Skip to content

Job filings

201-207 West 56 Street, Manhattan • Block 01028 • Lot 0029

720 records

Work filed with the Department of Buildings under its legacy BIS system.

Latest action Job Type Status Work Cost Owner
Mar 29, 2017 122935592 Alteration Type II SIGNED OFF ARCHITECTURAL WORK ON PART OF THE 4TH FLOOR (LCN) AS INDICATED ON PLANS. NO CHANGE IN EGRESS, OCCUPANCY OR USE. $204,175 VORNADO OFFICE MANAGEMENT
Mar 23, 2017 122278132 Alteration Type II SIGNED OFF INTERIOR ARCHITECTURAL CHANGES TO TENANT SPACE (TPG CAPITAL) ON PART OF THE 34TH FLOOR AS PER PLANS FILED HEREWITH. N... $976,230 VORNADO OFFICE MANAGEMENT
Mar 22, 2017 122187061 Alteration Type III SIGNED OFF INSTALLATION OF A 1500 LBS CAPACITY MATERIAL ONLY HOIST AS PER DRAWINGS. HOIST SHALL COMPLY WITH CHAPTER #33 OF THE N... $0 SAFWAY ATLANTIC LLC
Mar 22, 2017 122072899 Alteration Type III SIGNED OFF INSTALLATION OF 76 LINEAR FEET OF HEAVY DUTY SIDEWALK SHED AT PLAZA DURING BUILDING ALTERATION, FILED SEPARATELY. LIV... $0 SAFWAY ATLANTIC LLC
Mar 22, 2017 122223496 Alteration Type III SIGNED OFF INSTALLATION OF SUSPENDED SCAFFOLD AS PER DRAWINGS. SUSPENDED SCAFFOLD SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILD... $0 SAFWAY ATLANTIC LLC
Mar 22, 2017 122013052 Alteration Type III SIGNED OFF INSTALLATION OF 312 LINEAR FEET OF HEAVY DUTY SIDEWALK SHED DURING BUILDING ALTERATION, FILED SEPARATELY. LIVE LOAD 3... $0 SAFWAY ATLANTIC LLC
Jan 24, 2017 122506467 Alteration Type II SIGNED OFF ADDITIONS/MODIFICATIONS TO THE EXISTING FIRE ALARM SYSTEM ON THE 24TH FLOOR AS PER PLANS FILED HEREWITH. $10,000 VORNADO OFFICE MANAGEMENT
Jan 17, 2017 122275466 Alteration Type II SIGNED OFF ADDITIONS/MODIFICATIONS TO THE EXISTING FIRE ALARM SYSTEM ON THE 34TH FLOOR AS PER PLANS FILED HEREWITH. $30,800 VORNADO OFFICE MANAGEMENT
Jan 17, 2017 122274840 Alteration Type II SIGNED OFF SPRINKLER SYSTEM MODIFICATIONS TO TENANT SPACE (TPG CAPITAL) ON PART OF THE 34TH FLOOR AS PER PLANS FILED HEREWITH. N... $83,900 VORNADO OFFICE MANAGEMENT
Jan 3, 2017 122528719 Alteration Type II SIGNED OFF ADDITIONS/MODIFICATIONS TO THE EXISTING FIRE ALARM SYSTEM ON THE 24TH FLOOR AS PER PLANS FILED HEREWITH. $8,000 VORNADO OFFICE MANAGEMENT
Dec 29, 2016 122741346 Alteration Type II SIGNED OFF REMOVAL OF SPRINKLER HEADS AND INSTALLATION OF TEMPORARY CORE SPRINKLER PROTECTION (LOOP) ON THE 7TH FLOOR AND PART O... $43,000 VORNADO OFFICE MANAGEMENT
Dec 15, 2016 122688680 Alteration Type II SIGNED OFF INTERIOR ARCHITECTURAL CHANGES TO TENANT SPACE (WELTON INVESTMENTS) ON PART OF THE 40TH FLOOR AS PER PLANS FILED HERE... $230,215 VORNADO OFFICE MANAGEMENT
