| Jun 21, 2024 | 39529875X | RESOLVE | CLASS - 2 | OBSERVED A SWS AT EXP#2 WITH 2 DEBRIS CHUTES ATTACHED TO IT- 1 LEADING DIRECTLY INTO AN OPEN CONTAINER IN THE ROADWAY... | $1,250 | $0 | Aug 29, 2024 |
| Jun 21, 2024 | 39529874Y | RESOLVE | CLASS - 2 | BC 3307.4.7 WORK OR STORAGE ZONES. OBSVD WORK AND/OR STORAGE ZONE IN THE ROADWAY AT EXP#2 W/ A DEBRIS CHUTE ATTACHED ... | $2,500 | $0 | Aug 29, 2024 |
| Aug 1, 2022 | 39504389J | RESOLVE | CLASS - 2 | AT TIME OF INSPECTION, IT WAS OBSEREVD 2 SUSPENDED SCAFFOLD SYSTEMS AT EXPOSURE 1. UPON REVIEW OF THE SITE SAFETY PLA... | $625 | $0 | Dec 29, 2022 |
| Jul 22, 2022 | 39503981Y | RESOLVE | CLASS - 1 | AT THE TIME OF INSPECTION, OBSERVED SUPPORTED SCAFFOLDING ON THE ROOF LEVEL, NOT CONFORMING TO APPROVED DESIGN DRAWIN... | $0 | $0 | Feb 16, 2023 |
| Jul 22, 2022 | 39503977L | RESOLVE | CLASS - 2 | AT THE TIME OF INSPECTION THERE WERE NO COMPLIANCE WITH MANUFACTURERS SPECIFICATIONS FOR EQUIPMENT USE FAILURE TO PRO... | $5,000 | $0 | Feb 16, 2023 |
| Jul 22, 2022 | 39503986N | RESOLVE | CLASS - 1 | AT THE TIME OF INSPECTION, OBSERVED SUPPORTED SCAFFOLDING AT THE ROOF LEVEL, UNSAFE SCAFFOLDING, STOP ALL EXTERIOR WO... | $2,500 | $0 | Nov 10, 2022 |
| Jun 28, 2022 | 39502778Y | RESOLVE | CLASS - 1 | RESPONDING TO AN INCIDENT WHERE THE ELEVATOR OPERATOR GOT HIT IN FACE WHILE TRANSPORTING A LIF FROM THE ELEVATOR WORK... | $0 | $0 | Feb 9, 2023 |
| Apr 29, 2022 | 35654134X | RESOLVE | CLASS - 2 | FAILURE TO SAFEGUARD ALL PERSONS&PROPERTY AFFECTED BY CONST OPS-STOP ALL USE OF BATTERYPOWERED DEWALT SAWS NO WORK ST... | $5,000 | $0 | Jan 12, 2023 |
| Apr 29, 2022 | 35654135H | RESOLVE | CLASS - 1 | FAILURE TO COMMUNICATE REQUIRED INFO TO WORKERS DURING PRESHIFT SAFETYMEETING (CP) STOP ALL INSTALLATION OF DOOR BUCK... | $0 | $0 | Jan 12, 2023 |
| Feb 14, 2022 | 35641202X | RESOLVE | CLASS - 2 | FAILURE TO PROVIDE ADEQUATE HOUSEKEEPING. IN RESPONSE TO AN INCIDENT IN WHICH WORKER RAFAEL POLANCO SUSTAINED A LEG I... | $625 | $0 | May 12, 2022 |
| Feb 12, 2022 | 35641200M | RESOLVE | CLASS - 1 | FAILURE TO PROVIDE MEASURES - CONCRETE STRIPPING OPERATIONS. ON 2/11/2022 WORKER RAFAEL POLANCO SUSTAINED A LEG INJUR... | $625 | $0 | May 12, 2022 |
| Feb 12, 2022 | 35641201Y | RESOLVE | CLASS - 2 | WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION PLANS/DOCUMENTS. IN RESPONSE TO AN INCIDENT IN WHICH WORKER RAFAEL POL... | $625 | $0 | May 12, 2022 |
