Job filings
3-9 West 34 Street, Manhattan • Block 00836 • Lot 0026
187 records
Work filed with the Department of Buildings under its legacy BIS system.
| Latest action | Job | Type | Status | Work | Cost | Owner |
|---|---|---|---|---|---|---|
| Apr 17, 2025 | 122998408 | Alteration Type II | SIGNED OFF | REPLACE AND RELOCATE FIRE HOSE CABINETS ON PART OF THE CELLAR AND 1ST FLOOR, REMOVAL OF FIRE HOSE CABINET ON THE 2ND ... | $8,000 | VORNADO |
| Jul 12, 2023 | 123576870 | Alteration Type II | SIGNED OFF | MODIFICATIONS TO EXISTING FIRE ALARM SYSTEM | $7,000 | VORNADO OFFICE MANAGEMENT |
| Jun 1, 2023 | 123007183 | Alteration Type II | SIGNED OFF | ADDITIONS/MODIFICATIONS TO THE FIRE ALARM SYSTEM ON THE 5TH AND 6TH FLOOR (AMAZON-PHASE 5C) AS INDICATED ON DRAWINGS. | $100,000 | VORNADO OFFICE MANAGEMENT |
| Oct 19, 2022 | 123101650 | Alteration Type II | SIGNED OFF | REMOVAL OF AN EXISTING APPROVED SMOKE DETECTION FIRE ALARM SUB-SYSTEM FILED UNDER APPLICATION #103695967 DUE TO DEMO/... | $6,000 | VORNADO OFFICE MANAGEMENT |
| Apr 21, 2022 | 123210881 | Alteration Type II | SIGNED OFF | MECHANICAL AND PLUMBING WORK ON PART OF THE CELLAR AND 1ST FLOOR (AMAZON-PHASE 7) AS INDICATED ON DRAWINGS. NO CHANGE... | $156,250 | VORNADO OFFICE MANAGEMENT |
| Apr 12, 2022 | 123712839 | Alteration Type II | SIGNED OFF | MINOR CONSTRUCTION WORK ON THE 1ST FLOOR (AMAZON BOOKS) AS INDICATED ON DRAWINGS. NO CHANGE IN USE EGRESS OR OCCUPANCY. | $177,348 | VORNADO OFFICE MANAGEMENT |
| Apr 5, 2022 | 122970945 | Alteration Type II | SIGNED OFF | MECHANICAL WORK ON THE SUB-CELLAR, CELLAR, 1ST AND 2ND FLOOR; PLUMBING WORK ON THE SUB-CELLAR, CELLAR AND 1ST FLOOR (... | $990,000 | VORNADO OFFICE MANAGEMENT |
| Jan 26, 2022 | 120731039 | Alteration Type II | SIGNED OFF | REPLACEMENT OF EXISTING AIR CONDITIONING UNIT AND DUCTWORK ON PART OF 1ST FLOOR, DUCTWORK AND PLUMBING FIXTURES ON PA... | $210,000 | VORNADO |
| Nov 4, 2021 | 123806202 | Alteration Type II | SIGNED OFF | MODIFICATION OF THE BUILDING CLASS E FIRE ALARM SYSTEM TO SUPERVISE THE NEWLY INSTALLED SPRINKLER DRY PIPE SYSETM ON ... | $4,983 | VORNADO OFFICE MANAGEMENT |
| Nov 4, 2021 | 123452815 | Alteration Type II | SIGNED OFF | MANUAL & AUTOMATIC SMOKE DETECTION/SPRINKLER ALARM SYSTEM WITH CENTRAL OFFICE CONNECTION FOR THE LINDT & SPRU... | $48,000 | VORNADO OFFICE MANAGEMENT |
| Jul 22, 2021 | 123817012 | Alteration Type II | SIGNED OFF | HEREWITH FILING FOR INTERIOR RENOVATION OF TENANT SPACE. ALL OTHER TRADES TO BE FILED THOUGH DOB NOW BUILD | $1,827,793 | 7 WEST 34TH STREET OWNER LLC |
| Mar 31, 2021 | 123769207 | Alteration Type II | SIGNED OFF | #8338 - MINOR MILLWORK, FINISH AND FLOORING MODIFICATIONS TO LINDT RETAIL SPACE TO ADD A "BARK BAR". NO CHANGE IN EGR... | $100,000 | 7 W 34TH ST OWNER LLC CO VERNADO |
