132 East 20 Street, Manhattan • Block 00875 • Lot 0058
14 records
Work filed with the Department of Buildings under its legacy BIS system.
| Latest action | Job | Type | Status | Work | Cost | Owner |
|---|---|---|---|---|---|---|
| May 15, 2017 | 120296928 | Alteration Type I | SIGNED OFF | STRUCTURAL WORK RELATED TO THE RENOVATION AND CONVERSION THROUGHOUT THE BUILDING. | $0 | BOND 23 LLC |
| Nov 9, 2016 | 110192130 | Alteration Type II | SIGNED OFF | MINOR INTERIOR PARTITION AND PLUMBING REMOVAL AS PER PLAN. THERE IS NO CHANGE TO USE, EGRESS, OR OCCUPANCY FILED UNDE... | $23,000 | N/A |
| Oct 18, 2016 | 121829646 | Alteration Type III | SIGNED OFF | ERECT TEMPORARY PIPE SCAFFOLD AS PER PLANS, WORK SHALL COMPLY WITH 2008 BUILDING CODE CHAPTER 33. NO CHANGE IN USE, E... | $0 | CORMICAN CONSTRUCTION |
| Sep 2, 2016 | 140355684 | Alteration Type III | SIGNED OFF | PROPOSED INSTALLATION OF PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. | $0 | ARSENAL SCAFFOLD, INC |
| Sep 2, 2016 | 140355675 | Alteration Type III | SIGNED OFF | PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. | $0 | ARSENAL SCAFFOLD, INC |
| Jul 11, 2016 | 120570195 | Alteration Type II | SIGNED OFF | INSTALL SPRINKLER SYSTEM THROUGHOUT WITH NEW SPRINKLER WATER SERVICE. NO CHANGE TO USE, EGRESS OR OCCUPANCY. | $100,000 | BOND 23 LLC |
| Jun 23, 2016 | 120500635 | Alteration Type II | SIGNED OFF | SUBMIT PARTIAL DEMOLITION PLANS SHOWING TEMPORARY SHORING. NO CHANGE TO USE, EGRESS OR OCCUPANCY. | $120,000 | BOND 23 LLC |
| Sep 16, 2015 | 140299763 | Alteration Type III | SIGNED OFF | INSTALLATION OF PIPE SCAFFOLDING (STAIR TOWER) ON THE BACK OF THE BLDG AS PER PLANS. NO CHANGE IN USE, EGRESS, OR OCC... | $0 | PHOENIX |
| Sep 9, 2015 | 120651810 | Alteration Type III | SIGNED OFF | INSTALLATION OF PLYWOOD FENCE AS PER PLAN FOR NEW BUILDING AT 23 GRAMERCY PARK SOUTH . WORK SHALL COMPLY WITH 2008 BU... | $0 | BOND 23 LLC |
| Jun 9, 2015 | 121158898 | Alteration Type III | SIGNED OFF | INSTALL TEMPORARY SCAFFOLDING AT REAR OF BUILDING. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. | $0 | BOND 23 LLC |
| Mar 12, 2014 | 140120624 | Alteration Type III | SIGNED OFF | PIPE SCAFFOLD PROPOSED INSTALLATION OF PIPE SCAFFOLD AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY. | $0 | SPRING SCAFFOLDING LLC |
| Dec 19, 2013 | 121584945 | Alteration Type III | SIGNED OFF | INSTALLATION OF 40 LINEAR FEET OF HEAVY DUTY SIDEWALK SHED FOR BUILDING ALTERATION, FILED SEPARATELY. LIVE LOAD 300 P... | $0 | ARSENAL SCAFFOLD INC. |
| Dec 7, 2012 | 121453872 | Alteration Type III | PLAN EXAM - APPROVED | INSTALL TEMPORARY HANGING PLATFORM (FROM 1ST FLOOR) FOR DEWATERING PUMPS. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER... | $0 | BOND 23 LLC |
| Mar 22, 2011 | 120555880 | Alteration Type III | SIGNED OFF | INSTALLATION OF SCAFFOLD AS PER DRAWINGS AT REAR OF BUILDING. SCAFFOLD SHALL COMPLY WITH CHAPTER #33 OF THE 2008 CODE... | $0 | BOND 23 LLC |