Maintenance code violations
7-9 East 30 Street, Manhattan • Block 00860 • Lot 0008
9 records
HPD grades a violation A for non-hazardous through C for immediately hazardous.
| Issued | Class | Status | Violation | Apartment | Correct by |
|---|---|---|---|---|---|
| Feb 17, 2026 | C | VIOLATION DISMISSED | § 27-2029 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF HEAT FOR THE APARTMENT IN THE ENTIRE APARTMENT LOCATED AT APT 2A, 2n... | 2A | Feb 17, 2026 |
| Jan 23, 2026 | B | VIOLATION DISMISSED | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE HVAC SYSTEM AT EAST WALL IN THE 3rd ROOM FROM NORTH... | 2B | Feb 27, 2026 |
| Jan 23, 2026 | B | VIOLATION DISMISSED | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE HVAC SYSTEM AT EAST WALL IN THE 2nd ROOM FROM NORTH... | 2B | Feb 27, 2026 |
| Apr 2, 2024 | A | VIOLATION DISMISSED | § 329, M/D LAW AND DEPT. RULES AND REGS. PROVIDE A COMPLETED CERTIFICATE OF INSPECTION VISITS IN A PROPER FRAME AT OR... | — | Jul 6, 2024 |
| Apr 2, 2024 | C | VIOLATION DISMISSED | § 27-2033 ADM CODE POST NOTICE, IN FORM APPROVED BY THE DEPARTMENT, STATING THE NAME AND LOCATION OF THE PERSON DESIG... | — | Apr 8, 2024 |
| Apr 2, 2024 | C | VIOLATION DISMISSED | § 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 10B, 10th STORY... | 10B | Apr 2, 2024 |
| Apr 2, 2024 | C | VIOLATION DISMISSED | § 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM DOOR LOCKED AT CELLAR AT BOILER ROOM | — | Apr 8, 2024 |
| Apr 1, 2024 | C | VIOLATION DISMISSED | § 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 3A, 3rd STORY, ... | 3A | Apr 1, 2024 |
| Mar 31, 2023 | A | VIOLATION DISMISSED | (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION ... | — | Jul 4, 2023 |