Job filings
37-75 East 71 Street, Manhattan • Block 01386 • Lot 0033
99 records
Work filed with the Department of Buildings under its legacy BIS system.
| Latest action | Job | Type | Status | Work | Cost | Owner |
|---|---|---|---|---|---|---|
| Jan 11, 2024 | 123029132 | Alteration Type II | SIGNED OFF | RENOVATION OF EXISTING APARTMENT ON THE 2ND & 3RD FLOOR. WORK INCUDES GENERAL CONSTRUCTION AS PER PLANS FILED HER... | $209,000 | THE 740 CORPORATION |
| Sep 15, 2022 | 123848293 | Alteration Type II | SIGNED OFF | INSTALLATION OF VALVE ACCESS PLATFORM AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY. | $5,000 | 740 CORPORATION C/O BROWN HARRIS |
| Jul 12, 2022 | 140939616 | Alteration Type II | SIGNED OFF | RENOVATION OF EXISTING DOCTOR'S OFFICE IN UNIT 1D ON THE 1ST FLOOR. WORK INCLUDES NON-STRUCTURAL DEMOLITION, GENERAL ... | $108,000 | N/A |
| May 17, 2022 | 123718236 | Alteration Type II | SIGNED OFF | MECHANICAL AND PLUMBING MODIFICATIONS IN CONJUNCTION WITH APARTMENT 4/5D RENOVATION ON THE 4TH & 5TH FLOOR. NO CH... | $590,000 | THE E71 TRUST |
| Sep 22, 2021 | 121563085 | Alteration Type II | SIGNED OFF | INTERIOR RENOVATION INCLUDING REPLACEMENT OF PLUMBING FIXTURES, ADDITION OF GAS LOGS, AND REPLACEMENT OF EXISTING MEC... | $404,500 | VERA WANG BRIDAL HOUSE |
| Mar 31, 2021 | 123154362 | Alteration Type II | SIGNED OFF | FACADE RESTORATION AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY. | $474,607 | 740 CORPORATION C/O BROWN HARRIS |
| Feb 19, 2021 | 123291473 | Alteration Type III | SIGNED OFF | ERECT A TOTAL OF 40 LINEAR FEET BY 8-14 FEET APPROXIMATE HIGH HEAVY DUTY SIDEWALK SHED, PER DRAWINGS, RATED FOR 300 L... | $0 | NEW FORCE CONSTRUCTION CORP. |
| Dec 14, 2020 | 104507883 | Alteration Type II | SIGNED OFF | INTERIOR RENOVATION TO EXISTING APARTMENT AT PH LEVEL. RELOCATE PARTITIONS, REMOVE RELOCATE AND INSTALL NEW PLUMBING ... | $80,000 | BROWN HARRIS STEVENS |
| Nov 30, 2020 | 140733749 | Alteration Type III | SIGNED OFF | INSTALLATION OF MATERIAL HOIST AS PER PLANS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. HOIST TO COMPLY WITH NYC BC. | $0 | N/A |
| Jul 24, 2020 | 123471821 | Alteration Type II | SIGNED OFF | RENOVATION OF EXISTING DOCTOR'S OFFICE IN UNIT 1D ON THE 1ST FLOOR. REMOVAL OF PARTITIONS, PLUMBING FIXTURES, AND FIN... | $36,000 | N/A |
| Apr 3, 2020 | 123446191 | Alteration Type II | SIGNED OFF | PLUMBING AND MECHANICAL INSTALLATIONS IN CONJUNCTION WITH APT 6A/7A RENOVATIONS, AS PER PLANS FILED HEREWITH. | $1,416,000 | THE 740 CORPORATION |
| Feb 19, 2020 | 104742637 | Alteration Type II | SIGNED OFF | Renovation of an existing residential apartment with structural work as per plans filed herewith No change in use, oc... | $10,000 | The 740 Corporation |
