Job filings
1 West 29 Street, Manhattan • Block 00831 • Lot 0033
27 records
Work filed with the Department of Buildings under its legacy BIS system.
| Latest action | Job | Type | Status | Work | Cost | Owner |
|---|---|---|---|---|---|---|
| Apr 11, 2023 | 121204632 | Alteration Type I | SIGNED OFF | ALT ONE FILING TO ADD A BOILER ROOM, MEEETING ROOMS AND RESTROOMS AS SHOWN ON DRAWINGS FILED HEREWITH. WE ARE TO UPDA... | $2,350,000 | COLLEGIATE CHURCH OF NEW YORK |
| Jan 3, 2023 | 121535320 | Alteration Type II | SIGNED OFF | MODIFICATIONS/ADDITIONS TO THE INDIVIDUALLY CODED FIRE ALARM SYSTEM WITH TWO WAY VOICE COMMUNICATION. NO CHANGE TO US... | $15,000 | COLLEGIATE CHURCH CORP |
| Dec 27, 2022 | 121615243 | Alteration Type III | SIGNED OFF | INSTALLATION OF PLYWOOD FENCE, AS PER DRAWINGS. PLYWOOD FENCE SHALL COMPLY WITH CHAPTER #33 OF THE 2008 CODE. NO CHAN... | $0 | YORK SCAFFOLD EQUIPMENT CORP. |
| Mar 24, 2022 | 123721071 | Alteration Type II | SIGNED OFF | SELECTIVE DEMOLITION OF REMAINING CMU WALL, MASONRY WALL, AND DECK AS PER PLANS FILED HEREWITH. | $175,000 | HFZ KIK 30TH STREET LLC |
| Feb 16, 2022 | 140840516 | Alteration Type II | SIGNED OFF | FILING FOR STEAM AND WATER CONNECTIONS FOR TEMPORARY BOILERS TO BUILDING HEATING SYSTEM. NO CHANGE IN USE, EGRESS OR ... | $10,000 | MINISTER, ELDERS, DEACONS OF THE |
| Dec 3, 2020 | 140986388 | Alteration Type II | APPLICATION PROCESSED - ENTIRE | DEMOLITION OF EXISTING INTERIOR MASONRY WALL. SLAB ON METAL DECK INFILL WITH STRUCTURAL STEEL. WELD SPLICING OF EXIST... | $328,240 | COLLEGIATE CHURCH OF NY |
| Aug 26, 2020 | 121713814 | Alteration Type II | SIGNED OFF | FOUNDATION WORK IN CONJUNCTION WITH DOB APPLICATION #121105455 FOR THE RENOVATION AND REMOVAL OF AN EXISTING PORTICO ... | $88,000 | COLLEGIATE CHURCH CORP. |
| Dec 4, 2019 | 121105455 | Alteration Type II | SIGNED OFF | FACADE RESTORATION, STAINED GLASS WINDOW REPAIR, AND REMOVAL OF AN EXISTING PORTICO ON AN EXISTING RELIGIOUS STRUCTUR... | $1,100,000 | COLLEGIATE CHURCH CORP. |
| Feb 12, 2019 | 122051643 | Alteration Type II | SIGNED OFF | MODIFICATION OF AN EXISTING GROUP A-2 (ASSEMBLY CABARET), SSC/SPK/EVAC/COC FIR E ALARM SYSTEM IN AN EXISTING RELIGIOU... | $24,000 | COLLEGIATE CHURCH CORP. |
| Jan 3, 2019 | 122017263 | Alteration Type II | SIGNED OFF | STRUCTURAL WORK IN CONJUNCTION WITH THE RENOVATION OF THE EXISTING ORGAN CHAMBER AND INFRASTRUCTURE IN AN EXISTING PL... | $90,000 | COLLEGIATE CHURCH CORP. |
| Aug 15, 2017 | 121012420 | Alteration Type II | SIGNED OFF | STRUCTURAL WORK IN CONJUNCTION WITH THE RENOVATION OF AN EXISTING RELIGIOUS STRUCTURE. NO CHANGE OF USE, OCCUPANCY, O... | $65,000 | COLLEGIATE CHURCH CORP. |
| Jul 15, 2015 | 121615252 | Alteration Type III | SIGNED OFF | INSTALLATION OF 15 LINEAR FEET OF HEAVY DUTY SIDEWALK SHED FOR BUILDING ALTERATION, FILED SEPARATELY. LIVE LOAD 300 P... | $0 | YORK SCAFFOLD EQUIPMENT CORP. |
