DOB violations
246-248 East 45 Street, Manhattan • Block 01318 • Lot 0030
9 records
Violations issued by the Department of Buildings.
| Issued | Violation | Type | Category | Description | Disposed |
|---|---|---|---|---|---|
| Jun 3, 2025 | PI10609SB | C-CONSTRUCTION OTHER OPTIONAL | V*-DOB VIOLATION - DISMISSED | FTC W/COMMISSIONER'S ORDER CONTROL#342007 & VIO#032525PI10603SB DATED 03/25/2025 REQUIRING OWNER TO SUBMIT CORRECTIVE... | Oct 21, 2025 |
| Mar 25, 2025 | PI10603SB | C-CONSTRUCTION OTHER OPTIONAL | V*-DOB VIOLATION - DISMISSED | FAILURE TO MAINTAIN BLDG IN A CODE COMPLIANT MANNER.OBSERVED AT EXPOSURE 1,SPALLING/CRACKED STONE BETWEEN FLOORS 2-3 ... | Oct 21, 2025 |
| Sep 12, 2024 | 00015 | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | V*-DOB VIOLATION - DISMISSED | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION | Oct 2, 2024 |
| Jun 30, 2023 | 02507 | HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED | V*-DOB VIOLATION - DISMISSED | VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL HGH PRESSURE INSPECTION | Jul 22, 2024 |
| Jun 30, 2023 | 03636 | HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED | V*-DOB VIOLATION - DISMISSED | VIOLATION ISSUED-FAILURE TO FILE 2021 INTERNAL HGH PRESSURE INSPECTION | Aug 15, 2023 |
| Jun 20, 2023 | 02224 | HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED | V*-DOB VIOLATION - DISMISSED | VIOLATION ISSUED-FAILURE TO FILE 2018 INTERNAL HGH PRESSURE INSPECTION | Sep 13, 2023 |
| Mar 16, 2020 | 00188 | HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED | V*-DOB VIOLATION - DISMISSED | VIOLATION ISSUED - FAILURE TO FILE 2017 EXTERNAL HIGH PRESSURE BOILER INSPECTION | Sep 13, 2023 |
| Jun 23, 2017 | 00065 | HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED | V*-DOB VIOLATION - DISMISSED | VIOLATION ISSUED FOR FAILURE TO FILE 2015 ANNUAL HIGH PRESSURE BOILER INSPECTION | Sep 13, 2023 |
| Nov 16, 2016 | 00036 | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | V*-DOB VIOLATION - DISMISSED | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION | Jan 9, 2017 |