Skip to content

Job filings

11-31 East 42 Street, Manhattan • Block 01277 • Lot 0014

534 records

Work filed with the Department of Buildings under its legacy BIS system.

Latest action Job Type Status Work Cost Owner
Sep 16, 2015 122039338 Alteration Type II SIGNED OFF MODIFICATION OF THE EXISTING CLASS E FIRE ALARM SYSTEM ON THE 34TH FLOOR AS PER PLANS FILED HEREWITH. $17,000 VORNADO OFFICE MANAGEMENT
Aug 10, 2015 140306256 Alteration Type III SIGNED OFF FIRE PROTECTION PLAN FOR ENTIRE BUILDING $1,000 VORNADO OFFICE MANAGEMENT
Aug 10, 2015 122205050 Alteration Type II SIGNED OFF REMOVAL OF SPRINKLER HEADS AND CAP PIPING, AND INSTALLATION/REMOVAL OF SPRINKLER HEADS FOR TEMPORARY CORE SPRINKLER P... $29,450 VORNADO OFFICE MANAGEMENT
Aug 7, 2015 122110606 Alteration Type II SIGNED OFF SPRINKLER SYSTEM MODIFICATIONS TO TENANT SPACE (POINT 72 ASSET MANAGEMENT) ON THE 33RD FLOOR AS PER PLANS FILED HEREW... $9,300 VORNADO OFFICE MANAGEMENT
Jul 28, 2015 122216137 Alteration Type II SIGNED OFF MECHANICAL AND PLUMBING CHANGES TO PRE-BUILT SPACE ON PART OF THE 31ST FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE I... $43,750 VORNADO OFFICE MANAGEMENT
Jul 28, 2015 122283741 Alteration Type II SIGNED OFF INTERIOR ARCHITECTURAL CHANGES TO TENANT SPACE (CAMBERVIEW) ON PART OF THE 20TH FLOOR AS PER PLANS FILED HEREWITH. NO... $120,160 VORNADO OFFICE MANAGEMENT
Jul 9, 2015 120402769 Alteration Type II SIGNED OFF RELOCATE EXISTING FIRE ALARM DEVICES IN 4TH FLOOR BATHROOMS PER PLANS FILED HEREWITH. NO CHANGE TO USE, OCCUPANCY OR ... $5,645 VORNADO OFFICE MANAG
Jul 9, 2015 120402778 Alteration Type II SIGNED OFF RELOCATE EXISTING FIRE ALARM DEVICES IN 10TH FLOOR BATHROOMS PER PLANS FILED HEREWITH. NO CHANGE TO USE, OCCUPANCY OR... $4,932 VORNADO OFFICE MANAG
Jul 9, 2015 122173334 Alteration Type II SIGNED OFF INTERIOR DEMOLITION OF NONLOADBEARING PARTITIONS ON THE 2ND FLOOR, REMOVAL OF PLUMBING FIXTURES WITH EXISTING ROUGH-I... $4,500 VORNADO OFFICE MANAGEMENT
Jul 7, 2015 120522103 Alteration Type II SIGNED OFF INSTALL NEW SPRINKLER HEADS AND RELATED PIPING AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUP... $18,000 VORNADO OFFICE MANAGEMENT
Jul 7, 2015 120402251 Alteration Type II SIGNED OFF RELOCATE EXISTING FIRE ALARM DEVICES IN 3RD FLOOR BATHROOMS PER PLANS FILED HEREWITH. NO CHANGE TO USE, OCCUPANCY OR ... $5,645 VORNADO OFFICE MANAG
Jun 26, 2015 122256888 Alteration Type II SIGNED OFF SPRINKLER SYSTEM MODIFICATIONS TO TENANT SPACE (POINT 72 ASSET MANAGEMENT) ON THE 39TH FLOOR AS PER PLANS FILED HEREW... $56,090 VORNADO OFFICE MANAGEMENT
