Skip to content

ECB violations

416 East 50 Street, Manhattan • Block 01361 • Lot 0142

7 records

Environmental Control Board violations, which carry a hearing and a penalty.

Issued Violation Status Severity Description Penalty Balance due Hearing
Apr 16, 2025 39145151H RESOLVE CLASS - 1 ATOI ON AN ACTIVE JOBSITE, OBSERVED PLUMBING WORK/ BEING DONE THROUGHOUT THE ENTIRE PREMISES&/PLUMBING WORK WITH NO P... $0 $0 Jun 5, 2026
Apr 16, 2025 39145113R RESOLVE CLASS - 1 OBSERVED DEMO/STRUCTURAL WORK IN PROGRESS BETWEEN FLOORS W/ TEMPORARY MAKESHIFT FLOORS EXPOSED PLUMBING PIPES & LINES... $2,500 $2,500 Jun 5, 2026
Apr 16, 2025 39145145L RESOLVE CLASS - 1 ATOI ON AN ACTIVE JOBSITE, OBSERVED TREMENDOUS AMOUNT OF DEBRIS THROUGHOUT THE ENTIRE 1ST FLOOR.DEBRIS WAS PILED UP 8... $2,500 $2,500 Jun 5, 2026
Apr 16, 2025 39145148R RESOLVE CLASS - 1 ATOI OBSERVED SPLIT A/C HVAC UNIT INSTALLED WIRED WITH CONNECTION TO AN ELECTRICAL DISCONNECT BOX TO SUPPLY POWER TO ... $2,500 $2,500 Jun 5, 2026
Apr 16, 2025 39145165Z RESOLVE CLASS - 1 ATOI ON AN ACTIVE JOBSITE, OBSERVED ELECTRICAL WORK WAS PERFORMED THROUGHOUT THE ENTIRE PREMISES. DEMO/ALT IN PROGRES... $1,600 $1,600 Jun 5, 2026
Apr 16, 2025 39145171P RESOLVE CLASS - 1 ATOI ON AN ACTIVE JOBSITE, OBSERVED PLUMBING WORK WAS PERFORMED, AT BASEMENT/1ST & 2ND FL. OBSERVED FAILURE TO HAVE N... $0 $0 Jun 5, 2026
Apr 16, 2025 39145159M RESOLVE CLASS - 2 ATOI OBSERVED THAT AT BASEMENT INADEQUATE MAINTENANCE OF PLUMBING SYSTEM AND IMPROPER INSTALLATION OF FLUE PIPE CONNE... $0 $0 Jun 5, 2026