Job filings
48-52 East 62 Street, Manhattan • Block 01376 • Lot 0042
23 records
Work filed with the Department of Buildings under its legacy BIS system.
| Latest action | Job | Type | Status | Work | Cost | Owner |
|---|---|---|---|---|---|---|
| Nov 24, 2017 | 120932456 | Alteration Type I | SIGNED OFF | — | $2,620,000 | THE BROWNING SCHOOL |
| Oct 2, 2017 | 122957657 | Place of Assembly | COMPLETED | — | $0 | THE BROWNING SCHOOL |
| Nov 21, 2016 | 121721583 | Alteration Type II | SIGNED OFF | PLUMBING WORK AS SHOWN ON PLANS FILED HEREWITH | $93,823 | THE BROWNING SCHOOL |
| Oct 14, 2016 | 122149790 | Alteration Type II | SIGNED OFF | INSTALL 2 NEW BOILERS AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY. | $100,000 | THE BROWNING SCHOOL |
| Jul 12, 2016 | 120718394 | Alteration Type III | SIGNED OFF | INSTALLATION OF A SCAFFOLD APPROXIMATELY 36'HIGH WITH NETTING,STAIR TOWER (FIELD LOCATED) AND ACCESS LADDER AS PER PL... | $0 | PERIMETER BRIDGE & SCAFFOLD |
| Jun 16, 2016 | 121851781 | Alteration Type II | SIGNED OFF | RELOCATE, REMOVE AND ADD SPRINKLER HEADS AS SHOWN ON PLANS HEREWITH | $126,100 | THE BROWNING SCHOOL, INC |
| Jun 16, 2016 | 121079153 | Alteration Type II | SIGNED OFF | MANUAL/AUTOMATIC SMOKE/HEAT DETECTION SPRINKLER ALARM SYSTEM WITH TWO WAY VOIC E COMMNICATION AS PER FP INDEX INDEX #... | $6,250 | THE BROWNING SCHOOL |
| Aug 12, 2015 | 140104660 | Alteration Type III | SIGNED OFF | INSTALLATION OF PIPE SCAFFOLD AS PER PLAN. WORK SHALL COMPLY WITH 2008 BUILDING CODE CHAPTER 33. NO CHANGE IN USE, EG... | $0 | THE BROWNING SCHOOL C/O ARSENAL |
| Aug 12, 2015 | 121104134 | Alteration Type III | SIGNED OFF | PROPOSED INSTALLATION OF PLYWOOD FENCE ENCLOSURE FOR HOIST TROLLEY BEAM AND WORK PLATFORM FOR PEDESTRIAN PROTECTION P... | $0 | ARSENAL SCAF |
| Jan 26, 2015 | 121078564 | Alteration Type II | SIGNED OFF | SPRINKLER MODIFICATIONS AS SHOWN ON PLANS FILED HEREWITH | $7,000 | THE BROWNING SCHOOL |
| Oct 22, 2013 | 121723037 | Alteration Type II | SIGNED OFF | INSTALLATION OF TEMPORARY TENTS ON 62ND STREET FOR THE BROWNING SCHOOL 125TH BIRTHDAY CELEBRATION, SCHEDULED FOR OCTO... | $5,000 | THE BROWNING SCHOOL |
| Jun 18, 2013 | 120738078 | Alteration Type II | SIGNED OFF | STRUCTURAL WORK IN CONJUNCTION WITH INITIAL APPLICATION AS SHOWN ON PLANS FILED HEREWITH. | $90,000 | THE BROWNING SCHOOL, INC |
| Oct 18, 2012 | 103208388 | Alteration Type II | SIGNED OFF | Installation of new fire alarm devices in the cellar as indicated on plans. No change to use,egress or occupancy. | $3,000 | The Browning School |
| May 10, 2012 | 120749379 | Alteration Type II | SIGNED OFF | MODIFY EXISTING SPRINKLER SYSTEM AS SHOWN ON DRAWINGS SUBMITTED HEREWITH. | $13,000 | THE BROWNING SCHOOL, INC |
| Sep 21, 2011 | 120738158 | Alteration Type II | PERMIT ISSUED - ENTIRE JOB/WORK | MODIFICATIONS/ADDITIONS TO EXISTING FA SYSTEM | $3,000 | THE BROWNING SCHOOL, INC |
| Feb 4, 2009 | 102580477 | Alteration Type II | SIGNED OFF | INSTALLATION OF INDIVIDUALLY CODED INTER IOR FIRE ALARM SYSTEM. THERE IN NO CHANGE IN USE, EGRESS OR OCC UPANCY. | $8,000 | THE BROWNING SCHOOL |
| Sep 29, 2006 | 104317696 | Alteration Type II | SIGNED OFF | Install kitchen fire suppression system, as shown on plan. No chnage in use, occupancy, or egress. | $3,000 | The Browning School |
| Nov 5, 2004 | 103957130 | Alteration Type II | PLAN EXAM - APPROVED | Propose to construct new 1 hour partitions in wall as shown on plans filed herewith . No change to use,egress or occu... | $5,000 | The Browning School |
| Jul 15, 2003 | 103209369 | Alteration Type II | SIGNED OFF | Propose to install new mechanical ductwork and plumbing fixtures along with related piping in the cellar, as indicate... | $73,000 | The Browning School |
| Jun 24, 2003 | 103107371 | Alteration Type II | SIGNED OFF | Propose to demo existing partitions, ceilings, and doors. Install new partitions, ceiling and doorsin the cellar as i... | $95,000 | The Browning School |
| Aug 26, 2002 | 103208397 | Alteration Type II | PERMIT ISSUED - ENTIRE JOB/WORK | Propose to install new sprinkler heads along with related piping in the cellar, as indicated on plans.No change to us... | $11,000 | The Browning School |
| Aug 15, 2001 | 102779682 | Alteration Type II | SIGNED OFF | PROPOSE TO REMOVE PARTITIONS, CEILINGS AND INSTALL NEW STAIR. NO CHANGE TO USE EGRESS, OR OCCUPANCY. | $33,000 | THE BROWNING SCHOOL |
| Jun 8, 2000 | 102639227 | Alteration Type II | PERMIT ISSUED - ENTIRE JOB/WORK | Install new gas meter assembly and provide gas piping connecting to existing gas fired boiler burners. Remove and rel... | $19,000 | The Browng School |