ECB violations
358 West 51 Street, Manhattan • Block 01041 • Lot 0057
35 records
Environmental Control Board violations, which carry a hearing and a penalty.
| Issued | Violation | Status | Severity | Description | Penalty | Balance due | Hearing |
|---|---|---|---|---|---|---|---|
| Mar 3, 2026 | 39178966J | ACTIVE | CLASS - 1 | I OBSERVED ACTIVE TEMPORARY MOBILE BOILER INSTALLED WITHOUT AN ELECTRICAL PERMIT ON FILE., OBTAIN PERMIT; OBTAIN ELEC... | $12,500 | $12,500 | May 7, 2026 |
| Dec 4, 2025 | 39169354Y | ACTIVE | CLASS - 1 | FAILURE TO SUBMIT CERTIFICATE OF CORRECTION FOR VIOLATION # 39116891K ISSUED ON 05/16/2024 FOR WORK WITHOUT PERMIT, C... | $12,500 | $12,500 | Feb 12, 2026 |
| Dec 4, 2025 | 39169355X | ACTIVE | CLASS - 1 | FAILURE TO SUBMIT CERTIFICATE OF CORRECTION FOR VIOLATION # 39116907X ISSUED ON 05/16/2024 FOR WORK WITHOUT PERMIT, C... | $12,500 | $12,500 | Feb 12, 2026 |
| Dec 4, 2025 | 39169356H | ACTIVE | CLASS - 1 | FAILURE TO SUBMIT CERTIFICATE OF CORRECTION FOR VIOLATION # 39116889L ISSUED ON 05/16/2024 FOR PLUMBING WORK WITHOUT ... | $12,500 | $12,500 | Feb 12, 2026 |
| Dec 4, 2025 | 39169357J | ACTIVE | CLASS - 1 | FAILURE TO SUBMIT CERTIFICATE OF CORRECTION FOR VIOLATION # 39116917J ISSUED ON 05/16/2024 FOR WORK WITHOUT PERMIT, C... | $12,500 | $12,500 | Feb 12, 2026 |
| Dec 4, 2025 | 39169358L | ACTIVE | CLASS - 1 | AT TIME OF INSPECTION OBSERVED FACADE EXPOSURE # 1 IS IN DISREPAIR,SPELLING CONCRETE BETWEEN 4RTH AND 5TH FLOOR HOWEV... | $25,000 | $25,000 | Feb 12, 2026 |
| Dec 4, 2025 | 39169359N | ACTIVE | CLASS - 1 | FAILURE TO SUBMIT CERTIFICATE OF CORRECTION FOR VIOLATION # 39116911Z ISSUED ON 05/16/2024 FOR PLUMBING WORK WITHOUT ... | $12,500 | $12,500 | Feb 12, 2026 |
| Dec 4, 2025 | 39169360K | ACTIVE | CLASS - 1 | FAILURE TO SUBMIT CERTIFICATE OF CORRECTION FOR VIOLATION # 39116919N ISSUED ON 05/16/2024 FOR PLUMBING WORK WITHOUT ... | $12,500 | $12,500 | Feb 12, 2026 |
| Dec 4, 2025 | 39169362Y | ACTIVE | CLASS - 1 | FAILURE TO SUBMIT CERTIFICATE OF CORRECTION FOR VIOLATION # 39116916H ISSUED ON 05/16/2024 FOR ELECTRICAL WORK WITHOU... | $12,500 | $12,500 | Feb 12, 2026 |
| Dec 4, 2025 | 39169363X | ACTIVE | CLASS - 1 | FAILURE TO SUBMIT CERTIFICATE OF CORRECTION FOR VIOLATION # 39116922Y ISSUED ON 05/16/2024 FOR ELECTRICAL WORK WITHOU... | $12,500 | $12,500 | Feb 12, 2026 |
| Dec 4, 2025 | 39169353M | ACTIVE | CLASS - 1 | FAILURE TO SUBMIT CERTIFICATE OF CORRECTION FOR VIOLATION # 39116888J ISSUED ON 05/16/2024 FOR WORK WITHOUT PERMIT, C... | $12,500 | $12,500 | Feb 12, 2026 |