| Jan 6, 2021 | 123694261 | Alteration Type II | SIGNED OFF | INTERIOR RENOVATION AS SHOWN ON PLANS, NO CHANGE TO USE, EGRESS OR OCCUPANCY. RELATED APPLICATION M00243392 FILED WIT... | $675,000 | VORNADO OFFICE MANAGEMENT |
| Jan 5, 2021 | 123864292 | Alteration Type III | SIGNED OFF | NO WORK APPLICATION FILED FOR OCCUPANCY PROTECTION PLAN. | $1,000 | VORNADO REALTY TRUST |
| Oct 8, 2020 | 123522456 | Alteration Type II | SIGNED OFF | ADDITIONS/MODIFICATIONS TO THE FIRE ALARM SYSTEM "WHITEBOX" RETAIL SPACE ON THE CELLAR, 1ST AND 2ND FLOORS AS INDICAT... | $6,000 | VORNADO OFFICE MANAGEMENT |
| Sep 2, 2020 | 123898229 | Alteration Type II | SIGNED OFF | ARCHITECTURAL WORK ON THE 1ST FLOOR (WHITBOX3, INSTALL RAMP AT THE NEW STOREFR ONT AND ENTRANCE AS INDICATED ON DRAWI... | $217,650 | VORNADO OFFICE MANAGEMENT |
| Dec 27, 2019 | 123560306 | Alteration Type II | SIGNED OFF | SPRINKLER WORK TO "WHITEBOX" RETAIL SPACES ON PART OF THE 1ST FLOOR AS INDICATED ON DRAWINGS. | $7,800 | VORNADO OFFICE MANAGEMENT |
| Dec 2, 2019 | 123544263 | Alteration Type II | SIGNED OFF | MODIFICATION TO EXISTING HVAC SYSTEM AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUAPANCY. | $45,000 | VORNADO REALTY TRUST |
| Nov 6, 2019 | 123515730 | Alteration Type II | SIGNED OFF | STRUCTURAL RENOVATIONS FOR INTERIOR SPACE AS INDICATED ON PLANS FILED HEREWITH. NO CHANGE IN EGRESS, USE, OR OCCUPANCY. | $85,000 | VORNADO REALTY TRUST |
| Sep 30, 2019 | 123498474 | Alteration Type II | SIGNED OFF | MANUAL & AUTOMATIC SMOKE DETECTION / SPRINKLER ALARM SYSTEM WITH CENTRAL OFFICE CONNECTION FOR THE NATURALIZER TE... | $35,000 | VORNADO OFFICE MANAGEMENT |
| Jul 30, 2019 | 123584852 | Alteration Type II | SIGNED OFF | SPRINKLER WORK ON THE CELLAR AND 1ST FLOOR (AMAZON-PHASE 7) AS INDICATED ON DRAWINGS. NO CHANGE IN USE EGRESS OR OCCU... | $12,000 | VORNADO OFFICE MANAGEMENT |
| Jul 30, 2019 | 123294247 | Alteration Type II | SIGNED OFF | REPLACE ONE (1) HOSE CABINET/VALVE EACH ON THE 5TH AND 6TH FLOOR (AMAZON PHASE 5C) AS INDICATED ON DRAWINGS . | $14,000 | VORNADO OFFICE MANAGEMENT |
| Jul 30, 2019 | 123103480 | Alteration Type II | SIGNED OFF | ARCHITECTURAL WORK ON THE 5TH AND 6TH FLOOR (AMAZON-PHASE 5C) AS INDICATED ON DRAWINGS. NO CHANGE IN USE EGRESS OR OC... | $3,200,000 | VORNADO OFFICE MANAGEMENT |
| Jul 30, 2019 | 123294238 | Alteration Type II | SIGNED OFF | SPRINKLER WORK ON THE 5TH AND 6TH FLOOR (AMAZON-PHASE 5C) AS INDICATED ON DRAWINGS. | $250,000 | VORNADO OFFICE MANAGEMENT |
| Jul 25, 2019 | 123406215 | Alteration Type II | SIGNED OFF | INSTALLATION OF A SPRINKLER SYSTEM ON THE FIRST FLOOR AT NATURALIZER STORE AS PER PLANS SUBMITTED HEREWITH, NO CHANGE... | $25,200 | VORNADO OFFICE MANAGEMENT |