| Jul 10, 2019 | 123067180 | Alteration Type II | SIGNED OFF | INTERIOR ALTERATION WORK: MINOR NON-STRUCTURAL DEMOLITION, NEW PARTITIONS AND FINISHES AS PER PLANS FILED HEREWITH. N... | $984,000 | THE 740 CORPORATION |
| Jun 25, 2019 | 122956202 | Alteration Type II | SIGNED OFF | APARTMENT 4B/5B:FILING HEREWITH FOR THE REMOVAL AND INSTALLATION OF INTERIOR NON LOAD BEARING PARTITIONS AND RELATED ... | $3,942,059 | THE 740 CORPORATION |
| Apr 9, 2019 | 123338708 | Alteration Type II | SIGNED OFF | PROPOSED RELOCATION OF EXISTING FIRE HOSE CABINET AND ASSOCIATED PIPING AS PER PLANS FILED HEREWITH. NO CHANGE OF USE... | $10,000 | THE 740 CORPORATION |
| Mar 8, 2019 | 120877444 | Alteration Type III | SIGNED OFF | ERECT A TOTAL OF 40 LINEAR FEET BY 15 FEET APPROXIMATE HEIGHT OF TUBULAR FEET SCAFFOLD STRUCTURE, PER DRAWINGS. INSTA... | $0 | NEW FORCE CONSTRUCTION CORP. |
| Mar 8, 2019 | 110480355 | Alteration Type III | SIGNED OFF | ERECT A TEMPORARY CONSTRUCTION FENCE BENEATH SIDEWALK SHED TO ENCLOSED STAIR TOWER FROM SIDEWALK TO SIDEWALK SHED DEC... | $0 | 740 CORP |
| Mar 8, 2019 | 121132693 | Alteration Type III | SIGNED OFF | ERECT A TOTAL 20 LINEAR FEET LONG BY 7 FEET WIDE PLYWOOD CONSTRUCTION FENCE. INSTALLATION COMPLY WITH BSA- 351-74-SM,... | $0 | NEW FORCE CONSTRUCTION CORP. |
| Mar 7, 2019 | 123239619 | Alteration Type II | SIGNED OFF | SUBSEQUENT FILING OF MECHANICAL WORK AS PER PLANS FILED HEREWITH. NO CHANGE OF USE, EGRESS OR OCCUPANCY | $164,000 | THE 740 CORPORATION |
| Feb 13, 2019 | 121228411 | Alteration Type II | SIGNED OFF | MINOR INTERIOR RENOVATION OF MASTER DRESSING ROOM AND BATHROOM ON THE 16TH FLOOR OF EXISTING APARTMENT #15B. WORK TO ... | $273,000 | N/A |
| Jun 25, 2018 | 122331351 | Alteration Type II | SIGNED OFF | MECHANICAL AND PLUMBING WORK AS PER PLANS. NO CHANGE TO USE, EGRESS, OR OCCUPANCY. | $320,000 | THE 740 CORPORATION |
| May 2, 2018 | 140349111 | Alteration Type II | SIGNED OFF | INSTALLATION OF AN ADT MATERIAL ACCESS SYSTEM ON LEVEL 12 AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER T... | $0 | GREG LOGISTICS LLC |
| Jan 23, 2018 | 122875237 | Alteration Type II | SIGNED OFF | REMOVE AND REPLACE EXISTING DROPPED/SUSPENDED CEILING IN EXISTING OLD-CODE RESIDENTIAL APARTMENT. NO CHANGE TO OCCUPA... | $52,275 | THE 740 CORPORATION |
| Jul 27, 2017 | 121511373 | Alteration Type II | SIGNED OFF | RELOCATION OF AN EXISTING STANDPIPE - FIRE HOSE. NO CHANGE OF USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. | $61,420 | THE 740 CORPORATION |
| Jul 11, 2017 | 121093814 | Alteration Type II | SIGNED OFF | COMBINATION OF TWO EXISTING DUPLEX APARTMENTS, INCLUDING PARTITION CHANGES. NO CHANGE OF USE, EGRESS OR OCCUPANCY UND... | $31,788,231 | THE 740 CORPORATION |
