGE OF USE OF FLOORS 3-6 TO APARTMENTS, INTERIOR RENOVATION THAT INCLUDES G ENERAL CONSTRUCTION, MECANICAL & P... | $291,646 | SECOND JAM DEVELOPMENT |
| Sep 29, 2017 | 121561103 | Alteration Type III | SIGNED OFF | INSTALLATION OF SCAFFOLD ON TOP OF THE EXISTING SIDEWALK SHED (FILED SEPARATELY)AS PER PLANS DURING GENERAL CONSTRUCT... | $0 | REPUBLIC SCAFFOLD & HOIST |
| Sep 29, 2017 | 121561096 | Alteration Type III | SIGNED OFF | INSTALLATION OF A HEAVY DUTY SIDEWALK SHED APPROXIMATELY 34' LONG AS PER PLANS DURING GENERAL CONSTRUCTION WORK. NO C... | $0 | REPUBLIC SCAFFOLD & HOIST |
| May 31, 2017 | 122801735 | Alteration Type II | SIGNED OFF | SPRINKLER WORK FILE IN CONJUNCTION WITH ARCHITECTURAL APPLICATION FOR THE SECOND FLOOR. NO CHANGE IN USE, EGRESS OR O... | $10,800 | SECOND JAM DEVELOPMENT |
| May 5, 2017 | 122794707 | Alteration Type II | SIGNED OFF | PROPOSED ALTERATION AND MODIFICATION OF EXISTING OFFICE SPACE AT 2ND FLOOR. NO CHANGE IN USE, EGRESS OR OCCUPANCY. | $97,800 | SECOND JAM DEVELOPMENT |
| Apr 19, 2017 | 122810752 | Alteration Type II | SIGNED OFF | MECHANICAL AND PLUMBING WORK FILE IN CONJUNCTION WITH ARCHITECTURAL APPLICATION FOR THE SECOND FLOOR. NO CHANGE IN US... | $36,000 | SECOND JAM DEVELOPMENT |
| Jun 26, 2015 | 121697690 | Alteration Type II | SIGNED OFF | STRUCTURAL WORK AS SHOW ON PLANS INCLUDING NEW INSTALLATION OF STAIRS.REAR BALCONIES. BALCONY APPROVED UNDER APPLICAT... | $68,250 | SECOND JAM DEVELOPMENT |
| Apr 22, 2015 | 121850336 | Alteration Type II | SIGNED OFF | MODIFICATIONS TO EXISITING SPRINKLER SYSTEM | $55,610 | SECOND JAM DEVELOPMENT |
| Jun 12, 2013 | 121600990 | Alteration Type II | PLAN EXAM - DISAPPROVED | STRUCTURAL WORK AS SHOW ON PLANS INCLUDING NEW INSTALLATION OF STAIRS. | $68,200 | SECOND JAM DEVELOPMENT |
| Mar 19, 2013 | 140063384 | Alteration Type III | PLAN EXAM - IN PROCESS | INSTALLATION OF A HEAVY DUTY SIDEWALK SHED APPROXIMATELY 34' LONG AS PER PLANS DURING GENERAL CONSTRUCTION WORK. NO C... | $0 | REPUBLIC SCAFFOLD & HOIST |
| Aug 10, 2011 | 120623619 | Alteration Type II | SIGNED OFF | MINOR RENOVATION OF OFFICE SPACE INCLUDING MINOR PLUMBING WORK AS SHOWN ON PLANS FILED HEREWITH. | $34,000 | SECOND JAM DEVELOPMENT |
| Mar 22, 2011 | 120586268 | Alteration Type II | PERMIT ISSUED - ENTIRE JOB/WORK | RENOVATION OF EXISTING OFFICE SPACE TO INCLUDE DEMOLITION AND CONSTRUCTION OF NEW PARTITIONS AND FINISHES AS SHOWN ON... | $43,000 | SECOND JAM DEVELOPMENT |
| Mar 22, 2011 | 110373499 | Alteration Type II | SIGNED OFF | INSTALLATION OF SPRINKLER HEADS AND PIPING FROM FLOORS 2 THRU 6, ON AN EXISTING SPRINKLER SERVICE. NO CHANGE TO USE, ... | $80,400 | SECOND JAM DEVELOPMENT |
| Sep 21, 2006 | 104432160 | Alteration Type I | SIGNED OFF | Change of use at second floor from beauty parlor to office use to include plumbing and miscellaneous carpentry. | $5,000 | Second Jam Development LLC |