| Feb 3, 2022 | 35639323J | RESOLVE | CLASS - 1 | BC3301.2 FAILURE TO MAINTAIN SAFETY NOTE:ATOI@N6STYB I OBSERVED THRUOUT BLDG ON ALL FLS EXPOSED ELECTRICAL WIRING.THI... | $625 | $0 | Aug 25, 2022 |
| Feb 3, 2022 | 35639322H | RESOLVE | CLASS - 1 | FAILURE TO COMPLY W/MANUFACTURER SPECS NOTE:ATO MY INSP I OBSERVED METAL TECH BAKER SUPPORTED PIPE SCF ERECTED APRX18... | $625 | $0 | Aug 25, 2022 |
| Jan 28, 2022 | 35639157N | RESOLVE | CLASS - 1 | BC3310.5.1 NOTIFICATION TO THE DEPT.NOTE:AT THE TIME OF INSPECTION.REVIEW OF SITE SAFETY MANAGER LOGS REVEAL THAT DES... | $625 | $0 | Nov 10, 2022 |
| Jan 28, 2022 | 35639156L | RESOLVE | CLASS - 1 | FAILURE TO INSTITUTE & MAINTAIN SAFETY EQUIPMENT & TEMPORARY CONSTRUCTION EQUIPMENT.NOTE:AT TIME OF INSPECTION RESPON... | $5,000 | $0 | Nov 10, 2022 |
| Jan 12, 2022 | 35639985Z | RESOLVE | CLASS - 1 | FAILURE TO NOTIFY THE DEPARTMENT OF AN ACCIDENT OR INCIDENT THAT RESULTED IN A FATALITY OR INJURY.NOTE:ONE WORKER WER... | $1,250 | $0 | Mar 2, 2023 |
| Dec 17, 2021 | 35632518H | RESOLVE | CLASS - 1 | FAILED TO NOTIFY THE DEPT OF AN ACCIDENT/INCIDENT THAT RESULTED IN A FATALITY OR AN INJURY.NOTE:A WORKER TRIPPED ON A... | $1,250 | $0 | Mar 2, 2023 |
| Dec 17, 2021 | 35632516Y | RESOLVE | CLASS - 1 | FAILED TO NOTIFY THE DEPT OF AN ACCIDENT/INCIDENT THAT RESULTED IN A FATALITY OR AN INJURY.NOTE:A WORKER GOT LACERATI... | $1,250 | $0 | Mar 2, 2023 |
| Dec 15, 2021 | 35638816N | RESOLVE | CLASS - 1 | 3303.4.1.2 STOP ALL WORK STAIR 3 BRIDGE 1FL.ALLOWED TO WORK ONLY TO MAKE SAFE.NOTE ATOI I OBSERVED SLING WHERE GILBER... | $625 | $0 | Feb 8, 2023 |
| Nov 8, 2021 | 35632255P | RESOLVE | CLASS - 1 | BC3303.4.1 FAILURE TO COMPLY W/SAFETY STANDARD NOTE:ATOI IN RESPONSE TO INCIDENT WHERE WORKER WAS CARRYING STEEL META... | $0 | $0 | Jun 9, 2022 |
| Nov 5, 2021 | 35632353Z | RESOLVE | CLASS - 1 | FAILURE TO INSTITUTE&MAINTAIN SAFETY EQUIPMENT MEASURES&TEMP CONST EQUIPMENT.ATOI RESPONDING TO INCIDENT WHERE WORKER... | $0 | $0 | Jun 9, 2022 |
| Oct 25, 2021 | 35506096J | RESOLVE | CLASS - 2 | WORK WITHOUT PERMIT.NOTE:AT TIME OF INSPECTION OBSERVED TEMPORARY BATHROOMS IN PLACE WITHOUT VALID PERMIT.REMEDY:COMP... | $625 | $0 | May 26, 2022 |
| Oct 13, 2021 | 39049198P | ACTIVE | CLASS - 1 | NO DOOR LOCK MONITORING INSTALLED IN THIS CONTROLLER AS MANDATED BY 3.10.12 OF APPENDIX K3 OF THE 2014 NYCBC. THIS IS... | $1,250 | $0 | Feb 9, 2023 |
| Oct 13, 2021 | 35632293X | RESOLVE | CLASS - 1 | FAILED TO NOTIFY THE DEPT OF AN INCIDENT/ACCIDENT THAT RESULTED IN A FATALITY OR AN INJURY. NOTE: A WORKER GOT HIS FI... | $1,250 | $0 | Nov 17, 2022 |
