Skip to content

Job filings

61-63 East 74 Street, Manhattan • Block 01389 • Lot 0036

24 records

Work filed with the Department of Buildings under its legacy BIS system.

Latest action Job Type Status Work Cost Owner
Feb 22, 2017 122390402 Alteration Type II SIGNED OFF REPAIR AND REPLACEMENT OF BRICK, STONE, AND STUCCO. REPOINTING OF FACADE NO CHANGE OF USE EGRESS OR OCCUPANCY UNDER T... $99,500 BROWN HARRIS STEVENS RESIDENTIAL
Feb 22, 2017 122037492 Alteration Type II SIGNED OFF HEREWITH FILING FOR APARTMENT RENOVATIONS ON THE 5TH FLOOR AS PER DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS O... $761,800 800 PARK AVE CORP.C/O BROWN HARR
Oct 20, 2016 140401429 Alteration Type III SIGNED OFF PROPOSED INSTALLATION OF PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. $0 800 PARK AVENUE CORP
Sep 29, 2016 140462372 Alteration Type III SIGNED OFF PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. $0 EVEREST SCAFFOLDING, INC.
Aug 15, 2016 121729683 Alteration Type II SIGNED OFF INTERIOR ALTERATIONS OF COOP APARTMENT INCLUDING DEMOLITION AND CONSTRUCTION OF NON-LOAD BEARING PARTITIONS, MODIFICA... $1,558,250 800 PARK AVENUE CORPORATION
Jul 21, 2016 121729656 Alteration Type II SIGNED OFF MODIFICATION TO EXISTING MECHANICAL AND PLUMBING SYSTEM. NO CHANGE OF USE, EGRESS, OR OCCUPANCY IS BEING PROPOSED. $252,900 HOLDING'S TRUST
Apr 18, 2016 121791445 Alteration Type II SIGNED OFF APARTMENT RENOVATIONS TO INCLUDE PARTITIONS, CEILING, AND DOOR MODIFICATIONS AS PER PLANS FILED HEREWITH. NO CHANGE I... $100,000 800 PARK CORPORATION
Jan 26, 2016 122179463 Alteration Type II SIGNED OFF HEREWITH FILE PLANS TO RENOVATE 2NW. WORK TO INCLUDE THE REMOVAL OF INTERIOR NON LOAD BEARING PARTITIONS AND FINISHES... $35,275 800 PARK AVENUE CORP. C-O BHS
Oct 21, 2015 140362346 Alteration Type III SIGNED OFF PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. $0 800 PARK AVENUE CORPORATION
Aug 11, 2014 140239221 Alteration Type II APPLICATION PROCESSED - ENTIRE MODIFICATION TO EXISTING MECHANICAL AND PLUMBING SYSTEM. NO CHANGE OF USE, EGRESS, OR OCCUPANCY IS BEING PROPOSED. $226,900 HOLDING'S TRUST
Nov 18, 2011 110312956 Alteration Type II SIGNED OFF HEREWITH FILE PLANS FOR DEMOLITION OF INTERIOR PARTITIONS AND NEW PARTITION LAYOUT, REMOVAL OF ALL EXISTING PLUMBING ... $70,000 800 PARK AVENUE CORP. C/O BHS
Oct 17, 2011 120049722 Alteration Type II SIGNED OFF HEREWITH FILE PLANS FOR MECHANICAL DUCTWORK, INSTALLATION OF HVAC EQUIPMENT FILED IN CONJUNCTION WITH ARCHITECTURALS.... $153,500 800 PARK AVENUE CORP.
Apr 13, 2011 120009775 Alteration Type II SIGNED OFF INTERIOR RENOVATION OF EXISTING APARTMENT, WORK INVOLVES PARTITIONS, PLUMBING, FLOORING/CEILING, ALTERATIONS, REPAIR,... $160,000 N.A.
Feb 16, 2011 120590510 Alteration Type II PERMIT ISSUED - ENTIRE JOB/WORK INSTALL NEW GAS METERS, ASSOCIATED BARS AND PIPING. PROVIDE ENCLOSURE FOR THE ABOVE PIPING. NO CHANGE IN USE, EGRESS ... $35,900 800 PARK AVE LLC
Apr 8, 2010 104424231 Alteration Type II SIGNED OFF REPLACE 2 WINDOWS WITH NEW OPENING. NOCHANGE IN USE,EGRESS OR OCCUPANCY. $5,000 800 PARK AVENUE COORPORATION
Mar 2, 2010 120066926 Alteration Type II SIGNED OFF ALT2 RENOVATION OF AN EXISTING MAISONETTE APARTMENT ON THE 1ST AND 2ND FLOORS. GENERAL CONSTRUCTION AND PLUMBING WORK... $86,000 SHAREHOLDER
Dec 11, 2009 110343432 Alteration Type II SIGNED OFF HEREWITH FILING ALT II APPLICATION TO INSTALL NEW PLUMBING FIXTURES, KITCHEN AND FINISHES. $633,000 CASPIAN CAPITAL ADVISORS
Oct 28, 2009 110320386 Alteration Type II SIGNED OFF REPLACE STEAM PRV STATION AND DOMESTIC WATER HEATERS $385,000 800 PARK AVE CORP
Apr 6, 2009 104731863 Alteration Type II SIGNED OFF Renovation of existing apartment on the 11th floor. Architectural, mechanical and plumbing work. No change in use, oc... $475,000 800 Park Ave. Corp. c/o BHS
Mar 25, 2009 104284356 Alteration Type II SIGNED OFF Herewith filing renovations to an existing duplex unit. Work to include partition changes. There is no change to use,... $280,000 800 Park Avenue Corporation
Aug 8, 2008 104018448 Alteration Type III SIGNED OFF INSTALL PIPE SCAFFOLD 155 FT LONG BY 140 FT HIGH AT 800 PARK AVENUE. DURING REPAIRS. NO CHANGE IN USE EGRESS OR OCCUP... $0 800 PARK AVENUE
Aug 20, 2007 104459462 Alteration Type II SIGNED OFF INTERIOR RENOVATION TO APARTMENT ON 12 FLOOR, REMOVE AND CONSTRUCT NEW PARTITIONS, UPGRADE HVAC SYSTEM, REPLACE RELOC... $105,000 800 PARK AVENUE CORPARATION
Jan 16, 2007 104030996 Alteration Type II SIGNED OFF EXTERIOR FACADE REPAIRS NO CHANGES $625,000 800 PARK CORP BROWN/HARRIS/STEVE
Dec 14, 2006 104018439 Alteration Type III SIGNED OFF Install heavy duty sidewalk shed a total of 245 ft long at 800 Park Avenue, - during remedial repairs. Work shall com... $0 800 PARK AVENUE