3-9 West 34 Street, Manhattan • Block 00836 • Lot 0026

187 records

Work filed with the Department of Buildings under its legacy BIS system.

Latest action Job Type Status Work Cost Owner
Apr 17, 2025 122998408 Alteration Type II SIGNED OFF REPLACE AND RELOCATE FIRE HOSE CABINETS ON PART OF THE CELLAR AND 1ST FLOOR, REMOVAL OF FIRE HOSE CABINET ON THE 2ND ... $8,000 VORNADO
Jul 12, 2023 123576870 Alteration Type II SIGNED OFF MODIFICATIONS TO EXISTING FIRE ALARM SYSTEM $7,000 VORNADO OFFICE MANAGEMENT
Jun 1, 2023 123007183 Alteration Type II SIGNED OFF ADDITIONS/MODIFICATIONS TO THE FIRE ALARM SYSTEM ON THE 5TH AND 6TH FLOOR (AMAZON-PHASE 5C) AS INDICATED ON DRAWINGS. $100,000 VORNADO OFFICE MANAGEMENT
Oct 19, 2022 123101650 Alteration Type II SIGNED OFF REMOVAL OF AN EXISTING APPROVED SMOKE DETECTION FIRE ALARM SUB-SYSTEM FILED UNDER APPLICATION #103695967 DUE TO DEMO/... $6,000 VORNADO OFFICE MANAGEMENT
Apr 21, 2022 123210881 Alteration Type II SIGNED OFF MECHANICAL AND PLUMBING WORK ON PART OF THE CELLAR AND 1ST FLOOR (AMAZON-PHASE 7) AS INDICATED ON DRAWINGS. NO CHANGE... $156,250 VORNADO OFFICE MANAGEMENT
Apr 12, 2022 123712839 Alteration Type II SIGNED OFF MINOR CONSTRUCTION WORK ON THE 1ST FLOOR (AMAZON BOOKS) AS INDICATED ON DRAWINGS. NO CHANGE IN USE EGRESS OR OCCUPANCY. $177,348 VORNADO OFFICE MANAGEMENT
Apr 5, 2022 122970945 Alteration Type II SIGNED OFF MECHANICAL WORK ON THE SUB-CELLAR, CELLAR, 1ST AND 2ND FLOOR; PLUMBING WORK ON THE SUB-CELLAR, CELLAR AND 1ST FLOOR (... $990,000 VORNADO OFFICE MANAGEMENT
Jan 26, 2022 120731039 Alteration Type II SIGNED OFF REPLACEMENT OF EXISTING AIR CONDITIONING UNIT AND DUCTWORK ON PART OF 1ST FLOOR, DUCTWORK AND PLUMBING FIXTURES ON PA... $210,000 VORNADO
Nov 4, 2021 123806202 Alteration Type II SIGNED OFF MODIFICATION OF THE BUILDING CLASS E FIRE ALARM SYSTEM TO SUPERVISE THE NEWLY INSTALLED SPRINKLER DRY PIPE SYSETM ON ... $4,983 VORNADO OFFICE MANAGEMENT
Nov 4, 2021 123452815 Alteration Type II SIGNED OFF MANUAL & AUTOMATIC SMOKE DETECTION/SPRINKLER ALARM SYSTEM WITH CENTRAL OFFICE CONNECTION FOR THE LINDT & SPRU... $48,000 VORNADO OFFICE MANAGEMENT
Jul 22, 2021 123817012 Alteration Type II SIGNED OFF HEREWITH FILING FOR INTERIOR RENOVATION OF TENANT SPACE. ALL OTHER TRADES TO BE FILED THOUGH DOB NOW BUILD $1,827,793 7 WEST 34TH STREET OWNER LLC
Mar 31, 2021 123769207 Alteration Type II SIGNED OFF #8338 - MINOR MILLWORK, FINISH AND FLOORING MODIFICATIONS TO LINDT RETAIL SPACE TO ADD A "BARK BAR". NO CHANGE IN EGR... $100,000 7 W 34TH ST OWNER LLC CO VERNADO
