113-117 5 Avenue, Manhattan
Manhattan • Block 00847 • Lot 0062 • Zip: 10003
Condition
What the city currently has open against this building, counted from its own records.
Address
Land use and zoning
Building
Latest assessment
Neighborhood
The area this lot falls inside, and the commute Hoodkit measures from it.
Getting around
Estimated 3 days ago- Penn Station 9 min 3 walking, 6 riding
- Times Square 10 min 3 walking, 7 riding
- Union Square 16 min 3 walking, 13 riding
- Grand Central 18 min 3 walking, 15 riding
- Fulton Street 18 min 3 walking, 15 riding
- Downtown Brooklyn 23 min 3 walking, 20 riding
Around this address
Transit and places within 0.5 miles of the lot.
Getting out
Subway
Railroad
Ferry
Bus
Citi Bike
Places nearby
Cote
Cote is a modern Korean Steakhouse in the heart of NYC, offering a unique dining experience with premium cuts of meat...
Cafe Carmellini
No description yet
Eleven Madison Park
No description yet
Clemente Bar
No description yet
La Tete d’Or
No description yet
Breads Bakery
No description yet
Old Town Bar
No description yet
Borgo
Experience the charm of Italy in the heart of NYC at Borgo. This cozy, rustic spot offers authentic Italian cuisine, ...
Activity
Sales, filings, permits and violations from every dataset, in one order.
2026
2025
-
DOB violation Nov 14, 2025
LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION
2024
-
DOB violation Sep 23, 2024
LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION
-
DOB violation May 2, 2024
BENCH-FAILURE TO BENCHMARK NONE
FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
2023
-
DOB violation Jun 20, 2023
LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION
2022
-
Alteration Type II
HEREBY FILING TO DEMOLISH AND CONSTRUCT INTERIOR PARTITIONS, DOORS AND CEILINGS, FOR THE MULTIPLAN INSURANCE RENOVATI...
-
Alteration Type II
INSTALL AND REMOVE INTERIOR PARTITIONS, CEILINGS, AND DOORS.
2021
-
DOB violation Aug 27, 2021
E-ELEVATOR ELEVATORREQUIRED
-
DOB violation Aug 27, 2021
E-ELEVATOR ELEVATORREQUIRED
-
Alteration Type II
MODIFICATIONS TO EXISTING FIRE ALARM SYSTEM AS PER PLANS FILED HEREWITH
-
CLASS - 2
SEC. 27-929.1 FAILURE TO COMPLETE THE INSTALLATION OF A FULL SYSTEM OFAUTOMATIC SPRINKLERS & FILE A FINAL SPRINKLER R...
-
Alteration Type II
MECHANICAL, PLUMBING AND SPRINKLER CHANGES AS INDICATED ON PLANS. NO CHANGES IN USE, OCCUPANCY OR EGRESS.
-
Alteration Type II
INSTALLATION OF A MANUAL, AUTOMATIC SMOKE DETECTION AND SPRINKLER FIRE ALARM SYSTEM AS PER PLANS SUBMITTED HEREWITH, ...
2020
-
Alteration Type II
INSTALLATION OF A MANUAL, AUTOMATIC SMOKE DETECTION AND SPRINKLER FIRE ALARM SYSTEM AT VICTORIA'S SECRET STORE AS PER...
-
CLASS - 2
27-929.1 A.C.27-929.1,FAILURE TO COMPLETE THE INSTALLATION OF A FULL SYSTEM OF AUTOMATIC SPRINKLERS AND FILE A FINAL ...
2019
-
CLASS - 2
A.C 27-929-1 FAILURE TO COMPLETE THE INSTALLATION OF A FULL SYSTEM OF AUTOMATIC SPRINKLERS AND FILE A FINAL SPRINKLER...
-
CLASS - 2
3301.2=HOLES/OPENING NOT COVERED.AT THE TIME OF MY INSPECTION TO RESPOND A COMPLAINT 7 STY BUILDING ALT WORK IN PROGR...
-
CLASS - 1
WORK AFTER HOURS WITHOUT VARIANCE PERMIT AT TH ETIME OF MY INSPECTION TO RESPOND A COMPLAINT OBSERVED APPROX 6 WORKER...
-
CLASS - 1
WORK AFTER HOURS WITHOUT A VARIANCE PERMIT.AT THE TIME OF MY INSPECTION TO RESPOND A COMPLAINT OBSERVED WORKER ON SUS...
2005
The most recent 6 events from each dataset, so no one source takes the axis. Each tab holds the full record.
Property Contacts
Contact information aggregated from multiple government sources
Building Permits
Owner information from Department of Buildings filings
Recent Building Permits
Owner information from recent DOB NOW filings
Deed Records
Parties from ACRIS deed and mortgage records
Property Records
Owner information from assessment and PLUTO records