Jun 26, 2015 121953412 Alteration Type II SIGNED OFF MODIFICATION OF THE EXISTING CLASS E FIRE ALARM SYSTEM ON THE 24TH FLOOR AS INDICATED ON PLANS. $6,000 VORNADO OFFICE MANAGEMENT
Jun 26, 2015 121892390 Alteration Type II SIGNED OFF SPRINKER SYSTEM MODIFICATIONS TO CORE TOILET ROOMS ON FLOORS 12 AND 13 (12A) AS INDICATED ON PLANS. NO CHANGE IN USE,... $10,500 VORNADO OFFICE MANAGEMENT
Jun 23, 2015 121821653 Alteration Type II SIGNED OFF MODIFICATION OF THE EXISTING CLASS E FIRE ALARM SYSTEM ON THE 34TH FLOOR (VORNADO) AS INDICATED ON DRAWINGS. $2,000 VORNADO OFFICE MANAGEMENT
Jun 22, 2015 122149479 Alteration Type II SIGNED OFF MODIFICATIONS TO EXISTING SPRINKLER AND STANDPIPE SYSTEM AS INDICATED ON PLANS FILED HEREWITH. INSTALLATION OF TEMPOR... $128,000 VORNADO OFFICE MANAGEMENT,LLC
Jun 16, 2015 121891578 Alteration Type II SIGNED OFF MECHANICAL AND PLUMBING CHANGES TO CORE TOILET ROOMS ON FLOORS 12 AND 13 (12A) AS INDICATED ON PLANS. NO CHANGE IN US... $188,435 VORNADO OFFICE MANAGEMENT
May 20, 2015 121953421 Alteration Type II SIGNED OFF MODIFICATION OF THE EXISTING CLASS E FIRE ALARM SYSTEM ON THE 23RD FLOOR AS INDICATED ON PLANS. $6,000 VORNADO OFFICE MANAGEMENT
Apr 2, 2015 122172978 Alteration Type II SIGNED OFF MECHANICAL AND PLUMBING CHANGES TO BUILDING MANAGEMENT OFFICE ON PART OF THE 2ND FLOOR AS PER PLANS FILED HEREWITH. N... $55,500 VORNADO OFFICE MANAGEMENT
Apr 2, 2015 122021631 Alteration Type II SIGNED OFF INSTALLATION OF AUTOMATIC SMOKE DETECTION SYSTEM FOR PRE-ACTION SPRINKLER FOR THE 13TH FLOOR (TENANT FLOOR 12A ) AS P... $36,800 VORNADO OFFICE MANAGEMENT
Apr 2, 2015 122184723 Alteration Type II SIGNED OFF SPRINKLER SYSTEM MODIFICATIONS TO BUILDING MANAGEMENT OFFICE ON PART OF THE 2ND FLOOR AS PER PLANS FILED HEREWITH. NO... $9,750 VORNADO OFFICE MANAGEMENT
Mar 25, 2015 121802790 Alteration Type II SIGNED OFF REMOVAL OF EXISTING COLUMN ENCLOSURES AND APPLICATION OF SPRAY-ON FIREPROOFING TO INTERIOR COLUMNS ON THE 14TH AND 31... $29,000 VORNADO OFFICE MANAGEMENT
Mar 25, 2015 120647087 Alteration Type II SIGNED OFF SPRINKLER CHANGES ON PART OF THE CELLAR AS INDICATED ON DRAWINGS. NO CHANGE IN USE EGRESS OR OCCUPANCY. NO CHANGE TO ... $7,150 VORNADO OFFICE MANAGEMENT
Mar 25, 2015 121336875 Alteration Type II SIGNED OFF MECHANICAL & PLUMBING MODIFICATIONS AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. $1,288,000 VORNADO REALTY TRUST
Mar 16, 2015 121957846 Alteration Type II SIGNED OFF MODIFICATION TO EXISTING FIRE ALARM SYSTEM ON THE 13TH FLOOR (TENANT FLOOR 12A) AS PER PLANS FILED HEREWITH. NO CHANG... $248,600 VORNADO OFFICE MANAGEMENT