Nov 23, 2016 122462138 Alteration Type II SIGNED OFF SPRINKLER SYSTEM MODIFICATIONS TO TENANT SPACE (TPG AXON) ON PART OF THE 38TH FLOOR AS PER PLANS FILED HEREWITH. NO C... $15,300 VORNADO OFFICE MANAGEMENT
Nov 21, 2016 122745994 Alteration Type II SIGNED OFF SPRINKLER MODIFICATIONS ON FLOORS 39 AND 40 (CORCORAN) AS INDICATED ON PLANS. NO CHANGE IN EGRESS, OCCUPANCY OR USE. $43,800 VORNADO OFFICE MANAGEMENT
Nov 21, 2016 122745896 Alteration Type II SIGNED OFF STRUCTURAL MODIFICATIONS TO FLOORS 39 AND 40 (CORCORAN) AS INDICATED ON PLANS. NO CHANGE IN EGRESS, OCCUPANCY OR USE. $90,752 VORNADO OFFICE MANAGEMENT
Oct 27, 2016 122462165 Alteration Type II SIGNED OFF SPRINKLER SYSTEM MODIFICATIONS TO TENANT SPACE (TPG CAPITAL) ON PART OF THE 37TH FLOOR AS PER PLANS FILED HEREWITH. N... $70,500 VORNADO OFFICE MANAGEMENT
Oct 27, 2016 122462147 Alteration Type II SIGNED OFF INTERIOR ARCHITECTURAL CHANGES TO TENANT SPACE (TPG AXON) ON PART OF THE 38TH FLOOR AS PER PLANS FILED HEREWITH. NO C... $1,315,635 VORNADO OFFICE MANAGEMENT
Oct 27, 2016 122411988 Alteration Type II SIGNED OFF ADDITIONS/MODIFICATIONS TO THE EXISTING FIRE ALARM SYSTEM ON THE 37TH FLOOR AS PER PLANS FILED HERWITH. $10,000 VORNADO OFFICE MANAGEMENT
Oct 27, 2016 122266243 Alteration Type II SIGNED OFF ADDITIONS/MODIFICATIONS TO THE EXISTING FIRE ALARM SYSTEM ON THE 38TH FLOOR AS PER PLANS FILED HEREWITH. $10,000 VORNADO OFFICE MANAGEMENT
Oct 20, 2016 103835496 Alteration Type II SIGNED OFF SPRINKLER CHANGES OM THE 30TH THRU 33RD FLOORS AS INDICATED ON DRAWINGS NO CHANGE IN USE EGRESS OR OCCUPANCY NO CHANG... $150,000 VORNADO OFFICE MNGMNT
Oct 20, 2016 122858050 Alteration Type II PERMIT ISSUED - ENTIRE JOB/WORK ADDITIONS/MODIFICATIONS TO THE EXISTING FIRE ALARM SYSTEM ON THE ROOF LEVEL AS PER PLANS SUBMITTED HEREWITH. $6,000 VORNADO OFFICE MANAGEMENT
Oct 17, 2016 122687725 Alteration Type II SIGNED OFF SPRINKLER SYSTEM MODIFICATIONS TO TENANT SPACE (WELTON INVESTMENTS) ON PART OF THE 40TH FLOOR AS PER PLANS FILED HERE... $67,000 VORNADO OFFICE MANAGEMENT
Oct 17, 2016 122533124 Alteration Type II SIGNED OFF SPRINKLER SYSTEM MODIFICATIONS TO CORE RESTROOMS AND "WHITEBOX" SPACE ON PART OF THE 30TH FLOOR AS PER PLANS FILED HE... $2,700 VORNADO OFFICE MANAGEMENT
Oct 14, 2016 122716640 Alteration Type II SIGNED OFF INTERIOR DEMOLITION OF NONLOADBEARING PARTITIONS WITH RELATED WORK ON THE 7TH FLOOR AND PART OF THE 8TH FLOOR AS PER ... $89,000 VORNADO OFFICE MANAGEMENT