| Dec 4, 2025 | 39169361M | ACTIVE | CLASS - 1 | FAILURE TO SUBMIT CERTIFICATE OF CORRECTION FOR VIOLATION # 39116890Z ISSUED ON 05/16/2024 FOR ELECTRICAL WORK WITHOU... | $12,500 | $12,500 | Feb 12, 2026 |
| Nov 13, 2025 | 39166857M | ACTIVE | CLASS - 2 | OBSERVED IN BASEMENT PROHIBITED UNSHIELDED RUBBER COUPLINGS FITTED ON NEWLY INSTALLED CAST IRON WASTE PIPING. AS PER ... | $6,250 | $6,250 | Jan 22, 2026 |
| Nov 5, 2025 | 39165931R | ACTIVE | CLASS - 1 | ATOI OBSERVED AT EXPOSURE I AT ABOVE PREMISES, 2ND FLOOR, A/C UNIT WITH NO SUPPORT BRACKET, ALSO A/C UNIT MOUNTED IN ... | $25,000 | $25,000 | Jan 15, 2026 |
| Oct 23, 2025 | 39164675M | ACTIVE | CLASS - 2 | FAILURE TO POST/ PROPERLY POST ACTIVE ELECTRICAL WORK PERMIT FOR WORK ON THE 5TH FLOOR. ATOI PERMIT ACTIVE IN THE DEP... | $1,500 | $1,500 | Jan 8, 2026 |
| Oct 23, 2025 | 39164674K | ACTIVE | CLASS - 1 | TAMPERED WITH, REMOVED OR DEFACED A WRITTEN POSTED STOP WORK ORDER. ATOI OBSERVED THAT THE STOP WORK ORDER THAT WAS P... | $25,000 | $25,000 | Dec 21, 2026 |
| Sep 29, 2025 | 39161863X | ACTIVE | CLASS - 1 | ECB VIOLATION ISSUED FOR UNSAFE STORAGE OF CONSTRUCTION MATERIALS AT 1ST FLOOR CORRIDOR OF OCCUPIED MD BUILDING. SEVE... | $12,500 | $12,500 | Apr 2, 2026 |
| May 16, 2024 | 39116919N | ACTIVE | CLASS - 1 | ATOI ON A 5 STORY BLDG. PLUMBING WORK/WAS DONE THROUGHOUT THE ENTIRE PREMISES AT APT:#AG. UPON REVIEWING. AND DOING A... | $25,000 | $25,000 | Aug 22, 2024 |
| May 16, 2024 | 39116922Y | ACTIVE | CLASS - 1 | ATOI ON A 5 STORY BLDG. OBSERVED ELECTRICAL WORK WAS PERFORM THROUGHOUT THE ENTIRE PREMISES @ APT:#BC, UPON REVIEWING... | $8,000 | $8,000 | Aug 22, 2024 |
| May 16, 2024 | 39116904K | ACTIVE | CLASS - 1 | ATOI OF A 5-STORY BUILDING IT WAS OBSERVED AT EXPOSURE:#1,5TH FL WALL PLASTER BULGING OUT/ SPALLING CONCRETE THROUGHO... | $6,250 | $6,250 | Aug 22, 2024 |
| May 16, 2024 | 39116907X | ACTIVE | CLASS - 1 | ATOI ON A 5 STORY BLDG., GENERAL CONSTRUCTION /OR ALTERATION WORK @APT:#BH(@358 WEST 51ST ST) TO CREATE ADDITIONAL BE... | $12,500 | $12,500 | Aug 22, 2024 |
| May 16, 2024 | 39116911Z | ACTIVE | CLASS - 1 | ATOI ON A 5 STORY BLDG. PLUMBING WORK/WAS DONE THROUGHOUT THE ENTIRE PREMISES AT APT:#AG. UPON REVIEWING. AND DOING A... | $25,000 | $25,000 | Aug 22, 2024 |
| May 16, 2024 | 39116916H | ACTIVE | CLASS - 1 | ATOI ON A 5 STORY BLDG. OBSERVED ELECTRICAL WORK WAS PERFORM THROUGHOUT THE ENTIRE PREMISES @ APT:#BH, UPON REVIEWING... | $8,000 | $8,000 | Aug 22, 2024 |