| Jan 15, 2015 | 121124728 | Alteration Type I | PLAN EXAM - DISAPPROVED | ENLARGEMENT OF AN EXISTING RELIGIOUS STRUCTURE WITH THE CONSTRUCTION OF A NEW PROMENADE ON THE 1ST FLOOR. ARCHITECTUR... | $2,500,000 | COLLEGIATE CHURCH CORP |
| Sep 22, 2014 | 120489355 | Alteration Type II | SIGNED OFF | TEMPORARY SHORING OF EXISTING BALCONIES BETWEEN 1ST AND 2ND FLOORS. NO CHANGE OF USE, OCCUPANCY OR EGRESS. | $200,000 | COLLEGIATE CHURCH CORP. |
| Jan 23, 2014 | 120489346 | Alteration Type II | SIGNED OFF | INSTALLATION OF A NEW SPRINKLER SYSTEM IN EXISTING RELIGIOUS STRUCTURE ON THE CELLAR, 1ST, 2ND AND 3RD FLOOR. NO CHAN... | $591,000 | COLLEGIATE CHURCH CORP. |
| Apr 29, 2013 | 120489916 | Alteration Type II | SIGNED OFF | INSTALLATION OF A NEW MANUAL AND AUTOMATIC SMOKE/HEAT DETECTION AND SPRINKLER ALARM SYSTEM ON EXISTING RELIGIOUS STRU... | $90,000 | COLLEGIATE CHURCH CORP. |
| Aug 17, 2012 | 120346223 | Place of Assembly | COMPLETED | — | $0 | COLLEGIATE CHURCH CORP |
| Jun 1, 2012 | 120837443 | Alteration Type III | SIGNED OFF | INSTALLATION OF A HEAVY DUTY SIDEWALK SHED 60' LONG AS PER PLANS DURING RENOVATION OF AN EXISTING RELIGIOUS STRUCTURE... | $0 | COLLEGATE CHURCH CORP. |
| May 17, 2012 | 120689585 | Alteration Type II | SIGNED OFF | INSTALLATION OF A TEMPORARY SHORING SYSTEM AS PER PLANS DURING RENOVATION OF AN EXISTING RELIGIOUS STRUCTURE.NO CHANG... | $33,000 | ALL SAFE, LLC |
| Apr 11, 2012 | 120558119 | Alteration Type III | SIGNED OFF | INSTALLATION OF A SCAFFOLD WITH ACCESS STAIR TOWER AND LANDING PLATFORM AS PER PLANS DURING EXTERIOR RENOVATION. NO C... | $0 | COLLEGATE CHURCH CORP. |
| Apr 6, 2012 | 120555719 | Alteration Type III | SIGNED OFF | INSTALLATION OF A HEAVY DUTY SIDEWALK SHED APPROXIMATELY 112' LONG AS PER PLANS DURING EXTERIOR RENOVATION NO CHANGE ... | $0 | COLLEGATE CHURCH CORP. |
| Apr 4, 2012 | 120957964 | Alteration Type III | SIGNED OFF | INSTALLATION OF A SCAFFOLD APPROXIMATELY 52' FOR CHIMNEY ACCESS HIGH AS PER PLANS DURING RENOVATION OF AN EXISTING RE... | $0 | COLLEGATE CHURCH CORP. |
| Apr 4, 2012 | 120635367 | Alteration Type III | SIGNED OFF | INSTALLATION OF A INTERIOR TEMPORARY ACCESS PLATFORMS AS PER PLANS DURING RENOVATION OF AN EXISTING RELIGIOUS STRUCTU... | $0 | COLLEGATE CHURCH CORP. |
| Apr 4, 2012 | 120721576 | Alteration Type III | SIGNED OFF | INSTALLATION OF A ROOF PROTECTION AS PER PLANS DURING RENOVATION OF AN EXISTING RELIGIOUS STRUCTURE.NO CHANGE IN USE,... | $0 | COLLEGATE CHURCH CORP. |
| Mar 29, 2012 | 120950952 | Alteration Type III | PLAN EXAM - APPROVED | FIRE PROTECTION PLAN | $100 | COLLEGIATE CHURCH CORP |
| Jun 7, 2007 | 104528977 | Place of Assembly | COMPLETED | MARBLE COLLEGIATE CHURCH | $0 | COLLEGIAATE CHURCH COPR |
| Jun 25, 2003 | 103194151 | Alteration Type II | SIGNED OFF | REMOVE BEARING WALL AND PROVIDE STEEL SUPPORTS. POUR NEW SLABS ON GRADE. | $35,112 | MARBLE COLLEGIATE CHURCH |