ECB violations
139-141 East 35 Street, Manhattan • Block 00891 • Lot 0027
5 records
Environmental Control Board violations, which carry a hearing and a penalty.
| Issued | Violation | Status | Severity | Description | Penalty | Balance due | Hearing |
|---|---|---|---|---|---|---|---|
| Jul 3, 2006 | 32051744L | RESOLVE | Non-Hazardous | 32A,50B,50D,50A,50C,50E/50A-BOILER INSULATION JACKET DEFECTIVE/50B-OILON FLR/50C-CONTROLS CONNECTED W/UNDERSIZED PIPE... | $350 | $0 | Aug 17, 2006 |
| Jul 3, 2006 | 32051745N | RESOLVE | Non-Hazardous | 32A,50B,50D,50E,50A,50C/50A-CONTROL CONNECTED UNDERSIZED PIPING/50B-NOACCESS TO TOP OF BOILER ROOM TO CHECK SAFETY VA... | $350 | $0 | Feb 22, 2007 |
| Feb 22, 2005 | 34464923P | RESOLVE | Non-Hazardous | FAILURE TO COMPLY WITH PERMISSABLE PROJECTIONS ABOVE GRADE & BEYOND STREET LINE: NOTED AT GRD. FLOOR MEDICAL OFFICE A... | $0 | $0 | Apr 14, 2005 |
| Nov 1, 1999 | 34228313N | RESOLVE | Non-Hazardous | OPERATION OF MECHANICAL EQUIPTMENT WITHOUT FIRST OBTAINING EQUIPTMENT USE PERMIT. NOTED: 3RD FLOOR MOUNTED 10 TON A/C... | $0 | $0 | Feb 24, 2000 |
| Jun 5, 1995 | 34124215N | RESOLVE | Non-Hazardous | FAILURE TO MAINTAIN. DEFECT: PARAPET WALL IS OUT OF PLUM AND LEANING TO INTER PART OF ROOF. REMEDY: MAKE ALL REPAIRS ... | $0 | $0 | Dec 7, 1995 |