| May 16, 2024 | 39116917J | ACTIVE | CLASS - 1 | ATOI ON A 5 STORY BLDG., GENERAL CONSTRUCTION /OR ALTERATION WORK @APT:#BC(@358 WEST 51ST ST) TO CREATE ADDITIONAL BE... | $12,500 | $12,500 | Aug 22, 2024 |
| May 16, 2024 | 39116888J | ACTIVE | CLASS - 1 | ATOI ON A 5 STORY BLDG., GENERAL CONSTRUCTION /OR ALTERATION WORK @APT:#AG(@358 WEST 51ST ST) TO CREATE ADDITIONAL BE... | $12,500 | $12,500 | Aug 22, 2024 |
| May 16, 2024 | 39116889L | ACTIVE | CLASS - 1 | ATOI ON A 5 STORY BLDG. PLUMBING WORK/WAS DONE THROUGHOUT THE ENTIRE PREMISES AT APT:#AG. UPON REVIEWING. AND DOING A... | $25,000 | $25,000 | Aug 22, 2024 |
| May 16, 2024 | 39116890Z | ACTIVE | CLASS - 1 | ATOI ON A 5 STORY BLDG. OBSERVED ELECTRICAL WORK WAS PERFORM THROUGHOUT THE ENTIRE PREMISES @ APT:#AG. UPON REVIEWING... | $8,000 | $8,000 | Aug 22, 2024 |
| May 16, 2024 | 39116891K | ACTIVE | CLASS - 1 | ATOI ON A 5-STORY BLDG. GENERAL CONSTRUCTION /OR ALTERATION WORK @ HALLWAY, SECOND AND THIRD FLOORS CUTTING OPENINGS ... | $12,500 | $12,500 | Aug 22, 2024 |
| Dec 9, 2020 | 35509582Z | RESOLVE | CLASS - 2 | PEDESTRIAN PROTECTION DOES NOT MEET CODE SPECIFICATIONS AT TIME OF INSPECTION OBSERVED 5 STORY BLDG SIDEWALK SHED ERE... | $0 | $0 | Jun 24, 2021 |
| Dec 9, 2020 | 35509579H | RESOLVE | CLASS - 1 | WORK W/OUT A PERMIT AT TIME OF INSPECTION ON AN ACTIVE JOBSITE,OBSERVED 5 STORY BLDG OBSERVE PIPE SCAFFOLD ERECTED ON... | $2,500 | $0 | Jul 8, 2021 |
| Dec 9, 2020 | 35509581R | ACTIVE | CLASS - 2 | PROTECT INFORMATION PANEL/SIDEWALK SHED PARAPET PANEL/CONSTRUCTION SIGN NOT PROVIDED.AT TIME OF INSPECTION ON A 5 STO... | $625 | $625 | Jun 24, 2021 |
| Dec 9, 2020 | 35509580P | RESOLVE | CLASS - 1 | 3314.1 FAILURE TO MAINTAIN PIPE SCAFFOLD DEBRIS NETTING AT TIME OF INSPECTION ON A 5 STORY ACTIVE JOB SITE OBSERVED P... | $625 | $625 | Jun 24, 2021 |
| Oct 8, 2020 | 35542653L | ACTIVE | CLASS - 2 | FAILURE TO MAINTAIN BUILDING WALLS OR APPURTENANCES NOTE AT EXPOSURE #1 SPALLING CONCRETE THROUGHOUT FACADE FROM FL 2... | $1,250 | $1,250 | May 13, 2021 |
| Aug 7, 2020 | 39026602X | RESOLVE | CLASS - 1 | FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER. NOTED: EXPOSURE ONE OF BUILDING BROWNSTONE WINDOW SILLS AND LI... | $1,250 | $1,250 | Sep 24, 2020 |
| Aug 7, 2013 | 35030224Y | RESOLVE | CLASS - 2 | WORK W/O A PERMIT. WORK NOTED: AT TIME OF INSPECTION NEW ELECTRICAL BXCABLE BEING INSTALLED THROUGHOUT HALLWAYS & STA... | $800 | $0 | Oct 24, 2013 |