| Jul 6, 2017 | 122263914 | Alteration Type II | SIGNED OFF | RENOVATION AND COMBINATION OF EXISTING DUPLEX APT. #12/13B WITH APT. #14B. WORK TO INCLUDE NON-STRUCTURAL INTERIOR DE... | $5,200,000 | THE 740 CORPORATION |
| Jun 19, 2017 | 121232585 | Alteration Type III | PERMIT ISSUED - ENTIRE JOB/WORK | INSTALLATION OF A TEMPORARY SCAFFOLD AS PER PLANS DURING GENERAL CONSTRUCTION WORK. NO CHANGE IN USE, EGRESS OR OCCUP... | $0 | REPUBLIC SCAFFOLD & HOIST |
| Jun 19, 2017 | 104840861 | Alteration Type II | SIGNED OFF | Masonry and waterproofing repairs as noted on plans. Roof membrane REPLACEMENTS, REPOINTING RECAULKING AND SPOT BRICK... | $95,000 | Brown Harris Stevens Res. Mgmt |
| Jun 16, 2017 | 121232594 | Alteration Type III | PERMIT ISSUED - ENTIRE JOB/WORK | INSTALLATION OF A HEAVY DUTY SIDEWALK SHED APPROXIMATELY 50'LONG AS PER PLANS DURING GENERAL CONSTRUCTION WORK. NO CH... | $0 | REPUBLIC SCAFFOLD & HOIST |
| Jun 15, 2017 | 121872955 | Alteration Type II | SIGNED OFF | MECHANICAL WORK AS PER PLANS. NO CHANGE OF USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. | $752,691 | THE 740 CORPORATION |
| Jun 13, 2017 | 103586077 | Alteration Type II | SIGNED OFF | Masonry & Waterproofing repairs as indictaed by items 2.3, 2.4, 2.5 & 2.6 in accompanying plans. Note repairs... | $15,000 | The 740 Corporation |
| May 24, 2017 | 121511382 | Alteration Type II | SIGNED OFF | EXTERIOR RENOVATION AS PER PLANS. WINDOW REPLACEMENTS. NO CHANGE OF USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. | $350,000 | THE 740 CORPORATION |
| Mar 29, 2017 | 120877435 | Alteration Type III | SIGNED OFF | PROTECTION INSTALLATION FOR TERRACE ROOF REPLACEMENT ON 17TH FLOOR OF THE BUILDING. INSTALLATION SHALL COMPLY WITH BS... | $0 | NEW FORCE CONSTRUCTION CORP. |
| Mar 8, 2017 | 123037212 | Alteration Type II | PERMIT ISSUED - ENTIRE JOB/WORK | ALTERATION OF THE WINDOWS AND THE DOOR ON INVISIBLE FACADE IN THE COMMON AREA OF THE APARTMENT BUILDING. NO CHANGE IN... | $116,000 | BROWN HARRIS STEVENS RESIDENTIAL |
| Mar 3, 2017 | 120794774 | Alteration Type III | SIGNED OFF | ERECT A TOTAL OF 280 LINEAR FEET BY 235 FEET APPROXIMATE HEIGHT OF TUBULAR FEET SCAFFOLD STRUCTURE, PER DRAWINGS. INS... | $0 | NEW FORCE CONSTRUCTION CORP. |
| Mar 3, 2017 | 122534542 | Alteration Type II | SIGNED OFF | REMOVAL, DOCUMENTATION, STORAGE AND REINSTALLATION OF LIMESTONE PANELS TO PERMIT EXAMINATION OF THE EXISTING ANCHOR C... | $68,000 | THE 740 CORPORATION |
| Feb 15, 2017 | 122408297 | Alteration Type II | SIGNED OFF | EXTERIOR WORK ASSOCIATED WITH RENOVATION OF APTS. #12/13B AND #14B TO INCLUDE: INFILL OF EXISTING AC AND WINDOW OPENI... | $28,000 | THE 740 CORPORATION |
