210 East 25 Street, Manhattan
Manhattan • Block 00905 • Lot 0052 • Zip: 10010
Condition
What the city currently has open against this building, counted from its own records.
Address
Land use and zoning
Building
Latest assessment
Neighborhood
The area this lot falls inside, and the commute Hoodkit measures from it.
Getting around
Estimated 3 days ago- Grand Central 15 min 9 walking, 6 riding
- Union Square 15 min 9 walking, 6 riding
- Times Square 22 min 9 walking, 13 riding
- Fulton Street 25 min 9 walking, 16 riding
- Penn Station 29 min 9 walking, 20 riding
- Downtown Brooklyn 32 min 9 walking, 23 riding
Around this address
Transit and places within 0.5 miles of the lot.
Getting out
Railroad
Ferry
Bus
Citi Bike
Places nearby
Cafe Carmellini
No description yet
Eleven Madison Park
No description yet
Clemente Bar
No description yet
La Tete d’Or
No description yet
Old Town Bar
No description yet
Borgo
Experience the charm of Italy in the heart of NYC at Borgo. This cozy, rustic spot offers authentic Italian cuisine, ...
abcV
No description yet
ABC Kitchen
No description yet
Activity
Sales, filings, permits and violations from every dataset, in one order.
2026
-
HPD violation Jun 15, 2026
Class B
§ 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK THE CEILING AND NORTH WALL IN THE 3rd ROOM FROM NORTH LOC...
-
HPD violation Jun 15, 2026
Class B
§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING AND NOR...
-
HPD violation Jun 15, 2026
Class B
§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE SPRING BALANCE AT LOWER WINDOW SASH AT THE FIRST WI...
-
HPD violation Feb 18, 2026
Class B
§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT MATERIAL CEILING AND ...
-
HPD violation Feb 18, 2026
Class B
§ 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK OVER THE CEILING IN THE BATHROOM LOCATED AT APT 5RW, 5th ...
-
HPD violation Feb 18, 2026
Class A
§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT CEILING AND NORTH WALL , 5th...
2025
-
CLASS - 2
PERMANENT DWELLING USED/CONVERTED FOR OTHER THAN PERMANENT-RESIDENTIALPURPOSES DOB RECORDS INDICATES PREMISES TO BE L...
-
CLASS - 1
FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. LACK OF SYSTEM OF AUTOMATIC SPRINKLERS WHERE REQUIRED AS PER B...
-
CLASS - 1
BC 907.2.8. FAILURE TO PROVIDE CLASS "J" A FIRE ALARM SYSTEM FOR TRANSIENT USE AT UNIT #5RE AT THE 5TH FLOOR. REMEDY:...
-
CLASS - 1
FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. FAILURE TO PROVIDE NUMBER OF REQUIRED MEANS OF EGRESS FOR EVER...
2022
-
DOB violation Jun 8, 2022
C-CONSTRUCTION OTHER OPTIONAL
2020
-
Alteration Type II
FILLING TO REPAIR EXISTING 24"X36" STONE TILE AT TOP OF EXISTING THIRD FLOOR WINDOW AS SHOWN ON PLAN SUBMITTED. NO CH...
2016
-
Alteration Type II
INTERIOR RENOVATION WITH PLUMBING & PARTITION WORK ON 4TH FLOOR APT 4RW ONLY. REFURBISH EXISTING WALL & REPLA...
2015
-
Alteration Type II
INTERIOR RENOVATION WITH PARTITION & PLUMBING WORK ON 3RD FLOOR APT 3FW. REMOVE PARTIAL PARTITIONS AND DOORS. REL...
-
Alteration Type II
RE-TILE EXISTING BATHROOM AND KITCHEN, REPAINTING OF WALLS ON BASEMENT APT. LE. NO CHANGE OF USE, EGRESS OR OCCUPANCY.
-
Alteration Type II
INTERIOR RENOVATION ON 2ND FLOOR APT. 2FE. REFURBISH EXIST. WALL & REPLACE EXIST. FLOOR. NO CHANGE IN USE, EGRESS...
2014
-
CLASS - 1
BC907.2.8 FAIL TO PROVIDE FIRE ALARM SYSTEM IN TRANSIENTLY OCCUP BLDG.REM:DISCONTINUE ILLEGAL OCCUPANCY.
-
CLASS - 1
FAIL TO MAINTAIN BLDG IN A CODE COMPLIANT MANNER.FAIL TO PROVIDE # OF REQUIRED MEANS OF EGRESS FOR EVERY FL PER BC 10...
2010
-
Alteration Type II
RENOVATION OF EXISTING APT'S 5FE AND 5RW ON 5TH FLOOR. PARTITION AND PLUMBING WORK, NEW SKYLIGHTS, NEW METAL STAIR FR...
2000
-
DOB violation Feb 7, 2000
LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
1999
-
DOB violation Mar 16, 1999
LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
1998
-
DOB violation May 4, 1998
LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
1997
-
DOB violation Sep 16, 1997
LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
-
DOB violation Feb 10, 1997
LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
The most recent 6 events from each dataset, so no one source takes the axis. Each tab holds the full record.
Property Contacts
Contact information aggregated from multiple government sources
Registration Contracts
Contact information from multiple dwelling registrations
Building Permits
Owner information from Department of Buildings filings
Recent Building Permits
Owner information from recent DOB NOW filings
Deed Records
Parties from ACRIS deed and mortgage records
Property Records
Owner information from assessment and PLUTO records