| Oct 13, 2021 | 35632294H | RESOLVE | CLASS - 1 | FAILED TO NOTIFY THE DEPT OF AN INCIDENT/ACCIDENT THAT RESULTED IN A FATALITY OR AN INJURY. NOTE: A WORKER GOT CONCRE... | $5,000 | $0 | Jun 30, 2022 |
| Sep 17, 2021 | 35506384Y | RESOLVE | CLASS - 1 | FAILURE TO INSTITUTE & MAINTAIN SAFETY EQUIPMENT MEASURES. NOTE AT TIME OF INSPECTION RESPONDING TO A COMPLAINT WHERE... | $0 | $0 | Mar 10, 2022 |
| Sep 17, 2021 | 35506385X | RESOLVE | CLASS - 1 | FAILURE TO INSTITUTE & MAINTAIN SAFETY EQUIPMENT MEASURES. NOTE AT TIME OF INSPECTION RESPONDING TO A COMPLAINT WHERE... | $2,500 | $0 | Aug 18, 2022 |
| Sep 14, 2021 | 35506156M | RESOLVE | CLASS - 1 | FAILURE TO NOTIFY THE DEPARTMENT OF AN ACCIDENT/INCIDENT THAT RESULTEDIN A FATALITY OR AN INJURY.NOTE AN ELECTRICIAN ... | $1,250 | $0 | May 19, 2022 |
| Aug 20, 2021 | 35590711R | RESOLVE | CLASS - 2 | FAILURE TO INSTITUTE&MAINTAIN SAFETY EQUIPMENT MEASURES.ATO MY INSP RESPONDING TO COMPLAINT OF ELECTRICIAN HURTING HI... | $5,000 | $0 | Aug 11, 2022 |
| Aug 20, 2021 | 35590708X | RESOLVE | CLASS - 1 | BC3301.8.1 TAMPERING PROHIBITED ATO MY INSP OF NB UNDER CONST WHERE WORKER GOT INJURED@BSMT LEVEL.UPON ARRIVING TO AR... | $0 | $0 | Jul 21, 2022 |
| Aug 20, 2021 | 35590712Z | RESOLVE | CLASS - 1 | INADEQUATE SITESAFETY ORIENTATION.ATO M INSP OF ACTIVE NB I REQUESTED WORKERS SITESAFETY ORIENTATION UPON REVIEWING I... | $0 | $0 | Jul 21, 2022 |
| Aug 20, 2021 | 35590710P | RESOLVE | CLASS - 2 | FAILURE TO INSTITUTE&MAINTAIN SAFETY EQUIPMENT MEASURES.ATO MY INSP RESPONDING TO COMPLAINT OF ELECTRICIAN HURTING FI... | $0 | $0 | Jul 21, 2022 |
| Aug 20, 2021 | 35590709H | RESOLVE | CLASS - 1 | WORK DOESNT CONFORM TO APPROVED DOCS ATO MY INSP OF ACTIVE NB JOBSITE.I NOTICED 2EMERGENCY EXIT DOORS ON EXP2,4 BUILT... | $0 | $0 | Jul 21, 2022 |
| Aug 11, 2021 | 35575275Y | RESOLVE | CLASS - 1 | FAILURE TO NOTIFY THE DEPARTMENT OF AN ACCIDENT/INCIDENT THAT RESULTEDIN A FATALITY OR AN INJURY.NOTED:A WORKER GOT A... | $5,000 | $0 | Aug 18, 2022 |
| Jul 29, 2021 | 35585326Y | RESOLVE | CLASS - 2 | FAILURE TO INSTITUTE AND MAINTAIN SAFETY MEASURES.NOTE AT TIME OF INSPECTION RESPONDING TO AN INCIDENT WHERE A WORKER... | $5,000 | $0 | Jul 14, 2022 |
| Jul 29, 2021 | 35585327X | RESOLVE | CLASS - 1 | 3301.1.2 FIRE SAFETY MANAGER.AT TIME OF INSPECTION ON A NEW BUILDING SSM#M001121 JUNEL PARLAGE PERFOMING FIRE SAFETY ... | $2,500 | $0 | Jul 14, 2022 |