Oct 3, 2016 122269598 Alteration Type II SIGNED OFF INSTALLATION OF CURTAIN WALL AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY. $1,200,000 VORNADO OFFICE MANAGEMENT
Sep 30, 2016 122498895 Alteration Type II PERMIT ISSUED - ENTIRE JOB/WORK REMOVE AND CONSTRUCT INTERIOR PARTITIONS, DOORS AND CEILING AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EG... $2,200,000 VORNADO REALTY TRUST
Sep 7, 2016 122873113 Alteration Type II PERMIT ISSUED - ENTIRE JOB/WORK STRUCTURAL STEEL REINFORCEMENT ON THE ROOF LEVEL AS PER PLANS SUBMITTED HEREWITH. NO CHANGE IN BUILDING USE, EGRESS, ... $26,600 VORNADO OFFICE MANAGEMENT
Sep 6, 2016 122159591 Alteration Type II SIGNED OFF ADDITIONS/MODIFICATIONS TO THE EXISTING FIRE ALARM SYSTEM ON PART OF THE 43RD FLOOR AS PER PLANS FILED HEREWITH. $9,000 VORNADO OFFICE MANAGEMENT
Sep 6, 2016 122009780 Alteration Type II SIGNED OFF MODIFICATION OF THE EXISTING CLASS E FIRE ALARM SYSTEM ON THE 39TH FLOOR AS INDICATED ON PLANS. $1,000 VORNADO OFFICE MANAGEMENT
Jul 25, 2016 122523091 Alteration Type II SIGNED OFF MECHANICAL AND PLUMBING CHANGES TO TENANT SPACE (DABROES MANAGEMENT) ON PART OF THE 24TH FLOOR AS PER PLANS FILED HER... $56,000 VORNADO OFFICE MANAGEMENT
Jul 15, 2016 122670136 Alteration Type II SIGNED OFF SPRINKLER SYSTEM MODIFICATIONS TO TENANT SPACE (TICKETMASTER / LIVE NATION) ON PART OF THE 2ND FLOOR AS PER PLANS FIL... $4,500 VORNADO OFFICE MANAGEMENT
Jul 11, 2016 122261088 Alteration Type II SIGNED OFF ADDITIONS/MODIFICATIONS TO THE EXISTING FIRE ALARM SYSTEM ON THE 24TH AND 29TH FLOORS AS PER PLANS FILED HEREWITH. $12,000 VORNADO OFFICE MANAGEMENT
Jul 11, 2016 122251240 Alteration Type II SIGNED OFF SPRINKLER SYSTEM MODIFICATIONS TO CORE RESTROOMS AND PUBLIC CORRIDORS ON THE 24TH, 29TH, AND 43RD FLOORS AS PER PLANS... $45,750 VORNADO OFFICE MANAGEMENT
Jul 11, 2016 122275849 Alteration Type II SIGNED OFF ADDITIONS/MODIFICATIONS TO THE EXISTING FIRE ALARM SYSTEM ON THE 12TH FLOOR AS PER PLANS FILED HEREWITH. $2,000 VORNADO OFFICE MANAGEMENT
Jul 11, 2016 121808302 Alteration Type II SIGNED OFF MODIFICATION OF SPRINKLER SYSTEM ON THE 6TH AND 17TH FLOORS (VORNADO) AS INDICATED ON DRAWINGS. NO CHANGE IN USE, EGR... $12,000 VORNADO OFFICE MANAGEMENT
Jul 7, 2016 121519311 Alteration Type II SIGNED OFF INSTALLATION OF TEMPORARY SPRINKLER LOOP ON THE 13TH FLOOR AS INDICATED ON DRAWINGS. $7,000 VORNADO OFFICE MANAGEMENT
Jun 6, 2016 122247158 Alteration Type II SIGNED OFF SPRINKLER SYSTEM MODIFICATIONS TO TENANT SPACE (VISIUM ASSET MANAGEMENT) ON THE 21ST FLOOR AS PER PLANS FILED HEREWIT... $6,000 VORNADO OFFICE MANAGEMENT