Mar 13, 2015 121961378 Alteration Type II SIGNED OFF REMOVAL AND INSTALLATION OF INTERIOR NON BEARING PARTITIONS AND RELATED FINISHES AS PER PLANS FILED HEREWITH. NO CHAN... $2,714,942 VORNADO OFFICE MANAGEMENT
Mar 5, 2015 120402242 Alteration Type II SIGNED OFF INSTALL NEW EVICES IN 24TH FLOOR BATHROOMS AND CONNECT TO EXISTING MODIFIED CLASS E FIRE ALARM PER PLANS FILED HEREWI... $3,267 VORNADO OFFICE MANAG
Mar 4, 2015 122074138 Alteration Type II SIGNED OFF MECHANICAL AND PLUMBING CHANGES TO TENANT SPACE (ZELMAN & ASSOCIATES) ON PART OF THE 34TH FLOOR AS PER PLANS FILE... $86,250 VORNADO OFFICE MANAGEMENT
Feb 27, 2015 122074110 Alteration Type II SIGNED OFF SPRINKLER SYSTEM MODIFICATIONS TO TENANT SPACE (ZELMAN & ASSOCIATES) ON PART OF THE 34TH FLOOR AS PER PLANS FILED... $76,800 VORNADO OFFICE MANAGEMENT
Feb 25, 2015 121641072 Alteration Type II SIGNED OFF MODIFICATION OF THE EXISTING CLASS E FIRE ALARM SYSTEM ON THE 14TH AND 31ST FLOOR (CORE TOILETS) AS INDICATED ON DRAW... $4,000 VORNADO OFFICE MANAGEMENT
Feb 23, 2015 121931142 Alteration Type II SIGNED OFF SPRINKLER SYSTEM MODIFICATIONS TO PUBLIC CORRIDOR ON THE 31ST FLOOR AS INDICATED ON PLANS. NO CHANGE IN USE, EGRESS O... $6,500 VORNADO OFFICE MANAGEMENT
Feb 18, 2015 121969254 Alteration Type II SIGNED OFF REMOVAL OF EXISTING SPRINKLER HEADS AND INSTALLATION OF TEMPORARY CORE SPRINKLER PROTECTION AS PER PLANS FILED HEREWI... $85,500 VORNADO OFFICE MANAGEMENT
Feb 17, 2015 121962938 Alteration Type II SIGNED OFF SPRINKLER SYSTEM MODIFICATIONS TO TENANT SPACE ON THE 23RD FLOOR (HG VORA CAPITAL MANAGEMENT) AS INDICATED ON PLANS. ... $19,000 VORNADO OFFICE MANAGEMENT
Feb 17, 2015 121956311 Alteration Type II SIGNED OFF SPRINKLER SYSTEM MODIFICATIONS TO TENANT SPACE ON PART OF THE 24TH FLOOR (KOKINO) AS INDICATED ON PLANS. NO CHANGE IN... $13,000 VORNADO OFFICE MANAGEMENT
Feb 17, 2015 121956320 Alteration Type II SIGNED OFF ARCHITECTURAL CHANGES TO TENANT SPACE ON PART OF THE 24TH FLOOR (KOKINO) AS INDICATED ON PLANS. NO CHANGE IN USE, EGR... $286,300 VORNADO OFFICE MANAGEMENT
Feb 17, 2015 121956268 Alteration Type II SIGNED OFF ARCHITECTURAL CHANGES TO TENANT SPACE ON THE 23RD FLOOR (HG VORA CAPITAL MANAGEMENT) AS INDICATED ON PLANS. NO CHANGE... $132,500 VORNADO OFFICE MANAGEMENT
Feb 13, 2015 121916506 Alteration Type II SIGNED OFF SPRINKLER SYSTEM MODIFICATIONS TO TENANT SPACE ON THE 31ST FLOOR (ERICSSON) AS INDICATED ON PLANS. NO CHANGE IN USE, ... $19,000 VORNADO OFFICE MANAGEMENT
