53-61 West 95 Street, Manhattan
Manhattan • Block 01209 • Lot 0109 • Zip: 10025
Condition
What the city currently has open against this building, counted from its own records.
Address
Land use and zoning
Building
Latest assessment
Neighborhood
The area this lot falls inside, and the commute Hoodkit measures from it.
Getting around
Estimated 3 days ago- Times Square 14 min 2 walking, 12 riding
- Penn Station 16 min 2 walking, 14 riding
- Grand Central 21 min 2 walking, 19 riding
- Union Square 26 min 2 walking, 24 riding
- Fulton Street 27 min 2 walking, 25 riding
- Downtown Brooklyn 34 min 2 walking, 32 riding
Around this address
Transit and places within 0.5 miles of the lot.
Getting out
Subway
Railroad
Ferry
Bus
Citi Bike
Places nearby
Chick Chick
Ramen, Korean fried chicken & other Asian offerings are available in a down-to-earth establishment.
Barney Greengrass
Jewish deli institution since 1908, known for smoked fish & not taking credit cards.
Baazi NYC
No description yet
Holy Schnitzel
No description yet
Bella Luna
No description yet
Water & Wheat
No description yet
Dagon
No description yet
Bodega 88
Urban sports pub offering Latin-inspired small plates & weekend brunch along with sangria & mojitos.
Activity
Sales, filings, permits and violations from every dataset, in one order.
2026
2025
2022
-
DOB violation Mar 16, 2022
AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE
FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
-
DOB violation Mar 16, 2022
AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE
FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
-
DOB violation Mar 16, 2022
AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE
FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
-
DOB violation Feb 16, 2022
AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE
FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
2021
-
CLASS - 1
I OBSERVED IN BASEMENT IN THE LAUNDRY ROOM USING RESIDENTIAL FLEX HOSES ON 5 COMMERCIAL GAS DRYERS. ALSO. VENT TO DRY...
-
CLASS - 1
FAILURE TO MAINTAIN BUILDING IN CODE COMPLAINT MANNER I OBSERVED IN BASEMENT IN THE LAUNDRY ROOM USING RESIDENTIAL FL...
-
CLASS - 1
FAILURE TO HAVE NEW OR ALTERED PLUMBING SYSTEM TESTED I OBSERVED IN THE BASEMENT FIVE COMMERCIAL GAS DRYERS INSTALLED...
-
CLASS - 1
GAS BEING SUPPLIED TO BUILDING WITHOUT INSPECTION AND CERTIFICATION BY DOB I OBSERVED IN THE BASEMENT IN THE LAUNDRY ...
-
CLASS - 1
WORK WITHOUT A PERMIT I OBSERVED IN THE BASEMENT IN THE LAUNDRY ROOM INSTALLED GAS LINES AND GAS VALVES FOR FIVE COMM...
2020
-
Alteration Type II
LIMITED CORNER REPAIR PROJECT. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
-
DOB violation Jul 23, 2020
E-ELEVATOR ELEVATORREQUIRED
-
DOB violation Jul 23, 2020
E-ELEVATOR ELEVATORREQUIRED
2019
-
HPD violation Jun 10, 2019
Class A
§ 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION ALL RADIATORS AND RISERES LOCATED AT APT 44, 3rd S...
-
HPD violation Jun 10, 2019
Class C
§ 27-2005 ADM CODE REPLACE WITH NEW THE BROKEN OR DEFECTIVE GLASS PANE AT FIRST WINDOW FROM NORTH AT EAST IN THE 3rd ...
-
HPD violation Jun 10, 2019
Class A
§ 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE CEILING LIGHT FIXTURE IN THE 1st ROOM FROM NORTH AT WEST L...
-
HPD violation Jun 10, 2019
Class A
§ 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE CEILING LIGHT FIXTURE IN THE FOYER LOCATED AT APT 44, 3rd ...
-
HPD violation Jun 10, 2019
Class A
§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL WALLS AND CEILINGS AND A...
-
HPD violation Jun 10, 2019
Class B
§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE REGLAZE BATHTUB IN THE BATHROOM LOCA...
2018
-
Alteration Type II
REPLACE BOILER AND OIL BURNER WITH BOILER AND GAS/OIL BURNER. INSTALL NEW METAL CHIMNEY AS PER PLANS. NO CHANGE IN US...
2017
-
Alteration Type II
FACADE REPAIRS AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
-
Alteration Type II
INSTALLATION OF NEW DUCTLESS SPLIT AIR CONDITIONING SYSTEM, CONDENSING UNIT AND ASSOCIATED PIPING AS PER PLANS FILED ...
2016
-
Alteration Type III
INSTALLATION OF HEAVY DUTY SIDEWALK SHED & OVERHEAD PROTECTION (IF NEEDED) AS PER PLANS. LIVE LOAD 300 PSF. SIDEW...
-
Alteration Type III
INSTALLATION OF HEAVY DUTY SIDEWALK SHED & OVERHEAD PROTECTION AS PER PLANS. LIVE LOAD 300 PSF. SIDEWALK SHED SHA...
2013
-
CLASS - 2
USES NOT PERMITTED: FLEXIBLE CORDS AND CABLES SHALL NOT BE USED FOR THE FOLLOWING: AS A SUBSTITUTE FOR THE FIXED WIRI...
The most recent 6 events from each dataset, so no one source takes the axis. Each tab holds the full record.
Property Contacts
Contact information aggregated from multiple government sources
Registration Contracts
Contact information from multiple dwelling registrations
Building Permits
Owner information from Department of Buildings filings
Recent Building Permits
Owner information from recent DOB NOW filings
Deed Records
Parties from ACRIS deed and mortgage records
Property Records
Owner information from assessment and PLUTO records