Jun 1, 2016 122478728 Alteration Type II SIGNED OFF REMOVAL OF SPRINKLER HEADS AND INSTALLATION OF TEMPORARY CORE SPRINKLER PROTECTION (LOOP) ON THE 28TH, AND 30TH THRU ... $105,900 VORNADO OFFICE MANAGEMENT
May 23, 2016 122491847 Alteration Type II SIGNED OFF INTERIOR ARCHITECTURAL CHANGES TO TENANT SPACE (DARYL ROTH PRODUCTIONS) ON PART OF THE 24TH FLOOR AS PER PLANS FILED ... $369,000 VORNADO OFFICE MANAGEMENT
Apr 20, 2016 122608115 Alteration Type II SIGNED OFF INTERIOR ARCHITECTURAL CHANGES TO TENANT SPACE (TICKETMASTER / LIVE NATION) ON PART OF THE 2ND FLOOR AS PER PLANS FIL... $138,570 VORNADO OFFICE MANAGEMENT
Mar 31, 2016 122513967 Alteration Type II SIGNED OFF INTERIOR ARCHITECTURAL CHANGES TO CORE RESTROOMS AND 'WHITEBOX' SPACE ON PART OF THE 30TH FLOOR AS PER PLANS FILED HE... $193,800 VORNADO OFFICE MANAGEMENT
Mar 17, 2016 122533115 Alteration Type II SIGNED OFF SPRINKLER SYSTEM MODIFICATIONS TO TENANT SPACE (DABROES MANAGEMENT) ON PART OF THE 24TH FLOOR AS PER PLANS FILED HERE... $19,900 VORNADO OFFICE MANAGEMENT
Mar 17, 2016 122463556 Alteration Type II SIGNED OFF SPRINKLER SYSTEM MODIFICATIONS TO TENANT SPACE (DARYL ROTH PRODUCTIONS) ON PART OF THE 24TH FLOOR AS PER PLANS FILED ... $41,100 VORNADO OFFICE MANAGEMENT
Mar 16, 2016 121638380 Alteration Type II SIGNED OFF MECHANICAL CHANGES ON THE 38TH FLOOR AS INDICATED ON DRAWINGS. NO CHANGE IN USE EGRESS OR OCCUPANCY. $71,000 VORNADO OFFICE MANAGEMENT
Mar 7, 2016 122374215 Alteration Type II SIGNED OFF ADDITIONS/MODIFICATIONS TO THE EXISTING FIRE ALARM SYSTEM ON THE 40TH FLOOR AS PER PLANS FILED HEREWITH. $15,000 VORNADO OFFICE MANAGEMENT
Mar 4, 2016 122395808 Alteration Type II SIGNED OFF SPRINKLER SYSTEM MODIFICATIONS TO CORE RESTROOMS AND PUBLIC CORRIDOR ON THE 40TH FLOOR AS PER PLANS FILED HEREWITH. N... $18,400 VORNADO OFFICE MANAGEMENT
Mar 1, 2016 122009584 Alteration Type II SIGNED OFF MODIFICATION OF THE EXISTING CLASS E FIRE ALARM SYSTEM ON THE 16TH FLOOR AS INDICATED ON PLANS. $8,000 VORNADO OFFICE MANAGEMENT
Mar 1, 2016 121947607 Alteration Type II SIGNED OFF INTERIOR DEMOLITION OF NONLOADBEARING PARTITIONS, REMOVAL OF PLUMBING FIXTURES AND RELATED WORK ON THE 16TH FLOOR AS ... $48,500 VORNADO OFFICE MANAGEMENT
Mar 1, 2016 122054329 Alteration Type II SIGNED OFF SPRINKLER SYSTEM MODIFICATIONS TO TENANT SPACE (UNIQUE FEATURES) ON PART OF THE 16TH FLOOR AS PER PLANS FILED HEREWIT... $34,000 VORNADO OFFICE MANAGEMENT
Mar 1, 2016 122069581 Alteration Type II SIGNED OFF INTERIOR DEMOLITION OF NONLOADBEARING PARTITIONS, REMOVAL OF PLUMBING FIXTURES, AND RELATED WORK ON THE 29TH FLOOR AS... $8,250 VORNADO OFFICE MANAGEMENT