| Jul 19, 2019 | 123406199 | Alteration Type II | SIGNED OFF | MODIFICATIONS OF AN EXISTING SPRINKLER SYSTEM ON 1ST FL LEVEL AS PER PLANS SUBMITTED HEREWITH, NO CHANGE IN USE, EGRE... | $9,000 | VORNADO OFFICE MANAGEMENT |
| Jul 1, 2019 | 123560805 | Alteration Type II | SIGNED OFF | MECHANICAL WORK ON PART OF THE 1ST FLOOR (NATURALIZER) AS INDICATED ON DRAWINGS. NO CHANGE IN USE EGRESS OR OCCUPANCY. | $81,000 | VORNADO OFFICE MANAGEMENT |
| Mar 7, 2019 | 123024075 | Alteration Type II | SIGNED OFF | MODIFICATION TO AN EXISTING CLASS E FIRE ALARM SYSTEM | $20,000 | VORNADO OFFICE MANAGEMENT |
| Nov 21, 2018 | 123488207 | Alteration Type II | SIGNED OFF | MECHANICAL WORK TO "WHITEBOX" RETAIL SPACES ON PART OF THE 1ST FLOOR AS INDICATED ON DRAWINGS. | $15,900 | VORNADO OFFICE MANAGEMENT |
| Jul 11, 2018 | 122937956 | Alteration Type II | SIGNED OFF | INSTALLATION OF A TEMPORARY SPRINKLER LOOP SYSTEM ON THE FIRST FLOOR AT AMAZON BOOK STORE AS PER PLANS SUBMITTED HERE... | $7,200 | VORNADO OFFICE MANAGEMENT |
| Apr 23, 2018 | 121238892 | Alteration Type II | SIGNED OFF | RELOCATION OF FIRE HOSE CABINET AND VALVE ON THE 1ST FLOOR AS INDICATED ON DRAWINGS. | $26,000 | VORNADO OFFICE MANAGEMENT |
| Apr 23, 2018 | 123048175 | Alteration Type II | SIGNED OFF | SPRINKLER CHANGES TO RETAIL SPACE (AMAZON BOOKS) ON PART OF THE 1ST FLOOR AS INDICATED ON DRAWINGS. NO CHANGE IN USE ... | $35,000 | VORNADO OFFICE MANAGEMENT |
| Feb 6, 2018 | 123002758 | Alteration Type II | SIGNED OFF | ADDITIONS/MODIFICATIONS TO THE FIRE ALARM SYSTEM ON THE SUB-CELLAR, CELLAR, 1ST AND 2ND FLOOR (AMAZON-PHASE 6B) AS IN... | $90,000 | VORNADO OFFICE MANAGEMENT |
| Jan 23, 2018 | 122855678 | Alteration Type II | SIGNED OFF | MECHANICAL AND PLUMBING WORK TO CREATE SHAFT FOR NEW ELEVATOR FROM SUBCELLAR TO 2ND FLOOR AS INDICATED ON DRAWINGS. N... | $145,000 | VORNADO OFFICE MANAGEMENT |
| Oct 25, 2017 | 123037052 | Alteration Type III | SIGNED OFF | INSTALLATION OF STEEL PIPE SCAFFOLDING INSTALLATION IN SHAFTWAY AS PER PLANS. SCAFFOLD TO COMPLY WITH NYC BC 2014. NO... | $0 | VORNADO OFFICE MANAGEMENT |
| Oct 16, 2017 | 123048166 | Alteration Type II | SIGNED OFF | MECHANICAL AND PLUMBING CHANGES TO RETAIL SPACE (AMAZON BOOKS)ON PART OF THE 1ST FLOOR AS INDICATED ON DRAWINGS. NO C... | $119,000 | VORNADO OFFICE MANAGEMENT |
| Sep 25, 2017 | 122998417 | Alteration Type II | SIGNED OFF | INSTALLATION OF TEMPORARY SPRINKLER LOOP ON PART OF THE SUB-CELLAR, CELLAR, AND 1ST FLOOR; SPRINKLER WORK ON PART OF ... | $260,000 | VORNADO OFFICE MANAGEMENT |
| Sep 21, 2017 | 122776219 | Alteration Type II | SIGNED OFF | ADDITIONS/MODIFICATIONS TO THE FIRE ALARM SYSTEM ON THE SC, 3RD, 10TH, 11TH, AND 12TH FLOORS (AMAZON-PHAZE 4B) AS IND... | $100,000 | VORNADO OFFICE MANAGEMENT |