Jan 6, 2021 123694261 Alteration Type II SIGNED OFF INTERIOR RENOVATION AS SHOWN ON PLANS, NO CHANGE TO USE, EGRESS OR OCCUPANCY. RELATED APPLICATION M00243392 FILED WIT... $675,000 VORNADO OFFICE MANAGEMENT
Jan 5, 2021 123864292 Alteration Type III SIGNED OFF NO WORK APPLICATION FILED FOR OCCUPANCY PROTECTION PLAN. $1,000 VORNADO REALTY TRUST
Oct 8, 2020 123522456 Alteration Type II SIGNED OFF ADDITIONS/MODIFICATIONS TO THE FIRE ALARM SYSTEM "WHITEBOX" RETAIL SPACE ON THE CELLAR, 1ST AND 2ND FLOORS AS INDICAT... $6,000 VORNADO OFFICE MANAGEMENT
Sep 2, 2020 123898229 Alteration Type II SIGNED OFF ARCHITECTURAL WORK ON THE 1ST FLOOR (WHITBOX3, INSTALL RAMP AT THE NEW STOREFR ONT AND ENTRANCE AS INDICATED ON DRAWI... $217,650 VORNADO OFFICE MANAGEMENT
Dec 27, 2019 123560306 Alteration Type II SIGNED OFF SPRINKLER WORK TO "WHITEBOX" RETAIL SPACES ON PART OF THE 1ST FLOOR AS INDICATED ON DRAWINGS. $7,800 VORNADO OFFICE MANAGEMENT
Dec 2, 2019 123544263 Alteration Type II SIGNED OFF MODIFICATION TO EXISTING HVAC SYSTEM AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUAPANCY. $45,000 VORNADO REALTY TRUST
Nov 6, 2019 123515730 Alteration Type II SIGNED OFF STRUCTURAL RENOVATIONS FOR INTERIOR SPACE AS INDICATED ON PLANS FILED HEREWITH. NO CHANGE IN EGRESS, USE, OR OCCUPANCY. $85,000 VORNADO REALTY TRUST
Sep 30, 2019 123498474 Alteration Type II SIGNED OFF MANUAL & AUTOMATIC SMOKE DETECTION / SPRINKLER ALARM SYSTEM WITH CENTRAL OFFICE CONNECTION FOR THE NATURALIZER TE... $35,000 VORNADO OFFICE MANAGEMENT
Jul 30, 2019 123584852 Alteration Type II SIGNED OFF SPRINKLER WORK ON THE CELLAR AND 1ST FLOOR (AMAZON-PHASE 7) AS INDICATED ON DRAWINGS. NO CHANGE IN USE EGRESS OR OCCU... $12,000 VORNADO OFFICE MANAGEMENT
Jul 30, 2019 123294247 Alteration Type II SIGNED OFF REPLACE ONE (1) HOSE CABINET/VALVE EACH ON THE 5TH AND 6TH FLOOR (AMAZON PHASE 5C) AS INDICATED ON DRAWINGS . $14,000 VORNADO OFFICE MANAGEMENT
Jul 30, 2019 123103480 Alteration Type II SIGNED OFF ARCHITECTURAL WORK ON THE 5TH AND 6TH FLOOR (AMAZON-PHASE 5C) AS INDICATED ON DRAWINGS. NO CHANGE IN USE EGRESS OR OC... $3,200,000 VORNADO OFFICE MANAGEMENT
Jul 30, 2019 123294238 Alteration Type II SIGNED OFF SPRINKLER WORK ON THE 5TH AND 6TH FLOOR (AMAZON-PHASE 5C) AS INDICATED ON DRAWINGS. $250,000 VORNADO OFFICE MANAGEMENT
Jul 25, 2019 123406215 Alteration Type II SIGNED OFF INSTALLATION OF A SPRINKLER SYSTEM ON THE FIRST FLOOR AT NATURALIZER STORE AS PER PLANS SUBMITTED HEREWITH, NO CHANGE... $25,200 VORNADO OFFICE MANAGEMENT
