343 East 17 Street, Manhattan • Block 00923 • Lot 0026
27 records
Environmental Control Board violations, which carry a hearing and a penalty.
| Issued | Violation | Status | Severity | Description | Penalty | Balance due | Hearing |
|---|---|---|---|---|---|---|---|
| Jun 7, 2026 | 39555131M | ACTIVE | CLASS - 2 | AT TIME OF INSPECTION, OBSERVED A STORAGE ZONE ADJACENT TO A SIDEWALK SHED THAT WAS NOT PROPERLY MAINTAINED. REQUIRED... | $2,400 | $2,400 | Aug 13, 2026 |
| Mar 18, 2026 | 39552009P | RESOLVE | CLASS - 1 | OBS NEEDLEBEAMS INSTALLED #M01321529 W/ PIPESCAFFOLD #M01339244-I1, PLATES&SHORING NOT PER PLANS. EXP1 11FLR SF W/ ST... | $2,530 | $2,530 | Apr 6, 2027 |
| Mar 18, 2026 | 39552008N | RESOLVE | CLASS - 1 | OBSERVED NEEDLE BEAMS INSTALLED IN CONJUNCTION WITH PIPE SCAFFOLD FOR THE PROTECTION OF ADJACENT PROPERTIES & WORK AT... | $2,530 | $2,530 | Apr 6, 2027 |
| Mar 18, 2026 | 39551973K | RESOLVE | CLASS - 1 | ACTIVE 13STORY MAJOR BUILDING WITH ONGOING; FRAMING, DUCT WORK, CMU, HOTWORK. APPRX. 70+ WORKERS ON SITE, UPON REQUES... | $10,000 | $10,000 | Nov 5, 2026 |
| Feb 20, 2026 | 39550646Z | RESOLVE | CLASS - 2 | 10 FLOOR NEW BUILDING ACTIVE SITE. WORK CONTRARY TO APPROVED SITE SAFETY PLANS SUPERSTRUCTURE PHASE SSP-301.00. OBSER... | $0 | $0 | Dec 3, 2026 |
| Feb 20, 2026 | 39550648M | RESOLVE | CLASS - 2 | 10 STORY NEW BUILDING ACTIVE SITE. OBSERVED FIRE HYDRANT IN USE AT EXP#1. UPON REQUEST TO CONTRACTOR FOR NYC DEP PERM... | $1,250 | $1,250 | Dec 3, 2026 |
| Feb 20, 2026 | 39550647K | RESOLVE | CLASS - 2 | 10 FLOOR NEW BUILDING ACTIVE SITE. WORK CONTRARY TO SUPPORTED SCAFFOLD PLANS PERMIT#M01337046. ON 9 TH FLOOR AT EXP#1... | $1,250 | $1,250 | Dec 3, 2026 |
| Feb 4, 2026 | 39549949H | RESOLVE | CLASS - 2 | BC 3307.2.1 AT TIME OF INSPECTION OF A NEW BUILDING I OBSERVED STREET OBSTRUCTION WITH BARRIERS ON THE ROAD IN FRONT ... | $2,500 | $2,500 | Nov 5, 2026 |
| Dec 9, 2025 | 39547816P | RESOLVE | CLASS - 2 | AT TIME OF INSPECTION ON AN ACTIVE JOBSITE, OBSERVED THAT INFORMATION PANEL WAS MISSING, PROJECT INFORMATION PANEL/SI... | $0 | $0 | Mar 19, 2026 |
| Dec 9, 2025 | 39547817R | RESOLVE | CLASS - 1 | NEEDLEBEAMS &SUPP. SCAF INSTALLED CONTRARY TO DRAWINGS. MISSING SECTION OF SUPP. SCAF UNDER TRUSSES & I BEAM NOT INDI... | $2,500 | $2,500 | Nov 16, 2026 |
| Dec 9, 2025 | 39547819K | RESOLVE | CLASS - 1 | OBS EXCESSIVE DEBRIS THROUGHOUT SITE. LARGE AMOUNTS OF COMBUSTIBLE CONSTRUCTION DEBRIS & UNSECURED MATERIAL NOTED ON ... | $2,500 | $2,500 | Nov 16, 2026 |
| Dec 9, 2025 | 39547818Z | RESOLVE | CLASS - 1 | OBSERVED CONSTRUCTION ONGOING ON THE 2ND THRU7TH FLOORS. WINDOWS FACING CONSTRUCTION OPS & ROOF AT ADJACENT PROPERTY ... | $10,000 | $10,000 | Nov 16, 2026 |
| Dec 4, 2025 | 39547599H | RESOLVE | CLASS - 1 | FAILURE TO PROVIDE AND MAINTAIN ADEQUATE HOUSEKEEPING ON FLOOR LEVELS. RESPONDENT VIOLATED BC3303.4.2, 3303.5.1. PILE... | $2,530 | $2,530 | Dec 11, 2026 |