| Sep 21, 2017 | 122898178 | Alteration Type II | SIGNED OFF | ARCHITECTURAL WORK ON THE 3RD AND 4TH FLOOR (AMAZON - PHASE 5B) AS INDICATED ON DRAWINGS. NO CHANGE IN USE EGRESS OR ... | $1,900,000 | VORNADO OFFICE MANAGEMENT |
| Aug 21, 2017 | 122870624 | Alteration Type II | SIGNED OFF | ADDITIONS/MODIFICATIONS TO THE FIRE ALARM SYSTEM ON THE 3RD,4TH,7TH,8TH AND 9TH FLOORS ( AMAZON-PHASE 5B)AS INDICATED... | $480,000 | VORNADO OFFICE MANAGEMENT |
| Aug 18, 2017 | 122870615 | Alteration Type II | SIGNED OFF | INSTALLATION OF AUTOMATIC SMOKE DETECTION FIRE ALARM SYSTEM FOR PRE-ACTION SYSTEM. | $25,000 | VORNADO OFFICE MANAGEMENT |
| Aug 1, 2017 | 122920492 | Alteration Type II | SIGNED OFF | SPRINKLER WORK ON THE SUBCELLAR LEVEL ELEVATOR PIT (AMAZON-PHASE 6)AND 1ST FLOOR SPRINKLER REMOVALS AS INDICATED ON D... | $5,000 | VORNADO OFFICE MANAGEMENT |
| Jul 18, 2017 | 122963365 | Alteration Type II | SIGNED OFF | SPRINKLER WORK ON THE 3RD AND 4TH FLOOR (AMAZON-PHASE 5B) AS INDICATED ON DRAWINGS. NO CHANGE IN USE EGRESS OR OCCUPA... | $430,000 | VORNADO OFFICE MANAGEMENT |
| Jul 17, 2017 | 140547068 | Alteration Type II | SIGNED OFF | LOCALIZED STEEL GIRDER REINFORCEMENT AND SLAB REPLACEMENT AT CONCOURSE LEVEL. NO CHANGE IN USE, OCCUPANCY OR EGRESS | $35,000 | VORNADO OFFICE MANAGEMENT |
| Jul 12, 2017 | 122964499 | Alteration Type II | SIGNED OFF | REPLACEMENT OF FIRE HOSE CABINETS ON THE 3RD AND 4TH FLOOR (AMAZON-PHASE 5B) AS INDICATED ON DRAWINGS. | $5,000 | VORNADO OFFICE MANAGEMENT |
| Jul 6, 2017 | 122920483 | Alteration Type II | SIGNED OFF | REMOVAL AND INSTALLATION OF SPRINKLER HEADS IN CORE TOILETS ON THE 3RD AND 4TH FLOOR; TEMPORARY SPRINKLER LOOP ON THE... | $65,000 | VORNADO OFFICE MANAGEMENT |
| Jun 29, 2017 | 122743834 | Alteration Type II | SIGNED OFF | STRUCTURAL WORK ON THE SUB-CELLAR, 3RD, 10TH, 11TH, 12TH, ROOF AND RELATED WORK ON THE CELLAR AND 1ST THRU 6TH FLOORS... | $350,000 | VORNADO OFFICE MANAGEMENT |
| Jun 29, 2017 | 122865694 | Alteration Type II | SIGNED OFF | MECHANICAL AND PLUMBING WORK TO RENOVATE AND EXPAND CORE TOILETS FACILITIES ON THE 3RD AND 4TH FLOOR (PHASE 5) AS IND... | $335,000 | VORNADO OFFICE MANAGEMENT |
| May 2, 2017 | 122551853 | Alteration Type II | SIGNED OFF | ADDITIONS/MODIFICATIONS TO THE FIRE ALARM SYSTEM ON THE 7TH THROUGH 10TH FLOOR (AMAZON PHASE 3) AS INDICATED ON DRAWI... | $400,000 | VORNADO OFFICE MANAGEMENT |
| May 2, 2017 | 122021070 | Alteration Type II | SIGNED OFF | REPLACEMENT OF DGP PANELS AND CORRESPONDING PERIPHIAL AND ADDITION/MODIFICATIO NS TO EXISTING CLASS E FIRE ALARM SYST... | $195,000 | VORNADO OFFICE MANAGEMENT, LLC |