Jul 19, 2019 123406199 Alteration Type II SIGNED OFF MODIFICATIONS OF AN EXISTING SPRINKLER SYSTEM ON 1ST FL LEVEL AS PER PLANS SUBMITTED HEREWITH, NO CHANGE IN USE, EGRE... $9,000 VORNADO OFFICE MANAGEMENT
Jul 1, 2019 123560805 Alteration Type II SIGNED OFF MECHANICAL WORK ON PART OF THE 1ST FLOOR (NATURALIZER) AS INDICATED ON DRAWINGS. NO CHANGE IN USE EGRESS OR OCCUPANCY. $81,000 VORNADO OFFICE MANAGEMENT
Mar 7, 2019 123024075 Alteration Type II SIGNED OFF MODIFICATION TO AN EXISTING CLASS E FIRE ALARM SYSTEM $20,000 VORNADO OFFICE MANAGEMENT
Nov 21, 2018 123488207 Alteration Type II SIGNED OFF MECHANICAL WORK TO "WHITEBOX" RETAIL SPACES ON PART OF THE 1ST FLOOR AS INDICATED ON DRAWINGS. $15,900 VORNADO OFFICE MANAGEMENT
Jul 11, 2018 122937956 Alteration Type II SIGNED OFF INSTALLATION OF A TEMPORARY SPRINKLER LOOP SYSTEM ON THE FIRST FLOOR AT AMAZON BOOK STORE AS PER PLANS SUBMITTED HERE... $7,200 VORNADO OFFICE MANAGEMENT
Apr 23, 2018 121238892 Alteration Type II SIGNED OFF RELOCATION OF FIRE HOSE CABINET AND VALVE ON THE 1ST FLOOR AS INDICATED ON DRAWINGS. $26,000 VORNADO OFFICE MANAGEMENT
Apr 23, 2018 123048175 Alteration Type II SIGNED OFF SPRINKLER CHANGES TO RETAIL SPACE (AMAZON BOOKS) ON PART OF THE 1ST FLOOR AS INDICATED ON DRAWINGS. NO CHANGE IN USE ... $35,000 VORNADO OFFICE MANAGEMENT
Feb 6, 2018 123002758 Alteration Type II SIGNED OFF ADDITIONS/MODIFICATIONS TO THE FIRE ALARM SYSTEM ON THE SUB-CELLAR, CELLAR, 1ST AND 2ND FLOOR (AMAZON-PHASE 6B) AS IN... $90,000 VORNADO OFFICE MANAGEMENT
Jan 23, 2018 122855678 Alteration Type II SIGNED OFF MECHANICAL AND PLUMBING WORK TO CREATE SHAFT FOR NEW ELEVATOR FROM SUBCELLAR TO 2ND FLOOR AS INDICATED ON DRAWINGS. N... $145,000 VORNADO OFFICE MANAGEMENT
Oct 25, 2017 123037052 Alteration Type III SIGNED OFF INSTALLATION OF STEEL PIPE SCAFFOLDING INSTALLATION IN SHAFTWAY AS PER PLANS. SCAFFOLD TO COMPLY WITH NYC BC 2014. NO... $0 VORNADO OFFICE MANAGEMENT
Oct 16, 2017 123048166 Alteration Type II SIGNED OFF MECHANICAL AND PLUMBING CHANGES TO RETAIL SPACE (AMAZON BOOKS)ON PART OF THE 1ST FLOOR AS INDICATED ON DRAWINGS. NO C... $119,000 VORNADO OFFICE MANAGEMENT
Sep 25, 2017 122998417 Alteration Type II SIGNED OFF INSTALLATION OF TEMPORARY SPRINKLER LOOP ON PART OF THE SUB-CELLAR, CELLAR, AND 1ST FLOOR; SPRINKLER WORK ON PART OF ... $260,000 VORNADO OFFICE MANAGEMENT
Sep 21, 2017 122776219 Alteration Type II SIGNED OFF ADDITIONS/MODIFICATIONS TO THE FIRE ALARM SYSTEM ON THE SC, 3RD, 10TH, 11TH, AND 12TH FLOORS (AMAZON-PHAZE 4B) AS IND... $100,000 VORNADO OFFICE MANAGEMENT