Feb 13, 2015 121832687 Alteration Type II SIGNED OFF SPRINKLER CHANGES TO CORE TOILETS ON 34TH FLOOR (VORNADO) AS INDICATED ON DRAWINGS. NO CHANGE IN USE, EGRESS OR OCCUP... $4,100 VORNADO OFFICE MANAGEMENT
Feb 5, 2015 110161164 Alteration Type II SIGNED OFF STRUCTURAL MODIFICATIONS ON PART OF THE 29TH AND 30TH FLOOR AS INDICATED ON DRAWINGS. $42,000 VORNADO OFFICE MANAGEMENT
Feb 3, 2015 121851852 Alteration Type II SIGNED OFF MECHANICAL AND PLUMBING CHANGES TO TENANT SPACE (TIGER LEGATUS) ON THE 24TH FLOOR AS INDICATED ON DRAWINGS. NO CHANGE... $69,000 VORNADO OFFICE MANAGEMENT
Jan 30, 2015 121961396 Alteration Type II SIGNED OFF MODIFICATION TO EXISTING SPRINKLER SYSTEM AND PRE-ACTION SPRINKLER SYSTEM AS PER PLANS FILED HEREWITH. NO CHANGE IN U... $203,400 VORNADO OFFICE MANAGEMENT
Jan 15, 2015 121519400 Alteration Type II SIGNED OFF MODIFICATION TO EXISTING FIRE ALARM SYSTEM AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER T... $2,000 VORNADO OFFICE MANAGEMENT
Dec 8, 2014 140289417 Alteration Type II PLAN EXAM - IN PROCESS SPRINKLER SYSTEM MODIFICATIONS TO BUILDING MANAGEMENT OFFICE ON PART OF THE 2ND FLOOR AS PER PLANS FILED HEREWITH. NO... $9,750 VORNADO OFFICE MANAGEMENT
Nov 6, 2014 121926354 Alteration Type II SIGNED OFF REMOVAL OF EXISTING COLUMN ENCLOSURES AND REPLACEMENT OF SPRAYED FIRE-RESISTANT MATERIALS ON INTERIOR COLUMNS ON THE ... $4,850 VORNADO OFFICE MANAGEMENT
Oct 27, 2014 121694381 Alteration Type II SIGNED OFF MECHANICAL AND PLUMBING CHANGES TO CORE TOILETS ON THE 14TH AND 31ST FLOOR AS INDICATED ON DRAWINGS. NO CHANGE IN USE... $74,000 VORNADO OFFICE MANAGEMENT
Oct 22, 2014 121804155 Alteration Type II SIGNED OFF SPRINKLER CHANGES TO PUBLIC CORRIDOR AND TENANT SPACE (CHIMNEY ROCK) ON THE 23RD FLOOR AS INDICATED ON DRAWINGS. NO C... $28,405 VORNADO OFFICE MANAGEMENT
Oct 16, 2014 121068986 Alteration Type II SIGNED OFF PARTITION CHANGES ON THE 8TH FLOOR(CORE BATHROOMS) AS INDICATED ON DRAWINGS. NO CHANGE IN USE EGRESS OR OCCUPANCY. NO... $52,000 VORNADO OFFICE MANAGEMENT
Oct 7, 2014 121072784 Alteration Type II SIGNED OFF MECHANICAL AND PLUMBING CHANGES ON THE 11TH FLOOR (CORE BATHROOMS) AS INDICATED ON DRAWINGS. NO CHANGE IN USE EGRESS ... $78,000 VORNADO OFFICE MANAGEMENT
Oct 6, 2014 121892265 Alteration Type II SIGNED OFF SPRINKLER SYSTEM MODIFICATIONS TO PUBLIC CORRIDOR ON THE 24TH FLOOR AS INDICATED ON PLANS. NO CHANGE IN USE, EGRESS O... $8,500 VORNADO OFFICE MANAGEMENT
Oct 6, 2014 121892274 Alteration Type II SIGNED OFF ARCHITECTURAL CHANGES TO PUBLIC CORRIDOR ON THE 24TH FLOOR AS INDICATED ON PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. $35,800 VORNADO OFFICE MANAGEMENT