Job filings
1679-1687 Broadway, Manhattan • Block 01024 • Lot 0046
18 records
Work filed with the Department of Buildings under its legacy BIS system.
| Latest action | Job | Type | Status | Work | Cost | Owner |
|---|---|---|---|---|---|---|
| Dec 10, 2021 | 123864158 | Alteration Type II | SIGNED OFF | INTERIOR ALTERATIONS ASSOCIATED WITH FIRE DOORS IN THE THEATER. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. | $10,800 | THE SHUBERT ORGANIZATION |
| Oct 18, 2019 | 123124546 | Alteration Type II | SIGNED OFF | APPLICATION IS FILED FOR PROSCENIUM WORK AND TEMPORARY BOOTH INSTALLATION FOR THE RUN OF BROADWAY PRODUCTION "KING KO... | $55,100 | THE SHUBERT ORGANIZATION |
| Oct 18, 2019 | 123039470 | Alteration Type II | SIGNED OFF | APPLICATION IS FILED FOR SPOT PLATFORMS INSTALLATION FOR THE RUN OF BROADWAY PRODUCTION MISS SAIGON. NO CHANGE TO USE... | $26,500 | THE SHUBERT ORGANIZATION |
| Mar 20, 2019 | 123683086 | Alteration Type II | SIGNED OFF | APPLICATION IS FILED FOR REPLACEMENT OF AN EXISTING AC UNIT ON A ROOF(FAN ROOM) AND TO OBTAIN EUP CARDS TO RESOLVE TH... | $6,000 | THE SHUBERT ORGANIZATION |
| Jan 31, 2019 | 120642849 | Alteration Type II | SIGNED OFF | INSTALLATION FOR THE RUN OF SHOW OF A FALSE PROSCENIUM TRUSS FOR THE BROADWAY PRODUCTION OF SISTER ACT. NO CHANGE TO ... | $47,000 | THE SHUBERT ORGANIZATION |
| Jul 13, 2018 | 123044963 | Alteration Type II | SIGNED OFF | APPLICATION IS FILED FOR PROSCENIUM WORK FOR THE RUN OF BROADWAY PRODUCTION MISS SAIGON. NO CHANGE TO USE, EGRESS OR ... | $125,000 | THE SHUBERT ORGANIZATION |
| Jul 14, 2017 | 123083288 | Alteration Type II | SIGNED OFF | NO WORK APPLICATION FOR SEATING PLAN SUBMISSION AT ORCHESTRA AND BALCONY UNDER ARTICLE 13 FOR SPECIAL OCCUPANCY STRUC... | $3,000 | THE SHUBERT ORGANIZATION |
| Apr 7, 2017 | 122545255 | Alteration Type II | SIGNED OFF | APPLICATION IS FILED FOR MODIFICATION OF FRESH AIR SYSTEM IN THE THEATRE DRESSING ROOMS AS SHOWN ON PLANS FILED HEREW... | $105,000 | THE SHUBERT ORGANIZATION |
| Mar 17, 2017 | 122515199 | Alteration Type II | SIGNED OFF | APPLICATION IS FILED FOR PASSERELLE INSTALLATION AND FRONT SEATS REMOVAL FOR THE RUN OF BROADWAY PRODUCTION FIDDLER O... | $27,500 | THE SHUBERT ORGANIZATION |
| Mar 10, 2017 | 122887251 | Alteration Type III | SIGNED OFF | INSTALLATION OF 117 LINEAR FEET OF HEAVY DUTY SIDEWALK SHED DURING BUILDING ALTERATION, FILED SEPARATELY. SIDEWALK SH... | $0 | THE SHUBERT ORGANIZATION |
| Feb 2, 2017 | 140565591 | Alteration Type III | SIGNED OFF | INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLAN SUBMITTED. WORK SHALL COMPLY WITH 2014 BUILDING CODES CHAPTER 33.... | $0 | CS BRIDGE CORP |
| Nov 10, 2015 | 122350222 | Alteration Type II | SIGNED OFF | APPLICATION IS FILED FOR STAGE EXTENSION AND REMOVAL OF SEATS FOR THE RUN OF BROADWAY SHOW DOCTOR ZHIVAGO. NO CHANGE ... | $54,000 | THE SHUBERT ORGANIZATION |
| May 21, 2012 | 102854582 | Alteration Type II | SIGNED OFF | Installation of eight wheelchair-accessible vewing locations at eight different sites at Orchestra Level and a design... | $10,000 | THE SHUBER |
| Oct 29, 2010 | 120513952 | Alteration Type III | PLAN EXAM - APPROVED | INSTALLATION OF ROOF PROTECTION AS PER DRAWING. ROOF PROTECTION WILL COMPLY WITH CHAPTER #33 OF THE 2008 CODE. NO CHA... | $0 | OUTDOOR INSTALLATIONS, LLC |
| Jul 8, 2009 | 120089894 | Alteration Type II | PLAN EXAM - APPROVED | REPLACE HVAC UNIT ABOVE DRESSING ROOMS, MINOR MODIFICATIONS OF DUCT WORK ABOVE DRESSING ROOM FRESH AIR SYSTEM | $40,000 | THE SHUBERT ORGANIZATION INC |
| Dec 5, 2005 | 104297235 | Alteration Type II | SIGNED OFF | Installation of Lighting towers, deck, walkway for 'The Color Purple' at Broadway Theatre. No change to use, egress o... | $195,000 | Shubert Organization, Inc. |
| May 19, 2005 | 104078178 | Alteration Type II | PERMIT ISSUED - ENTIRE JOB/WORK | RENOVATION TO EXISTING SPRINKLER SYSTEM IN CELLAR. NO CHANGE IN USE OCCUPANCY OR EGRESS. | $6,000 | SHUBERT ORGANIZATION INC. |
| Nov 9, 2004 | 103737271 | Alteration Type II | SIGNED OFF | TEMPORARY MODIFICAATION OF STRUCTURAL ME MBER (MINOR TEMPORARY MODIFICAT ON TO ACCOMMODATE SHOW) NO CHANGE IN USE EGR... | $20,000 | SHUBERT ORGANIZATION INC |