Sep 21, 2017 122898178 Alteration Type II SIGNED OFF ARCHITECTURAL WORK ON THE 3RD AND 4TH FLOOR (AMAZON - PHASE 5B) AS INDICATED ON DRAWINGS. NO CHANGE IN USE EGRESS OR ... $1,900,000 VORNADO OFFICE MANAGEMENT
Aug 21, 2017 122870624 Alteration Type II SIGNED OFF ADDITIONS/MODIFICATIONS TO THE FIRE ALARM SYSTEM ON THE 3RD,4TH,7TH,8TH AND 9TH FLOORS ( AMAZON-PHASE 5B)AS INDICATED... $480,000 VORNADO OFFICE MANAGEMENT
Aug 18, 2017 122870615 Alteration Type II SIGNED OFF INSTALLATION OF AUTOMATIC SMOKE DETECTION FIRE ALARM SYSTEM FOR PRE-ACTION SYSTEM. $25,000 VORNADO OFFICE MANAGEMENT
Aug 1, 2017 122920492 Alteration Type II SIGNED OFF SPRINKLER WORK ON THE SUBCELLAR LEVEL ELEVATOR PIT (AMAZON-PHASE 6)AND 1ST FLOOR SPRINKLER REMOVALS AS INDICATED ON D... $5,000 VORNADO OFFICE MANAGEMENT
Jul 18, 2017 122963365 Alteration Type II SIGNED OFF SPRINKLER WORK ON THE 3RD AND 4TH FLOOR (AMAZON-PHASE 5B) AS INDICATED ON DRAWINGS. NO CHANGE IN USE EGRESS OR OCCUPA... $430,000 VORNADO OFFICE MANAGEMENT
Jul 17, 2017 140547068 Alteration Type II SIGNED OFF LOCALIZED STEEL GIRDER REINFORCEMENT AND SLAB REPLACEMENT AT CONCOURSE LEVEL. NO CHANGE IN USE, OCCUPANCY OR EGRESS $35,000 VORNADO OFFICE MANAGEMENT
Jul 12, 2017 122964499 Alteration Type II SIGNED OFF REPLACEMENT OF FIRE HOSE CABINETS ON THE 3RD AND 4TH FLOOR (AMAZON-PHASE 5B) AS INDICATED ON DRAWINGS. $5,000 VORNADO OFFICE MANAGEMENT
Jul 6, 2017 122920483 Alteration Type II SIGNED OFF REMOVAL AND INSTALLATION OF SPRINKLER HEADS IN CORE TOILETS ON THE 3RD AND 4TH FLOOR; TEMPORARY SPRINKLER LOOP ON THE... $65,000 VORNADO OFFICE MANAGEMENT
Jun 29, 2017 122743834 Alteration Type II SIGNED OFF STRUCTURAL WORK ON THE SUB-CELLAR, 3RD, 10TH, 11TH, 12TH, ROOF AND RELATED WORK ON THE CELLAR AND 1ST THRU 6TH FLOORS... $350,000 VORNADO OFFICE MANAGEMENT
Jun 29, 2017 122865694 Alteration Type II SIGNED OFF MECHANICAL AND PLUMBING WORK TO RENOVATE AND EXPAND CORE TOILETS FACILITIES ON THE 3RD AND 4TH FLOOR (PHASE 5) AS IND... $335,000 VORNADO OFFICE MANAGEMENT
May 2, 2017 122551853 Alteration Type II SIGNED OFF ADDITIONS/MODIFICATIONS TO THE FIRE ALARM SYSTEM ON THE 7TH THROUGH 10TH FLOOR (AMAZON PHASE 3) AS INDICATED ON DRAWI... $400,000 VORNADO OFFICE MANAGEMENT
May 2, 2017 122021070 Alteration Type II SIGNED OFF REPLACEMENT OF DGP PANELS AND CORRESPONDING PERIPHIAL AND ADDITION/MODIFICATIO NS TO EXISTING CLASS E FIRE ALARM SYST... $195,000 VORNADO OFFICE MANAGEMENT, LLC