| Jan 20, 2017 | 120082123 | Alteration Type II | SIGNED OFF | PINNING, PATCHING, RESETTING & REPOINTING OF LIMESTONE UNITS AT SOUTH AND WEST ELEVATIONS. NO CHANGE TO USE, EGRE... | $671,300 | THE 740 CORPORATION |
| Jan 18, 2017 | 110170724 | Alteration Type III | SIGNED OFF | INSTALLATION OF 396'L HEAVY DUTY SIDEWALK SHED. NO CHANGE IN USE, EGRESS, OR OCCUPANCY | $0 | N/A |
| Dec 27, 2016 | 122814455 | Alteration Type II | SIGNED OFF | — | $65,000 | THE 740 CORPORATION |
| Nov 2, 2016 | 122685558 | Alteration Type III | SIGNED OFF | ERECT A TOTAL OF 10 LINEAR FEET BY 60 FEET APPROXIMATE HEIGHT OF TUBULAR SCAFFOLD STRUCTURE, PER DRAWINGS. INSTALLATI... | $0 | NEW FORCE CONSTRUCTION CORP. |
| Nov 2, 2016 | 122708105 | Alteration Type III | SIGNED OFF | ERECT A TOTAL OF 184 LINEAR FEET BY 8-14 FEET APPROXIMATE HIGH HEAVY DUTY SIDEWALK SHED, PER DRAWINGS, RATED FOR 300 ... | $0 | NEW FORCE CONSTRUCTION CORP. |
| Jun 13, 2016 | 102606093 | Alteration Type II | SIGNED OFF | RENOVATIONS TO APARTMENT,PARTITION WORK AND REPLACEMENT OF FIXTURES ON EXISTING ROUGHING. | $30,000 | 740 CORPORATION |
| May 20, 2016 | 104071807 | Alteration Type II | SIGNED OFF | LOWER LEVEL OF APT 8D ON 8TH FL: PERFORM PLUMBING WORK AND INSTALL HVAC SYSTEM IN CONJUNCTION WITH APARTMENT RENOVATI... | $56,000 | THE 740 CORPORATION |
| Apr 7, 2016 | 122708114 | Alteration Type III | PLAN EXAM - APPROVED | FACADE SITE SAFETY PLAN (SSP) FILED IN CONJUNCTION WITH APPLICATION # 122534542. NO WORK, NO PERMIT, LOGISTIC PLAN ONLY | $1 | NEW FORCE CONSTRUCTION CORP. |
| Mar 9, 2016 | 104036749 | Alteration Type II | SIGNED OFF | Interior renovation of an existing floors, including partition changes, minor plumbing and mechanical work as per pla... | $315,000 | The 740 Corporation |
| Mar 9, 2016 | 103852957 | Alteration Type II | SIGNED OFF | Interior renovation of an existing apartment, including partition changes. No change of use, egress or occupancy unde... | $110,000 | The 740 Corporation |
| Sep 8, 2015 | 122351855 | Alteration Type III | SIGNED OFF | INSTALLATION OF SIDEWALK SHED APPROXIMATELY 115 L.F AS PER PLANS. WORK SHALL COMPLY WITH THE NEW YORK CITY BUILDING C... | $0 | THE 740 CORPORATION |
| Mar 5, 2015 | 140318207 | Alteration Type II | APPLICATION PROCESSED - ENTIRE | INTERIOR RENOVATION AS PER PLANS INCULDING INSTALLATION OF NEW PARTITIONS, FLOORING, AND CEILING REPLACEMENT AS PER P... | $79,295 | THE 740 CORPORATION |
| Jan 20, 2015 | 122061179 | Alteration Type II | SIGNED OFF | MECHANICAL AND PLUMBING WORK IN CONJUNCTION WITH THE PARTIAL DEMOLITION OF INTERIOR NON-LOADBEARING PARTITIONS OF AN ... | $55,000 | . |