| Jul 15, 2021 | 35585184H | RESOLVE | CLASS - 1 | FAILURE TO NOTIFY THE DEPARTMENT OF AN ACCIDENT/INCIDENT THAT RESULTEDIN A FATALITY OR AN INJURY.NOTE A WORKER TRIPPE... | $2,500 | $0 | Oct 28, 2021 |
| Jun 29, 2021 | 35575605H | RESOLVE | CLASS - 1 | FAILURE TO INSTITUTE AND MAINTAIN SAFETY EQUIPMENT MEASURES AND TEMPORARY CONSTRUCTION EQUIPMENT.NOTE:AT TIME OF INSP... | $5,000 | $0 | Nov 4, 2021 |
| May 14, 2021 | 35559376N | RESOLVE | CLASS - 1 | COMMUNICATE REQURIED INFORMATION DURING PRE-SHIFT SAFETY MEETING.NOTE IN RESPONSE TO INCIDENT WHERE WORKER GOT INJURE... | $0 | $0 | Jun 16, 2022 |
| May 14, 2021 | 35559375L | RESOLVE | CLASS - 1 | 3316.9.2 CERTIFICATION OR TRAINING(SAFETY MEASURES)NOTE IN RESPONSE TOINCIDENT WHERE WORKER GOT INJURED.I OBSERVED 6 ... | $0 | $0 | Jun 16, 2022 |
| May 14, 2021 | 39041249J | RESOLVE | CLASS - 1 | A STEEL BEAM WAS IN THE PROCESS OF BEING HOISTED WHEN WORKER MICHAEL FLORENTINO GOT HIS FINGER CAUGHT BETWEEN THE RIG... | $10,000 | $0 | Jul 1, 2021 |
| May 14, 2021 | 39041250R | RESOLVE | CLASS - 2 | A STEEL BEAM WAS IN THE PROCESS OF BEING HOISTED WHEN WORKER MICHAEL FLORENTINO GOT HIS FINGER CAUGHT BETWEEN THE RIG... | $2,500 | $0 | Jul 1, 2021 |
| Feb 17, 2021 | 35549125J | RESOLVE | CLASS - 1 | BC 3303.11 FAILURE TO MAINTAIN PERMANENT STAIRS. AS NOTED:AT TIME OF INSPECTION FOR AN ACTIVE CONSTRUCTION SITE DURIN... | $1,250 | $0 | Jul 29, 2021 |
| Sep 5, 2020 | 35509811N | RESOLVE | CLASS - 1 | BC 3301.2 FAILURE TO MAINTAIN(REBAR CAP). NOTE:AT TIME OF MY INSPECTION OF A PROPOSED 6 STORIES NEW BUILDING UNDER CO... | $0 | $0 | Aug 5, 2021 |
| Sep 5, 2020 | 35509813R | RESOLVE | CLASS - 1 | FAILURE TO COMMUNICATE REQUIRED INFORMATION DURING PRE SHIFT SAFETY MEETING. NOTE:AT TIME OF MY INSPECTION OF A PROPO... | $5,000 | $0 | Apr 22, 2021 |
| Sep 5, 2020 | 35509812P | RESOLVE | CLASS - 2 | FAILURE TO MAINTAIN ADEQUATE HOUSEKEEPING. NOTE:AT TIME OF MY INSPECTION OF A PROPOSED 6 STORIES NEW BUILDING UNDER C... | $0 | $0 | Nov 12, 2020 |
| May 12, 2020 | 35480917P | RESOLVE | CLASS - 1 | FAILURE TO NOTIFY THE DEPT OF AN INCIDENT OF AN INCIDENT/ACCIDENT THATRESULTED IN A FATALITY OR INJURY. A WORKER WAS ... | $0 | $0 | Aug 6, 2020 |
| Mar 12, 2020 | 35491975R | RESOLVE | CLASS - 1 | FAILURE TO NOTIFY THE DEPARTMENT OF AN OR INCIDENT THAT RESISTED IN A FATALITY OR INJURY.A WORKER WAS GOING DOWN STAI... | $0 | $0 | Jul 16, 2020 |
| Mar 12, 2020 | 35471924Z | RESOLVE | CLASS - 1 | PARTIAL STOP WORK FOR STAIR TOWER ALLOWED ONLY TO RELOCATE & PROVIDE EGRESS CLEAR OF OBSTRUCTION. NOTE AT TIME OF INS... | $1,250 | $0 | Jul 6, 2020 |