35-45 Sutton Place, Manhattan
Manhattan • Block 01372 • Lot 0073 • Zip: 10022
Condition
What the city currently has open against this building, counted from its own records.
Address
Land use and zoning
Building
Latest assessment
Neighborhood
The area this lot falls inside, and the commute Hoodkit measures from it.
Getting around
Estimated 3 days ago- Grand Central 9 min 4 walking, 5 riding
- Union Square 15 min 4 walking, 11 riding
- Times Square 16 min 4 walking, 12 riding
- Penn Station 22 min 4 walking, 18 riding
- Fulton Street 23 min 4 walking, 19 riding
- Downtown Brooklyn 31 min 4 walking, 27 riding
Around this address
Transit and places within 0.5 miles of the lot.
Getting out
Subway
Railroad
Ferry
Bus
Citi Bike
Places nearby
Lungi
No description yet
Lenox Thai
No description yet
Animo!
Mexican restaurant
Cafe Mandarin
No description yet
P.J. Clarke's
Burgers & other American comfort food in down-to-earth digs with a lively atmosphere.
No Work Allowed
No description yet
Ánimo
No description yet
Jabä
No description yet
Activity
Sales, filings, permits and violations from every dataset, in one order.
2026
-
DOB violation Aug 6, 2026
C-CONSTRUCTION OTHER OPTIONAL
UNABLE TO CONTACT GENERAL CONTRACTOR TO VERIFY THAT WORK UNDER JOB #M01344088-I1-GC IS BEING DONE IN COMPLIANCE WITH ...
-
HPD violation Apr 29, 2026
Class A
(A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION ...
2025
-
HPD violation Nov 17, 2025
Class I
§27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27...
-
CLASS - 2
AT THE TIME OF INSPECTION, REPAIRED CRACKS NO CLASS ONE CONDITION. HOWEVER, FAILURE TO CERTIFY CORRECTION FOR VIOLATI...
2024
-
Alteration Type II
MINOR INTERIOR PARTITION CHANGES WITH PLUMBING AND MECHANICAL WORK AT THE 16TH FLOOR. NO CHANGE TO USE, EGRESS OR OCC...
-
Alteration Type I
ADDING ADDITIONAL FLOOR AREA 76.25 SF BY INSTALLING GLASS ENCLOSURE ON EXISTING TERRACES AT PENTHOUSE B. NO OTHER WOR...
-
Alteration Type II
PARTITION AND PL CHANGES ON THE 11TH FL AS INDICATED ON DRAWINGS. NO CHANGE IN USE, ERGESS OR OCCUPANCY. NO CHANGE TO...
-
Alteration Type II
General construction and plumbing work on the 12th floor as per plans filed herewith. No change in use, egress or occ...
-
Alteration Type III
INSTALLATION OF APPROXIMATELY 136 L.F. OF HEAVY DUTY SIDEWALK SHED. SHED IS DESIGNED FOR A LIVE LOAD OF 600 PSF. MAXI...
-
Alteration Type III
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED FILED FOR REMEDIAL REPAIRS AS PER PLANS. NO CHANGE IN USE OCCUPANCY...
2023
-
DOB violation Oct 4, 2023
AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE
FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
-
CLASS - 2
I OBSERVED NEW TEMPORARY DISTRIBUTION PANEL AND FEEDER CONDUCTORS LOCATED ON ROOF STAIRWAY BEEN FEED BY BOTH GENERATO...
-
CLASS - 1
FAILURE TO MAINTAIN BUILDING IN CODE COMPLAINT MANNER. OBSERVED AT PARKING GARAGE STRUCTURE, HORIZONTAL CRACK AT THE ...
-
CLASS - 2
FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER. OBSERVED AT THE PARKING GARAGE, SUB CELLAR LEVEL THREE ELECTRI...
-
DOB violation Apr 20, 2023
C-CONSTRUCTION OTHER OPTIONAL
FAILURE TO MAINTAIN BUILDING IN CODE COMPLAINT MANNER. OBSERVED AT PARKING GARAGE STRUCTURE, HORIZONTAL CRACK AT THE ...
-
CLASS - 2
FAILURE TO MAINTAIN EXTERIOR FACADE & APPURTENANCES ON EXP #2(NORTH ELEVATION) NORTH EAST CORNER OF APROX 19TH OR 20T...
2021
2020
2019
-
DOB violation Apr 13, 2019
E-ELEVATOR ELEVATORREQUIRED
-
DOB violation Apr 13, 2019
E-ELEVATOR ELEVATORREQUIRED
-
DOB violation Apr 13, 2019
E-ELEVATOR ELEVATORREQUIRED
2017
-
CLASS - 2
56Y13,02T07,60B10,68M07. 56Y13-MACHINE LEAKS, SEAL; 02T07-PROVIDE IN CAR COMMUNICATION INSTRUCTION; 60B10-MOTOR ROOM ...
2015
-
HPD violation Nov 24, 2015
Class A
SECTION 27-2104 ADM CODE POST AND MAINTAIN A PROPER SIGN ON WALL OF ENTRANCE STORY SHOWING THE REGISTRATION NUMBER AS...
2009
-
HPD violation Aug 18, 2009
Class B
SECTION 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE EXTERIOR BALONCY WALL CONCRETE...
The most recent 6 events from each dataset, so no one source takes the axis. Each tab holds the full record.
Property Contacts
Contact information aggregated from multiple government sources
Registration Contracts
Contact information from multiple dwelling registrations
Building Permits
Owner information from Department of Buildings filings
Recent Building Permits
Owner information from recent DOB NOW filings
Deed Records
Parties from ACRIS deed and mortgage records
Property Records
Owner information from assessment and PLUTO records