| Nov 14, 2025 | 39547005L | RESOLVE | CLASS - 1 | RESPONDING TO AN INCIDENT WHERE A WORKER FELL FROM A 6 FEET A-FRAME LADDER WHILE REINSTALLING THE VERTICAL BRACING FO... | $2,530 | $2,530 | Dec 11, 2026 |
| Nov 14, 2025 | 39547006N | RESOLVE | CLASS - 1 | RESPONDING TO AN INCIDENT WHERE A WORKER FELL FROM A 6 FEET A-FRAME LADDER WHILE REINSTALLING THE VERTICAL BRACING FO... | $5,030 | $5,030 | Dec 11, 2026 |
| Oct 27, 2025 | 39546381K | RESOLVE | CLASS - 2 | OBSERVED NUCKLE BOOM, CEMENT TRUCT AND WASHOUT BOX NOT PROTECTED ON STREETS. SITE SAFETY PLAN PG. 101.01 SHOWS THE ME... | $0 | $0 | Jan 8, 2026 |
| Sep 3, 2025 | 39544385Z | RESOLVE | CLASS - 1 | AN INCIDENT THAT OCCURRED ON 07-11-2025 AT THIS JOBSITE WHERE WORKER CUT HIS THUMB DURING RIGGING, AMBULANCE CALLED, ... | $2,500 | $0 | Dec 11, 2025 |
| Jul 25, 2025 | 39542841Y | RESOLVE | CLASS - 2 | AT TIME OF INSPECTION, I OBSERVED PERMIT M00479953-I1 NOT ISSUED DUE TO WITHDRAWAL OF SITE SAFETY COORDINATOR #027118... | $0 | $0 | Oct 2, 2025 |
| Jul 25, 2025 | 39546867K | RESOLVE | CLASS - 1 | OBSERVED ONGOING WORK AT CONSTRUCTION SITE UNDER NB PERMIT #M00479953-I1 WHILE ON NOTICE OF A STOP WORK ORDER. STOP A... | $10,030 | $10,030 | Dec 11, 2026 |
| Jul 24, 2025 | 39542784R | RESOLVE | CLASS - 2 | OBSERVED ACTIVE JOBSITE IN SOE PHASE OF CONSTRUCTION. JOBSITE CURRENTLY INSTALLING PILES @ EXPOSURE 4 WITH CORE DRILL... | $5,000 | $5,000 | Sep 14, 2026 |
| Jul 24, 2025 | 39542789X | RESOLVE | CLASS - 2 | 28-110.2-OBSERVED JOBSITE IN SOE OPERATIONS INSTALLING PILES WITH COREDRILL. UPON REVIEW OF DOB APPROVED SITE SAFETY ... | $1,280 | $1,280 | Aug 20, 2026 |
| Jul 24, 2025 | 39542785Z | RESOLVE | CLASS - 2 | OBSERVED DEWATERING CONTAINMENT TANK & DIESEL FUELED GENERATOR STREET LEVEL OF JOBSITE NOT FULLY ENCLOSED. UPON REQUE... | $2,430 | $2,430 | Aug 20, 2026 |
| Jul 24, 2025 | 39542802L | RESOLVE | CLASS - 1 | OBSERVED MAJOR BUILDING PILE DRIVING/ SOE PHASE WITHOUT SITE SAFETY COORDINATOR DESIGNATION, ALL PERMITS M00479953-I1... | $10,030 | $10,030 | Aug 20, 2026 |
| Jul 11, 2025 | 39542273P | RESOLVE | CLASS - 2 | BC 3316.9.1.1 IN RESPONSE TO AN INCIDENT WHERE A WORKER THUMP CAUGHT IN-BETWEEN PILE AND ITS DUNNAGE DURING MATERIAL ... | $5,000 | $5,000 | Aug 20, 2026 |
| Jul 11, 2025 | 39542274R | RESOLVE | CLASS - 1 | IN RESPONSE TO AN INCIDENT WHERE A WORKER THUMP CAUGHT IN-BETWEEN PILE AND ITS DUNNAGE DURING MATERIAL DELIVERY OPERA... | $12,500 | $12,500 | Aug 20, 2026 |
| Jul 11, 2025 | 39542277M | RESOLVE | CLASS - 2 | BC 3307.2.1 AT TIME OF INSPECTION OF A PROPOSED 10 STORIES NEW BUILDING I OBSERVED UNLOADING OF MATERIALS FROM THE ST... | $5,000 | $5,000 | Aug 20, 2026 |
| Jul 11, 2025 | 39542275Z | RESOLVE | CLASS - 2 | AT TIME OF INSPECTION OF A PROPOSED 10 STORIES NEW BUILDING I OBSERVED CONSTRUCTION FENCE IN PLACE AT EXPOSURE #1 WIT... | $0 | $0 | Sep 18, 2025 |